Skip to main content

AgendaQuick™

View Agenda Item

6.d.
Planning Board - 4:00 PM
Meeting Date:
08/11/2025
Re
Major Site Plan (ICD) - Sunrise Village Apartments - 3000 Okeechobee Rd.
Submitted For:
Kev Freeman

Information

SUBJECT:

PZSITE2025-00009
Major Site Plan and Innovative Community Development
Sunrise Village Apartments
3000 Okeechobee Road

SUMMARY:

The applicant is requesting the review and approval of a Major Site Plan (Innovative Community Development and bonus density) to develop 106 apartment units at 3000 Okeechobee Rd. The three (3) multi-level, multi-family buildings proposes to offer community amenities and resources, unique architectural designs, enhanced landscaping and transit-oriented design features.

The proposed development is located on a parcel with approximately 6.87 acres. The future land use of the parcel is Medium Density Residential, RM, and the zoning is Medium Density Residential, R-4.

RECOMMENDATION:

Staff's recommendation is for the Planning Board to move the proposed application type for approval to the City Commission with the following seven (7) conditions:

1. Prior to issuance of final certificate of occupancy, a Landscape Maintenance Agreement shall be approved and shall acknowledge the following:
               a.All approved landscaping shall be installed, irrigated, and maintained in perpetuity in accordance with section 123-7 of the City Code of Ordinances, in order that it continues to present a healthy, neat, and orderly appearance free of refuse and debris, in conformity with the     following requirements:
                   i.Vegetation required by this article shall be replaced with equivalent or better vegetation if it is not living.   All trees for which credit is awarded, and which subsequently die shall be replaced by the same or greater number of living trees according to the standards established in this article
                     ii.Maintenance shall include sufficient weeding, watering, fertilizing, pruning, mowing, edging, mulching and other horticultural practices to ensure that the landscaping continues to maintain a healthy, neat, and orderly appearance

2. A 5-foot sidewalk along S. 31st Street to provide site connectivity to the existing Okeechobee Road sidewalk

3. A 12.5 ft. right-of-way donation on S. 31st Street

4. Prior to the CO, a maintenance plan and agreement signed by the owner and/or operating entity shall be notarized and submitted to the City Engineer. The agreement shall include the operation and maintenance of all stormwater facilities and shall ensure the stormwater management system has a plan for the removal of nuisance and invasive exotics or other vegetation to ensure no re-growth of the same

5. Sign permits shall be filed separately during the permit process

6. An updated Environmental Assessment shall be required prior to land clearing and development

7. Prior to the issuance of any site clearing permits, the applicant shall provide a Tree Mitigation Survey and coordinate with the City of Fort Pierce Arborist for the required mitigation of the City's regulated trees proposed to be removed as a result of its site development/construction activity

ALTERNATIVES:

  1. Recommend approval with additional/modified conditions
  2. Recommend disapproval 

RESPONSIBLE STAFF:

Kerry C. Driver - Senior Planner

COORDINATED WITH:

  1. Technical Review Committee 

Fiscal Impact

OTHER INFORMATION:

N/A

Attachments

Form Review

Form Started By:
Kerry Driver
Started On:
07/30/2025 11:06 AM
Final Approval Date:
08/05/2025