Skip to main content

AgendaQuick™

View Agenda Item

Regular
 
Board of Adjustment
Date: 04/06/2022
Title: Variance 1343 - Costco Wholesale - Parking Siting
Presented by: Nicole Cromwell
Department: Planning & Community Services
Presentation: Yes

Information

RECOMMENDATION

Planning staff is recommending denial and adoption of the findings of the criteria for Variance 1343.

BACKGROUND (Consistency with Adopted Plans and Policies, if applicable)

This is a variance request from Section 27-409 (Table 27-400-6) requiring new parking lots in the Heavy Commercial (CX) zone to be either in the side yard or rear yard of a building. The property is intended for the development of a new +166,000 square foot Costco Wholesale warehouse and fueling facility at 3840 Zoo Drive. The property consists of 6 parcels that total 24.91 acres of land generally located at the intersection of South Shiloh Road and Zoo Drive. This is a prominent corner location for the regional community center developments at the Zoo Drive exit off Interstate 90. The proposed site plan places the new building at the south edge of the property about 350 feet west of Shiloh Rd and about 500 feet south of Zoo Drive. Future expansions include a potential 25,000 square foot market delivery operating center (MDO) on the west side of the warehouse and additional fuel pumps. The applicant proposes 852 parking stalls with 61% of those stalls in the front yard of the new building. Approximately 39% of the parking stalls will be in the easterly side yard of the new warehouse.

The current plan is to relocate the current Costco Warehouse from 2290 King Ave West to this new location on Zoo Drive. The proposed location and this location are close to major I-90 interchanges. The current location is about 11.5 acres with a 141,000 square foot building. The current location shares a parking lot with the adjacent At Home store. The At Home store is about 120,000 square feet. The At Home parking lot holds 433 spaces and the Costco Wholesale parking lot holds 562 spaces. There is no physical separation between the parking lots. More than 90% of the parking spaces are in front of the buildings on King Ave West. The Costco on King Avenue West was built in 1991. 

The new zoning code adopted by the city in January 2021 is intended to help achieve the goals of the 2016 Growth Policy. Those goals include making sure investments in new infrastructure increase the stability and sustainability of existing property values, create quality entryways to the city, and provide safe transportation systems that support all modes of travel.  A key feature of the new code is the requirement to enhance all city streets by bringing buildings to the street frontage of lots and/or placing parking areas to the side or rear of buildings. The CX zone is not a zone where the building must be placed along the street front, but parking is required to be in the side yard or rear yard of the new structure. Both the building location and the parking location contribute to making the most of the city's investment in the street and increases the safety of all modes of travel. Streets that are lined with buildings tend to slow the speed of traffic while streets lined with parking lots and fewer structures tend to increase traffic speeds. The driver's perception of a safe travel speed is tied directly to objects and structures within the driver's field of vision. Driver's will tend to ignore posted speed limits if the design of the road and the lack of roadside structures indicates a higher speed is just as safe as the posted limit. There are several arterial, collector and even local streets in Billings that encourage higher speeds through design and the lack of roadside structures and other improvements. 

This request will be a precedent case before the Board of Adjustment. The Board has granted two other variances in the past year related specifically to the new code requirements for commercial or industrial zones. The first variance related to the required build-to zone for a new building on Blue Creek Road in a mixed use zone. The parcel had a physical hardship - a mapped flood plain - across the entire frontage of the parcel. This flood plain would not allow the placement of the new building at the required build-to zone. The board conditionally granted this request. A second variance was conditionally approved last month for a larger building sign for the new Coca-Cola bottling plant on South Frontage Road. The board found there was a hardship with this location that was not applicable to other land in the area, and the board had granted similar sign variances in the past.

The applicant states the hardship with this location is its inability to relocate the Canyon Creek Ditch that crosses the northwest corner of the property. The agent claims this factor along with the Costco Wholesale building prototype and future expansions makes placing all the parking to the side or rear of the building not possible. Staff agrees that placing a building on top of the ditch is not possible and relocation of the ditch to create more than a 22% deflection is also not advisable. However, piping the ditch and paving over this ditch section is allowable and has been done in multiple locations from this location eastward on this ditch. The ditch creates some limited challenge to building location and site circulation, however it does not require the building to be set back 500 feet from Zoo Drive. 

Canyon Creek Ditch begins 2.5 miles south and west of Laurel at the intake from the Yellowstone River and proceeds northerly and easterly through farm land. It crosses under Interstate 90 just west of the Mossmain interchange between Laurel and Billings. It parallels the interstate and the BBWA Canal for several miles until it moves north. Canyon Creek Ditch crosses under the street at 4457 Neibauer Rd. From there the ditch continues parallel to Neibauer Rd and then heads north along the west side of South Shiloh Road. It crosses under South Shiloh Road just south of the subject property near the intersection with Summer Lane. The ditch then runs north and east across the subject property until it crosses under Zoo Drive. The ditch crossing on this site separates about 2.7 acres of land between the ditch and S Shiloh Rd. (see attached maps and Photos).

It is possible to pipe the open ditch as this has occurred in several locations along its length from its intake on the Yellowstone south and west of Laurel to its outlet into the City/County drain at Moore Lane. For example, the ditch is entirely piped under the parking and driveway of the Weber Warehouses at 3311 and 3335 Conrad Road north and east of this location. It then runs east and north but south of King Avenue West. The underground ditch crosses under King Ave West at 24th St West - near the Qdoba restaurant in front of the current Costco warehouse and continues underground until it reaches the 1800 block of King Ave West where it re-surfaces. The ditch eventually drains into the City/County Drain at Moore Lane. The commercial and industrial developments to the north and east of this property including the major commercial development at King Ave West and 24th St West has occurred around and in conjunction with the Canyon Creek Ditch. There are many areas where the ditch is piped and below parking areas, streets and sidewalks along its length east of this location. According to filings with the state, the Canyon Creek Ditch company provides irrigation ditch water to 1,630 members and receives approximately $54,000/year in member dues for this service. The ditch company has been in continuous existence since 1883 and claimed water rights from the Yellowstone River in 1886. 

Planning staff has reviewed Costco's preferred site plan and is recommending denial to the Board of Adjustment. The applicant has proven a partial hardship with the land due to the location of the Canyon Creek Ditch. However, the site is nearly 25 acres in area and there are multiple options for a site lay out that does not require 61% of the parking to be between the building and the Zoo Drive street frontage. The applicant has not demonstrated the requested variance is the minimum variance from the code requirement to accommodate the development and not cause unnecessary hardship. The building can be much closer than 500 feet from the Zoo Drive street frontage without impinging on the existing Canyon Creek Ditch. The applicant can pipe and pave over the ditch in its current location and use this area of the site for parking, drive aisles and site circulation. The applicant has not submitted a site plan that includes this alternative. Costco when it first contacted the City for this project had several site layouts that did keep the parking next to or at the south portion of the site and oriented the building and its entrance to face the parking area and address traffic circulation. Since those first site proposals, Costco has abandoned them and provided the proposed site plan included with this variance application. Planning staff and Costco have provided several building orientations as attahcments that show differet options for building orientation, only some of which conflict with the ditch location. Most recent conversations with the Costco team have been fruitful in producing some result related to the street frontage and how it can be improved with landscaping, if the variance were to be granted. While staff is appreciative of these efforts, the building location has remained the same.

APPLICATION DATA
OWNER: Shiloh 47 LLP
AGENT: Barghausen Consulting Engineers, Sean Anderson
PURPOSE:  To construct a new Costco Wholesale warehouse
LEGAL DESCRIPTION: Lots 4-8 and 9A of Block 2, Shiloh Business Park Subdivision
ADDRESS: 3840 Zoo Drive
SIZE OF PARCEL: 24.91 acres
ZONING: Heavy Commercial CX
EXISTING LAND USE: vacant
PROPOSED LAND USE: Costco Wholesale warehouse, fueling station and future MDO (25,000 sf)

SURROUNDING ZONING & LAND USE
NORTH: Zoning: CX
Land Use: Agriculture
SOUTH: Zoning: CX
Land Use: vacant
EAST: Zoning: CX
Land Use: Nissan car dealership
WEST: Zoning: Neighborhood Mixed Use (NMU) and Agriculture (A) - County
Land Use: Agriculture

Planning staff is recommending denial based on staff recommended findings of the variance review criteria.

STAKEHOLDERS

Planning staff notified owners by mail, posted the property and published the legal ad as required. As of the date of this staff report, no comments or concerns have been registered with the Planning Division. A few email inquiries did come in to the City Council and staff did visit with one interested Billings resident about the project and the plans for Costco to move from its King Avenue location.

ALTERNATIVES

The Board of Adjustment may:
  • Deny the requested variance and adopt the proposed findings of fact for the review criteria as recommended by the Planning staff;
  • Approve the requested variance with conditions and amended findings of fact for the criteria;
  • Approve the requested variance with no conditions and amended findings of fact for the criteria;
  • Allow the applicant to withdraw the variance request; or
  • Delay action on the variance to a future BOA meeting.

FISCAL EFFECTS

Approval or denial of the requested variance will have no financial effect on the Planning Division budget.

SUMMARY

Prior to approval, the Board of Adjustment shall ensure that the determinations for variances (Sec. 27-1627.D and E.), as outlined below, have been satisfied:
Section 27-1627.D
1) That special conditions and circumstances exist which are peculiar to the land, the lot or something inherent in the land which causes the hardship, and which are not applicable to other lands in the same district.

Applicant: The project land includes unique conditions and constraints that impact Costco's ability to meet the specific parking siting requirements of the Zoning Code that do not apply to other properties in the same district.   These include an irrigation ditch that traverses the site between Zoo Drive and Shiloh Drive, and limited direct access to the surrounding street network. The irrigation ditch includes a 50-foot easement that prevents the siting of any structures along Shiloh Drive and significantly restricts the buildable area along the Zoo Drive frontages. Costco consulted with the irrigation district on potential solutions to mitigate the site impact of the canal. However, the functional and technical requirements prohibit any significant relocation of the canal. Costco would need to significantly reduce the size of the warehouse building in order to locate it along the Zoo Drive frontage and would not be able to construct the MDO. Additionally, the project area is effectively a corner property with only two frontages that have direct access to adjacent streets. Opportunities to create driveways from the two frontage streets are limited due to the size and design requirements of the building and fuel facility, as well as the setback restrictions of irrigation facilities in the northwest corner of the project site. Also, the driveway entrance to Shiloh Drive is restructured to a right in/right out and is generally fixed in location due to the intersection with Zoo Drive to the north and existing off- site driveways and the intersection with Pierce Parkway to the south. As a result, these access restrictions make it difficult to place the building closer to the street frontages without requiring the closure of at least one driveway. Limiting direct access to the surrounding streets' network would force members to use the shared driveway to the east of the site, creating unnecessary congestion for both Costco and the adjacent parcels. The combination of these unique conditions creates a significant hardship that restricts Costco's ability to meet the strict application of the surface parking siting standards without creating a detrimental impact to the layout or operation of the development.

Staff: There are some special circumstances that exist which are peculiar to the lot that are not applicable to other lots in the same district. The property is slightly encumbered by the Canyon Creek Ditch that crosses the northwest corner of the property. Approximately 10% of the land area is on the north and west side of the ditch. It is not possible to re-locate the ditch alignment or to place any structure over the ditch. It is possible to pipe and pave over the ditch crossing. Parking and driving over the piped ditch is feasible. This has been done in several areas to the north and east of the subject property where ditch water users no longer exist. This can be done without moving the ditch. The applicant has not demonstrated this small hardship requires the placement of the building 500 feet from Zoo Drive and 350 feet from S Shiloh Road. The applicant's proposed site plan puts 61% of the surface parking between the building and Zoo Drive (the front yard) while the ditch crossing only effects less than 10% of the land area. Further, there are vehicular accesses from three sides of the property via Shiloh Road, Zoo Drive and two local roads that connect with Pierce Parkway, one that runs behind the Nissan dealership and right into the Costco site, and the other that runs south to the west of the Office 365 Building and intersects Pierce Parkway to the south. There are multiple ways to enter and exit the Costco property directly and indirectly from the surrounding street network.

2) That a literal interpretation of the provisions of this Chapter would deprive the applicant of rights commonly enjoyed by other tracts in the same district.

Applicant: As demonstrated by the enclosed alternative layouts, the literal application of the surface parking siting standards on this specific site makes it practically infeasible to place the building along either street frontage. Due to the location of the irrigation ditch and associated no-build easement, there is no area along the Shiloh Drive frontage that can accommodate the warehouse building. Similarly, the available developable area along Zoo Drive is not large enough to accommodate the warehouse, which requires access on the east side of the building for the tire center and the west for loading. The limited space would also prohibit the future addition of the MDO. In order to meet the strict application of the surface parking standards, Costco would need to reduce the size of the warehouse and limit future growth at this location. This would significantly restrict Costco's ability as a regional retail operator to meet the anticipated demand of its members and would limit its rights to fully utilize the development standards and allowances of the CX zone, which is intended to support heavy commercial uses.

Staff: This application is a request of first impression. There are no similar or precedent cases for the board to weigh for this application. Under the previous zoning code for the city, parking lots were allowed in any location on a lot in relation to the building and street frontage. Most of the nearby developments have the buildings centered on the lots with parking lots surrounding the structure. (See attachments). Several of the existing hotels on the north/east side of Zoo Drive close to the interstate are placed close to the front property line with fewer than 50 parking spaces between the building and Zoo Drive. Large front yard parking lots are an outdated pattern of suburban commercial development. It is inefficient and a costly development pattern to sustain over time. The right to place parking in the front of a building is commonly enjoyed by some previous developments in the area. The rights commonly enjoyed by others in the district are now considered non-conforming site characteristics. It would not be consistent with current regulations to grant a variance based on prior development standards. New developments are required to meet current regulations - not prior regulations. It also appears that design preferences for the site are getting confused with what may actually be developed on the site for a Costco facility. It is not the case that the site plan proposed by Costco is the only way the site may be designed for this facility and for it to still meet the needs of customers and Costco.

3) That granting the variance requested will not confer on the applicant any special privilege that is denied by this zoning code to other land in the same district.

Applicant: Granting the requested variance to the Zoning Code parking siting standards is supported by this narrative, along with the enclosed proposed and alternative layouts and associated parking waiver. As described in this narrative, Costco intends to develop a warehouse, fuel facility, and future MDO to address the limitations of its current facility in Billings and continue to serve its members in the surrounding region. The layout of the facility, including the location and amount of parking, is based on a demand analysis prepared for this specific location. Reviewing the alternative layouts demonstrates that strict compliance with the Zoning Code's parking siting standards creates unnecessary hardship and limits the rights of Costco to develop this project in a way similar to other tracts within the surrounding district. Specifically, applying those standards would result in a layout that restricts adequate access to the site, limits building size, and constrains site circulation. As a result, these combined findings support the decision to grant the requested variance based on the merits of the project and would not act as a special privilege to the applicant that would be otherwise denied within the same zoning district.

Staff: Granting this variance as requested may confer on the applicant a special privilege because this request is a precedent request before the board. While surrounding properties may have developed in a similar way under the previous zoning regulations, the new zoning code is intended to move away from this style of development. Variance requests should tend to be the minimum required to accommodate the proposed construction. The preferred site plan does not exhibit any effort to minimize the variation from the zoning requirement. The new building is proposed to be just 60 feet off the rear property line and fully 500 feet south of the Zoo Drive frontage.

4) That the granting of the variance will be in harmony with the general purpose and intent of this zoning code and with the Growth Policy.

Applicant:
The uses associated with the project are all allowed as-of-right and granting of a variance to the surface parking siting requirements would allow for the development of a uniquely constrained parcel and would remain consistent with the purpose of the CX zone. Specifically, the CX zone is designed to provide standards and use allowances to accommodate large, auto-oriented commercial uses that are suited for corridors located away from residential and mixed-use areas. Allowing a variance to provide flexibility to the surface parking siting requirements does not alter the type or intensity of uses associated with the project in a way that would be out of character for the surrounding area or the intent of the CX zone. The project is consistent with the types of large-format auto-oriented commercial uses in the surrounding CX zoning district. Granting of the variance to allow for the development of this parcel is also consistent with the guidelines described in the 2016 Billings Growth Policy. Specifically, it supports the broad goal of "Essential Investments" by allowing Costco to relocate its existing operations to a neighborhood that is zoned for the type of regional retail services it provides. As a result, Costco is able to continue providing essential goods and services to members within the surrounding region, a stated guideline within the Growth Policy. A variance also allows Costco to develop an area that currently sits vacant with a high-quality building, provide attractive landscape along the street frontages, and contributes to the "Community Fabric" of an established commercial area that includes similar auto-oriented commercial uses. The addition of the Costco development to this area also contributes to providing "Strong Neighborhoods" that are designed to be safe, attractive, and provided essential services to the greater community. Based on the findings provided in response to the required decision- making criteria, the approval of a variance for this project would support a Costco development that is harmonious with the intent of the Zoning Code and stated goals and guidelines of the City Growth Policy.

Staff: Granting this variance as requested will not meet the general purposes and intent of the zoning regulations and the 2016 Growth Policy. The Growth Policy guidelines support new developments that support existing investments in infrastructure, stabilize and grow the city's tax base and enhance entryways to the city. The proposed development is not in conformance with these stated goals and guidelines. The zoning regulations were adopted to specifically require the placement of surface parking lots to the side or rear of buildings to minimize the inefficient use of land on the street frontage, create street frontages that benefit the community at large, minimize the need for over-sized signs, and allow for the sustainable and adaptable use of commercial land. 

Section 27-1627.E
2) In granting any variance, the Board may prescribe appropriate conditions and safeguards in conformity with this Zoning Code. Violation of such conditions and safeguards, when made a part of the terms upon which the variance is granted, shall be deemed a violation of this Zoning Code;

Staff is not recommending conditions for the variance request. Below are draft conditions if the Board adopts different findings for the above criteria that what staff has presented.
1. The variance is to allow 61% of the surface parking spaces to be in the front yard of the proposed warehouse building at 3840 Zoo Drive. The front yard is any space between the proposed building and Zoo Drive. The variance would be granted based on the March 30, 2022 site plan Costco provided and that is attached to this variance memo. No other variance is intended or implied.
2. The variance is limited to Lots 1-8 and 9A of Block 2, Shiloh Business Park Subdivision, Amended and generally located at 3840 Zoo Drive.
3. The applicant will enhance the parking lot within the front yard by installing separated pedestrian sidewalks through the rows of parking and a marked pedestrian crossing for any drive aisle across the building facade.
4. There will not be a continuous drive aisle across the main entry facade of the proposed warehouse. The only area where a drive aisle may be located is behind the "load-out" parking spaces along the main entry facade. (see preferred plan notes). The drive aisle between the accessible parking spaces and the building will be closed off to vehicles or the accessible spaces moved closer to the building. There will be no drive aisle between surface parking space and the building. Fire lanes across building facades are not required within the City of Billings.
5. The street frontage landscaping on Zoo Drive and South Shiloh Rd will not include any evergreen trees or shrubs that are intended to obscure the subject property either at the time of installation or at maturity. All street trees installed shall be trimmed up so the lowest branch height at installation is at least 8 feet above grade. .
6. No outdoor announcement system shall be audible beyond the exterior property lines.
7. All parking lot lighting shall be installed at a maximum height of 20 feet, including the base and fixture. All parking lot and building wall lighting - except for signage - shall have full cutoff shields so no part of the lens or fixture is visible.
8. The applicant will apply for a building permit within 2 years of Board approval and complete the project within 5 years of Board approval.
9. Failure to begin or complete actions required by this approval within the time limits set forth shall void this variance.
10. These conditions of variance approval shall run with the land described in this authorization and shall apply to all current and subsequent owners, operators, managers, lease-holders, heirs and assigns.

3) The Board shall prescribe a time limit within which the action for which the variance is required shall be begun or completed, or both. Failure to begin or complete such action within the time limit set shall void the variance.
Staff is not recommending any conditions of approval. If the Board chooses to adopt different findings of the primary criteria, there are time limits prescribed in the draft conditions.

4) Under no circumstances shall the Board grant a variance to allow a use not permissible under the terms of this zoning code in the district involved. A variance shall not be a grant of special privilege inconsistent with limitations placed upon other properties in the district.
The granting of this variance would not allow a use that is not allowed in the zoning district. Large format retail and wholesale businesses are allowed uses in the CX zone.
 

Attachments