Switzer Canyon/Turquoise Intersection Improvements

DESIRED OUTCOME:

To move forward with the design and ultimate construction of a roundabout at the Switzer Canyon/Turquoise Intersection.

INFORMATION:

This project is, in part, funded by a Highway Safety Improvement Program (HSIP) Grant through the Flagstaff Metropolitan Planning Organization (FMPO) under the Transportation Improvement Program (TIP). As part of the grant process a project assessment was completed that compared three alternatives at the Switzer/Turquoise intersection.

- Stop Signs with intersections improvements
- Traffic Signal with intersections improvements
- Roundabout

The preferred safety measure is to place a roundabout at this location. Factors that were considered in choosing a roundabout are:

- Improved Traffic Flow
- Highest Benefit/Cost Ratio
- Community Acceptance
- Other benefits:
   • Low speed environment
   • Reduction in fuel use and emissions
   • No signal equipment to install and maintain
   • Quieter neighborhood

This Work Session presentation is to determine Council support of a roundabout at this location.  Staff wouldn't normally request this level of Council input on the technical solution for a problem intersection.  However, staff understands the community sensitivity to roundabout installation at this time and would like to ensure Council is comfortable with Transportation Engineering's preferred alternative of a roundabout.   
 
 
 