Consent 1.G.
Regular City Council Meeting
- Meeting Date:
- 09/28/2009
- TITLE
- Change Order # 1 - Well Pump Replacements at Wastewater Plant
- PRESENTED BY:
- David Mumford
- Department:
- Public Works
Presentation:
PROBLEM/ISSUE STATEMENT
Star Service was awarded a contract to replace dewatering well pumps at the Wastewater Treatment Plant. The contract was for $128,400.00. After beginning the project, Star Service noted that the contract had failed to identify one additional well that should have been included in the project. The cost of the additional pump and installation was determined to be $15,000.00. It was also discovered that check valves were worn and in need of replacement, which was not originally anticipated. It was determined that the cost of the check valve replacement is $10,000.00. It was also determined that the as-built drawings used in the bid documents were incorrect, which resulted in the need for some additional piping in several of the wells. The cost for the additional pipe is $2,250.00. The contract time is also being extended by 60 days to allow completion of all of the work.
ALTERNATIVES ANALYZED
The Council may:
- Approve Change Order #1; or
- Not approve Change Order #1.
FINANCIAL IMPACT
The cost for Change Order #1 will be:
Original Contract Amount Change Order Amount % Increase to Contract
$128,400 $27,250.00 21.2%
There are sufficient funds in the Wastewater Budget to cover these additional costs.
| • Additional pump and installation | $ 15,000.00 |
| • 10 Check valves and installation | $ 10,000.00 |
| • Piping to match existing well depths | $ 2,250.00 |
| Total Cost | $27,250.00 |
Original Contract Amount Change Order Amount % Increase to Contract
$128,400 $27,250.00 21.2%
There are sufficient funds in the Wastewater Budget to cover these additional costs.
RECOMMENDATION
Staff recommends that Council approve Change Order #1 – Well Pump Replacements at the Wastewater Treatment Plant – in the amount of $27,500.00. Staff also recommends that the Council authorize the City Administrator to approve an additional $10,000 for other changes that may arise. Staff further recommends the contract time be extended by 60 days.
APPROVED BY CITY ADMINISTRATOR
Attachments
No file(s) attached.