6.R.
Special Magistrate Hearing - Building
- Meeting Date:
- 08/15/2024
- Re
- Case #24-986 - 1232 Easter Avenue
- Submitted For:
- Shaun Coss
Information
SUBJECT:
| 24-986 | 1232 Easter Ave | Titherington, James | Kevin Young |
CASE INFORMATION:
| Case Initiated: | April 24, 2024 | Type of Presentation: | Regular |
OWNER:
| OWNER: James Titherington 1232 Easter Ave Ft Pierce FL 34950 |
OCCUPIED BY: |
VIOLATIONS:
IPMC 111.1.3 (2021) Structure Unfit for Human Occupancy, IPMC 304.1 (2021) Exterior Structure – General, IPMC 304.1.1 (2021) Unsafe Conditions, IPMC 304.6 (2021) Exterior Walls, IPMC 304.10 (2021) Stairways, Decks, Porches and Balconies, IPMC 304.13.2 (2021) Openable Windows, IPMC 305.1.1 (2021) Unsafe Conditions, IPMC 309.1 (2021) Infestation, IPMC 502.1 (2021) Dwelling Units, IPMC 503..4 (2021) Floor Surface, IPMC 504.1 (2021) General, IPMC 504.3 (2021) Plumbing System Hazard, IPMC 506.2 (2021) Maintenance, IPMC 604.3.1.1 (2021) Electrical Equipment
CORRECTIVE ACTIONS:
1. Make necessary plumbing repairs to all plumbing that is not properly connected, improperly draining under the house, or are otherwise creating a plumbing hazard.
2. Make necessary electrical repairs to correct the electrical feed to the rear cottage.
3. Make necessary electrical repairs to the panel that is unsafe and the cause of of the circuit tripping.
4. Treat the property for all pest infestations including rats and termites.
5. Repair/replace the stucco that is cracked, missing, or falling off the structure.
6. Make necessary repairs to the rotten framing in the trusses, walls, and floors.
7. Repair/replace the windows that are broken or unopenable.
8. Repair the holes in the floors and interior walls.
9. Replace the missing ceiling drywall, and make repairs where the paint is chipping and peeling away.
10. Obtain a permit to rebuild or demolish the front entry deck that is dilapidated and unpermitted.
11. Obtain a permit for converting the main house into a duplex.
2. Make necessary electrical repairs to correct the electrical feed to the rear cottage.
3. Make necessary electrical repairs to the panel that is unsafe and the cause of of the circuit tripping.
4. Treat the property for all pest infestations including rats and termites.
5. Repair/replace the stucco that is cracked, missing, or falling off the structure.
6. Make necessary repairs to the rotten framing in the trusses, walls, and floors.
7. Repair/replace the windows that are broken or unopenable.
8. Repair the holes in the floors and interior walls.
9. Replace the missing ceiling drywall, and make repairs where the paint is chipping and peeling away.
10. Obtain a permit to rebuild or demolish the front entry deck that is dilapidated and unpermitted.
11. Obtain a permit for converting the main house into a duplex.
RECOMMENDATION:
The City requests that if the Special Magistrate finds the violation exists, the violator(s) be given 60 days to obtain a permit; obtain approval for all required inspections at least every 180 days until the permit has been closed; comply with all other permit conditions; and, cure all other violations described in the Order not requiring a permit or a fine of $100.00 per day be assessed.
Form Review
- Form Started By:
- Elizabeth Beck
- Started On:
- 08/07/2024 04:20 PM
- Final Approval Date:
- 08/08/2024