Item 1.F.
|
| City Council Regular | |
| Date: | 01/24/2022 |
| Title: | Acceptance of Utility Right-of-Way Easement from Tractor & Equipment Co. |
| Presented by: | Debi Meling |
| Department: | Public Works |
| Presentation: | No |
RECOMMENDATION
Staff recommends that City Council accept the Utility Right-of-Way Easement from Tractor & Equipment Co.
BACKGROUND (Consistency with Adopted Plans and Policies, if applicable)
As part of the development of the recently annexed area south of I-90, proposed to be developed as the Coca-Cola bottling facility, water and sewer mains will be extended by the developer to serve the facility. A water main and sanitary sewer main will be constructed, generally to the west from East Lane to Parcel 11A of Certificate Survey 1391, located along Harnish Boulevard (the proposed Coca-Cola bottling site). A portion of the water and sanitary mains are proposed to be located along the north side of Tracts 1A and 1B of Certificate of Survey 1391, which is owned by Tractor & Equipment Company. City staff has reviewed this portion of the route for the water and sanitary sewer mains. Tractor & Equipment Co. has agreed to grant to the City a 30-foot wide utility easement through their property for the construction of the water and sanitary sewer mains. In addition, the easement will allow the City perpetual access to maintain the water and sanitary sewer mains.
ALTERNATIVES
The City Council may:
- Approve the easement; or
- Not approve the easement. If not approved, the developer will be required to propose a different route for the water and sanitary sewer mains which will raise the cost of construction considerably.
FISCAL EFFECTS
There is no cost to the City for acceptance of the easement. However, because the city is paying for the oversizing of the mains in accordance with city policy, the cost to the city for an alternate route would increase.