Agenda Item # 12.E.
City Commission Regular Meeting - 5:05 PM
- Meeting Date:
- 12/15/2025
- Re
- PD2024-00007 - 2721 S Jenkins Road - Pulte-Cornerstone Master Planned Development
- Submitted For:
- Kev Freeman
SUBJECT:
PULLED AT REQUEST OF STAFF - Quasi-Judicial Hearing - Ordinance 25-037 - Review and approval of a Zoning Map Amendment by applicant Leslie Olson to change the zoning of two (2) parcels of land from General Commercial Zone, C-3, to Planned Development, PD at 2721 S Jenkins Road, more specifically at Parcel ID(s): 2324-413-0000-000-9 & 2324-431-0001-000-2 - FIRST READING.
SUMMARY:
Per Article V Sections 125-212, and 125-314 of the City Code, the applicant is requesting approval of a Master Planned Development (PD) Zoning District. The application proposes a two-hundred-and-fifty-unit fee simple single-family residential master planned development community with a range of home sizes, a range of designs, and amenities such as a linear park connecting the recreational area to a pocket park providing additional buffer for the new neighborhood from I-95. The linear park leverages a creative use of stormwater facilities by transforming them into bioswales and rain gardens through which a meandering 1/3 mile long walking path winds, with resting stops overlooking the naturalized and lake vistas. At the southwest corner of the property, and the terminus of the linear park, lies a pocket park where a sculptural art installation is proposed. This art installation will be visible to the travelling public on I-95 and is intended to create a beautiful and unique sense of arrival in the City of Fort Pierce while exhibiting the quality of design homebuyers will find in the new Pulte Cornerstone neighborhood. The site is designed with a grid network of streets which have been designed to minimize lots directly adjacent to I-95.
History
On November 3, 2008, the City Commission approved a site plan to construct a 383,605 square foot commercial development consisting of eight (8) buildings by the name of Newberry Fields. The anchor tenant for the proposed development was a Target retail store.
On December 9, 2024, the Planning Board reviewed and recommended approval of the concurrent application for a Future Land Use Amendment of the subject property. The applicant requested to change the Future Land Use from GC, General Commercial to RM, Medium Density Residential.
On August 11, 2025, the Planning Board recommended approval of the proposed Master Planned Development with fourteen (14) conditions. The applicant has since resubmitted recommended amendments to conditions and a new phasing plan with a new bus stop location.
On October 13, 2025, an updated proposal for the Pulte-Cornerstone Master Planned Development was presented to the Planning Board due to the applicant’s concerns with several conditions that were recommended, and the submittal of a new phasing plan. During the meeting, the applicant presented a completely different phasing plan that was not included in the October 13th, 2025, Planning Board agenda. The St. Lucie County Schools representative stated that the School Board would prefer the bus stop location to be at the amenity center. Both the Staff and the Planning Board agreed that project conditions and approvals should be negotiated and agreed upon by the Technical Review Committee and the Applicants before being presented to the Planning Board for a recommendation. Therefore, a motion was made to table the subject agenda item until the November 10th, 2025, Planning Board meeting. The motion was approved unanimously by the Planning Board. The applicant has since provided a new phasing plan (includes the cross-access and bus stop at the amenity center in phase 1), updated developer’s agreement, HUD Attenuation Guidelines, and FDOT Noise Attenuation Guidelines.
Should this application be granted, an Application for a Final PD will be required prior to application for Building Permits.
History
On November 3, 2008, the City Commission approved a site plan to construct a 383,605 square foot commercial development consisting of eight (8) buildings by the name of Newberry Fields. The anchor tenant for the proposed development was a Target retail store.
On December 9, 2024, the Planning Board reviewed and recommended approval of the concurrent application for a Future Land Use Amendment of the subject property. The applicant requested to change the Future Land Use from GC, General Commercial to RM, Medium Density Residential.
On August 11, 2025, the Planning Board recommended approval of the proposed Master Planned Development with fourteen (14) conditions. The applicant has since resubmitted recommended amendments to conditions and a new phasing plan with a new bus stop location.
On October 13, 2025, an updated proposal for the Pulte-Cornerstone Master Planned Development was presented to the Planning Board due to the applicant’s concerns with several conditions that were recommended, and the submittal of a new phasing plan. During the meeting, the applicant presented a completely different phasing plan that was not included in the October 13th, 2025, Planning Board agenda. The St. Lucie County Schools representative stated that the School Board would prefer the bus stop location to be at the amenity center. Both the Staff and the Planning Board agreed that project conditions and approvals should be negotiated and agreed upon by the Technical Review Committee and the Applicants before being presented to the Planning Board for a recommendation. Therefore, a motion was made to table the subject agenda item until the November 10th, 2025, Planning Board meeting. The motion was approved unanimously by the Planning Board. The applicant has since provided a new phasing plan (includes the cross-access and bus stop at the amenity center in phase 1), updated developer’s agreement, HUD Attenuation Guidelines, and FDOT Noise Attenuation Guidelines.
Should this application be granted, an Application for a Final PD will be required prior to application for Building Permits.
RECOMMENDATION:
Staff’s recommendation is for the City Commission to APPROVE the Master Planned Development and Site Plan subject to the 14 Conditions as noted.
Conditions
The approximate date when construction of the project can be expected to begin.
The number of phases in which the project will be built and the approximate date when construction of each phase can be expected to begin and completed.
A general description of the buildings and streetscapes including standards for height, building coverage, parking areas, and public improvements proposed for each phase of the development.
a. A Landscape plan per section 123-4 of the City Ordinance.
b. Proposed lot lines and other divisions of land for management, use or allocation purposes.
c. The heights of proposed buildings and structures.
d. The location and size of all areas proposed to be conveyed, dedicated, or reserved for streets, parks, playgrounds, public and semi-public buildings, and similar uses.
e. The existing and proposed vehicular circulation system, including off-street parking, and loading areas.
f. The pedestrian circulation system, including its interrelationships with the vehicular circulation system, within the development to adjacent streets, showing all curb cuts and sidewalks.
g. The proposed buffering treatment of the perimeter of the planned development, refuse stations, storage areas, or loading areas, including materials and techniques used such as screens, fences, and walls.
12. The property may not be subdivided into single-family lots unless the applicant obtains a subdivision plat approval in accordance with all applicable City Code requirements.
13. Prior to plat approval, developer shall obtain a sound study to determine if the noise within the property from the I-95 off-ramp exceeds FDOT Noise Abatement Criteria for residential properties (which is 66 db(A), as set forth in Figure 18-1 of Part 2, Chapter 18, Highway Traffic Noise, from the FDOT PD&E Manual) and shall deliver a copy of the study to the City. If the foregoing FDOT Noise Abatement Criteria is exceeded at the location of any proposed homes within the development, then the developer shall commit to implement noise reduction measures for such homes calculated to meet the HUD interior noise goal set forth in 24 CFR Subpart B, 51.101(a)(9) (i.e. not to exceed a day-night average sound level of 45 db(A)). Such noise reduction measures may include the measures set forth in the FDOT PD&E Manual, Part 2, Chapter 18, Figure 18-3 Building Noise Reduction Factors, and the City will accept FDOT’s calculations of noise reduction as set forth in Figure 18-3. Prior to plat approval, the City shall review the sound study and developer’s proposed noise reduction measures (if such measures are required), to confirm this condition has been satisfied.
Attached is FDOT PD&E Manual Chapter 18, Part 2, Highway Traffic Noise.
From Figure 18-1 Noise Abatement Criteria:

From Figure 18-3 Building Noise Reduction Factors:

Attached is HUD 24 CFR Part 51, Subpart B, Noise Abatement and Control.
From 24 CFR Subpart B, 51.101(a)(9), Interior Noise Goals:

14. The project site is party to an access easement (recorded at ORB 3093, PG 2587) in favor of the owner of the 1.51-acre parcel located 2627 S. Jenkins Road (Parcel ID 2324-800-0001-000-4), immediately adjacent to the north. At the time of Final Plat application submittal for any phase contemplated under the Final Development Plan, the applicant will provide staff with a copy of a recorded easement negotiated between the applicant and the adjacent property owner for their mutual benefit, preserving the adjacent owner’s right of access through the project site.
Conditions
- A Final PD shall be required prior to any development activities with the Master Site Plan by HJA Design Studio, Job No. 2024-31, 02.14.2025.
- The minimum Open Space shall be 20% of the Final PD site area.
- The maximum Density shall be 5 dwelling units per acre of the Final PD site area.
- The Final PD plan shall conform to the requirements of the City Code of Ordinances unless alternate standards are approved through the Planned Development Agreement.
- A Gopher Tortoise Survey shall be submitted within ninety (90) days of land clearing.
- After approval of the Final PD Site Plan, a detailed stormwater and drainage plan and statement shall be submitted at the time of Building Permit.
- The Final PD site plan shall be in unified control and property ownership. All land intended to be included in the planned development shall be under the legal control of the applicant.
- The Final PD site plan shall include a general description of the buildings and streetscapes including standards for height, building coverage, parking areas, and public improvements proposed for the development.
- Prior to approval of the Final PD site plan, the applicant shall submit a proposed declaration of covenants governing the use, maintenance, and continued protection of the common open space or other shared areas within the planned development. The declaration shall bind successors in title to any commitments concerning completion of the project, its maintenance, and operation.
- Phasing of this project will require the following at the time of Final PD:
The approximate date when construction of the project can be expected to begin.
The number of phases in which the project will be built and the approximate date when construction of each phase can be expected to begin and completed.
A general description of the buildings and streetscapes including standards for height, building coverage, parking areas, and public improvements proposed for each phase of the development.
- The Final PD site plan shall contain the following information, at minimum:
a. A Landscape plan per section 123-4 of the City Ordinance.
b. Proposed lot lines and other divisions of land for management, use or allocation purposes.
c. The heights of proposed buildings and structures.
d. The location and size of all areas proposed to be conveyed, dedicated, or reserved for streets, parks, playgrounds, public and semi-public buildings, and similar uses.
e. The existing and proposed vehicular circulation system, including off-street parking, and loading areas.
f. The pedestrian circulation system, including its interrelationships with the vehicular circulation system, within the development to adjacent streets, showing all curb cuts and sidewalks.
g. The proposed buffering treatment of the perimeter of the planned development, refuse stations, storage areas, or loading areas, including materials and techniques used such as screens, fences, and walls.
12. The property may not be subdivided into single-family lots unless the applicant obtains a subdivision plat approval in accordance with all applicable City Code requirements.
13. Prior to plat approval, developer shall obtain a sound study to determine if the noise within the property from the I-95 off-ramp exceeds FDOT Noise Abatement Criteria for residential properties (which is 66 db(A), as set forth in Figure 18-1 of Part 2, Chapter 18, Highway Traffic Noise, from the FDOT PD&E Manual) and shall deliver a copy of the study to the City. If the foregoing FDOT Noise Abatement Criteria is exceeded at the location of any proposed homes within the development, then the developer shall commit to implement noise reduction measures for such homes calculated to meet the HUD interior noise goal set forth in 24 CFR Subpart B, 51.101(a)(9) (i.e. not to exceed a day-night average sound level of 45 db(A)). Such noise reduction measures may include the measures set forth in the FDOT PD&E Manual, Part 2, Chapter 18, Figure 18-3 Building Noise Reduction Factors, and the City will accept FDOT’s calculations of noise reduction as set forth in Figure 18-3. Prior to plat approval, the City shall review the sound study and developer’s proposed noise reduction measures (if such measures are required), to confirm this condition has been satisfied.
Attached is FDOT PD&E Manual Chapter 18, Part 2, Highway Traffic Noise.
From Figure 18-1 Noise Abatement Criteria:
From Figure 18-3 Building Noise Reduction Factors:
Attached is HUD 24 CFR Part 51, Subpart B, Noise Abatement and Control.
From 24 CFR Subpart B, 51.101(a)(9), Interior Noise Goals:
14. The project site is party to an access easement (recorded at ORB 3093, PG 2587) in favor of the owner of the 1.51-acre parcel located 2627 S. Jenkins Road (Parcel ID 2324-800-0001-000-4), immediately adjacent to the north. At the time of Final Plat application submittal for any phase contemplated under the Final Development Plan, the applicant will provide staff with a copy of a recorded easement negotiated between the applicant and the adjacent property owner for their mutual benefit, preserving the adjacent owner’s right of access through the project site.
ALTERNATIVES:
1. Approval with alternative/additional conditions.
OR
2. Disapproval.
RESPONSIBLE STAFF:
Vennis Gilmore, Historic Preservation Officer/Senior Planner
COORDINATED WITH:
Technical Review Committee
Planning Board
City Attorney's Office
Planning Board
City Attorney's Office
Fiscal Impact
OTHER INFORMATION:
N/A
Attachments
- Staff Report
- Staff Presentation
- Ordinance 25-037
- Ordinance 25-037 Development Agreement
- Staff Report Supporting Documents
- Application Supporting Documents
- Response to Traffic Impact Analysis from TMC Consultants
- Final Phasing Plan Proposal
- HUD Noise Attenuation Guidelines
- FDOT Noise Attenuation Guidelines
- Public Notice Certification
- CA Memo 25-345
- Proof of Publication
Form Review
| Inbox | Reviewed By | Date |
|---|---|---|
| City Manager | Richard Chess | 12/02/2025 04:06 PM |
- Form Started By:
- Vennis Gilmore
- Started On:
- 11/26/2025 11:36 AM
- Final Approval Date:
- 12/02/2025