Action   3.
Flood Control District Meeting
Engineering & Natural Resources
Meeting Date:
12/13/2022
Title:
Approve FCD Bella Vista - Coyote Wash Design Contract
Submitted By:
Jackie Watkins, Engineering & Natural Resources
Department:
Engineering & Natural Resources
Presentation:
No A/V Presentation
Recommendation:
Approve
Document Signatures:
BOS Signature NOT Required
# of ORIGINALS
Submitted for Signature:
1
NAME
of PRESENTER:
Jackie Watkins
TITLE
of PRESENTER:
Engineering & Natural Resources Director
Mandated Function?:
Not Mandated
Source of Mandate
or Basis for Support?:
Docket Number (If applicable):

Information

Agenda Item Text:

Approve Contract between JE Fuller Hydrology & Geomorphology, Inc. and Cochise County Engineering & Natural Resources for Bella Vista Detention Basin Project Design, in the amount of $309,157.

Background:

In July of 2022 the Flood Control District Board approved a grant with the US Army Environmental Command in the amount of $1,500,000, for construction of Stormwater Management project Bella Vista/Coyote Wash Detention.  Cochise County Engineering and Natural Resources received a proposal from JE Fuller to provide design and construction plans for a detention basin next to the Bella Vista wash that will help reduce flooding along this wash.  The design of this project is the match from the FCD for the grant.
 

Department's Next Steps (if approved):

FCD to have Consultant complete construction plans and specifications for the Bella Vista Detention Basin Project. 

Impact of NOT Approving/Alternatives:

If not approved, ENR will not have construction plans to reduce flooding along this drainage area which would result in the inability of the Flood Control District to complete the Bella Vista/Coyote Wash Flood Control project as a good faith member of the Cochise Conservation and Recharge Network.  In addition, it would be detrimental to Fort Huachuca's resilience and efforts to protect the San Pedro River and its missions.
 

To BOS Staff: Document Disposition/Follow-Up:

Staff will final contract with JE Fuller

Fiscal Impact

Fiscal Year:
2023
One-time Fixed Costs? ($$$):
$309,157
Source of Funding?:
261-4110-4103-421.000

Fiscal Impact & Funding Sources (if known):

This is a budgeted project.