INTRODUCTION

On March 1, 2019, the Planning Division received an application for major plat approval for the proposed Bar Eleven Estates Subdivision.  The property is generally located on the south side of Plateau Road approximately .25 miles west of Bitterroot Drive. This subdivision would create 7 lots from a 17.55-acre parcel of land.  Lots 5 and 6 are proposed to be developed as condominium type development with multiple single family dwelling units on a single lot.  The proposed lots will be developed as single family residential.  The land is currently dryland grass and is zoned Residential 9600 (R-96).

RECOMMENDATION

Staff recommends that the Yellowstone County Planning Board recommend the Board of County Commissioners conditionally approve the preliminary plat of Bar Eleven Estates Subdivision and adopt the Findings of Fact as presented in the staff report.

PROPOSED CONDITIONS OF APPROVAL
Pursuant to Section 76-3-608(4), MCA, the following conditions are recommended to reasonably minimize potential adverse impacts identified within the Findings of Fact.

1. To protect public health and safety, prior to final plat approval the applicant will receive approval from the MDEQ for the proposed water systems, septic systems and the proposed storm water management.
2. To ensure compliance with requirements of subdivision regulations, prior to final plat approval the applicant will add a paragraph in the SIA under the heading Conditions That Run With The Land to notify future home owners of their responsibility to install sidewalk along their street frontage.
3. To ensure public access to the public park within the subdivision, prior to final plat approval the applicant will provide easement documents that allow the public to drive up the access along the eastern edge of the public park at Lot 7.
4. To minimize the effects on local services, prior to final plat approval, the applicant will coordinate with the USPS for locating and providing the correct amount of space for safely delivering the mail to the residents.
5. To minimize effects on the natural environment, prior to final plat approval a weed management plan and property inspection shall be completed by the County Weed Department.   
6. To ensure the placement of easements for private utility providers, prior to final plat approval the applicant will coordinate with private utility companies to provide needed easements within the proposed subdivision.
7. Minor changes may be made in the SIA and final documents, as requested by the Planning and/or Public Works Departments to clarify the documents and bring them into the standard acceptable format.
8. The final plat shall comply with all requirements of the County Subdivision Regulations, rules, regulations, policies, and resolutions of the Yellowstone County, including laws regarding moving houses onto or off the property, and the laws and Administrative Rules of the State of Montana.  

PLAT REVIEW DISCUSSION
Planning staff gave a brief presentation about the proposed subdivision and stood for questions.  There were clarifying questions from board members regarding parkland dedication. Staff provided some answers and deferred the others to the applicants agent. There were no further questions for staff. Planning Board President Darell Tunnicliff asked if the agent wished to address the board.  The agent, Craig Dalton, addressed the board and clarified question about the proposed park land and why there is a proposed septic system in the park and its location in the park.  Board members raised concerns about the use of park land as septic systems for the subdivision.  It was felt the septic system should be separate from the park land with an HOA to maintain the septic system. Another question was when the easement for the parkland access would be built.  Mr. Dalton answered that it will be built when the main paved road is constructed. There were no further questions from the Planning Board.

VARIANCES REQUESTED

No variance has been requested.

PROCEDURAL HISTORY

  • Pre-application meeting January 24, 2019
  • Preliminary plat application submitted to the Planning Division on March 1, 2019
  • Departmental review meeting March 14, 2019
  • Preliminary plat resubmitted March 21, 2019
  • Planning Board plat review April 9, 2019
  • Planning Board public hearing April 23, 2019
  • Preliminary plat to Yellowstone County Board of County Commissioners on May 14, 2019
  • 60 working-day preliminary plat review period ends May 24, 2019

PLAT INFORMATION

General location:                                            South of Plateau Road approximately .25 miles west of Bitterroot Drive
 
Legal Description:                                          S02, T01 N, R26 E, W2S2 Lot 1; S02, T01 N, T26 E E2W2 Lot 1
 
Owner/Subdivider:                                         Production Consulting, LLC
 
Engineer/Surveyor:                                         Performance Engineering
 
Existing Zoning:                                             Residential 9600 (R96)
 
Existing land use:                                            Dryland grass and shrubs
 
Proposed land use:                                          Residential
 
Gross and Net area:                                         17.55 acres / 16.37 acres
 
Proposed number of lots:                                 7
 
            Max. lot size:                                     3.49 acres
            Min. lot size:                                      1.19 acres

Parkland requirements:                                 The required parkland dedication is 0.811 acres; the applicant is proposing to
                                                                      dedicate 3.198 acres
 

Attachments