- PZSITE2026-00020, Major Site Plan with Conditional Use, 2535 S. Kings Highway
- Submitted For:
- Christopher Suneson
SUBJECT:
Quasi-Judicial Hearing - Review and approval of an application for Major Site Plan (Development and Design Review) with Conditional Use to allow Innovative Community Development by owner, Farrell Communities of Fort Pierce Owner LLC, represented by Haley Ward, Inc., to construct at 488-unit multifamily residential apartment community with associated site improvements and amenities on 40.77 acres located at 2535 S. Kings Highway, Fort Pierce, FL. The property is zoned R-4, Medium Density Residential. Parcel ID: 2323-501-0002-000-0.
SUMMARY:
The applicant has requested review and approval of an application for a Major Site Plan (Development and Design Review) with Conditional Use to allow Innovative Community Design by owner, Farrell Communities of Fort Pierce Owner LLC, represented by Haley Ward, Inc., to construct a 488-unit multifamily residential apartment community with associated site improvements and amenities on 40.77 acres located at 2535 S. Kings Highway. The property has a Future Land Use of RM, Medium Density Residential and is zoned R-4, Medium Density Residential.
The proposed development includes 15 multi-family, three-story apartment buildings each containing 32-34 dwelling units with a maximum of 488 dwelling units. The site is programmed with a variety of amenities and is centered around five large lakes with water features.
The applicant is requesting additional density considerations under Land Development Code Section 125-243, Innovative Community Design through a Conditional Use with would allow an increase in allowable density up to the limit provided under the site’s Future Land Use category.
The proposed development includes 15 multi-family, three-story apartment buildings each containing 32-34 dwelling units with a maximum of 488 dwelling units. The site is programmed with a variety of amenities and is centered around five large lakes with water features.
The applicant is requesting additional density considerations under Land Development Code Section 125-243, Innovative Community Design through a Conditional Use with would allow an increase in allowable density up to the limit provided under the site’s Future Land Use category.
RECOMMENDATION:
Staff recommends the City Commission APPROVE the proposed Major Site Plan with Conditional Use:
- The following documents form the basis of the City Commission’s approval for this project:
a. Project Narrative by Haley Ward dated August 10, 2026;
b. Concurrency Capacity Analysis received August 11, 2026;
c. Environmental Assessment completed by Haley Ward dated May 26, 2026;
d. Traffic Analysis Report completed by MacKenzie Engineering and Planning revised September 2026;
e. ALTA/ACSM Land Title Survey by Caulfield and Wheeler signed and sealed September 3, 2026;
f. Site Plan package by Haley Ward dated September 18, 2026;
g. Floor Plan package by Dragonfly Architecture dated July 20, 2026;
h. Preliminary Engineering plan by Haley Ward dated May 27, 2026;
i. Photometric Plan by Precision Technical dated May 27, 2026;
j. Tree Survey by Haley Ward dated May 15, 2026;
k. Tree Mitigation package by Haley Ward dated August 10, 2026;
l. Landscape Plan package by Haley Ward signed and sealed September 17, 2026;
m. Design Review Narrative by Haley Ward dated June 4, 2026;
n. Building Elevations by Dragonfly Architecture dated July 20, 2026;
o. Color Board by Dragonfly Architecture dated July 20, 2026;
p. Sign Rendering received August 11, 20206.
Minor changes to these documents will be evaluated, if necessary, under further permitting through Development Plan Compliance Review.
- A Tree Removal permit is required prior to the issuance of a Land Clearing permit.
- A Land Clearing permit is required prior to the issuance of a Land Development permit.
- A gopher tortoise survey dated within 90 days of land clearing activity must be submitted and reviewed prior to the issuance of Land Clearing permit through Development Plan Compliance Review.
- Stormwater design has only been reviewed conceptually. A full review is required through Development Plan Compliance Review.
- A Saint Lucie County site development permit for access and drainage outfall will be required at time of Development Permit Compliance Review.
- All required State and Federal agency permits shall be required at time of Development Permit Compliance Review.
- All signs shall be permitted separately under building permits.
- Roadway improvements required by external agencies will be undertaken and completed prior to the first residential Certificate of Occupancy.
- Prior to the issuance of a final Certificate of Occupancy, a Landscape Maintenance Agreement must be signed, notarized and submitted to the Planning Department.
- Issuance of a development permit or development order by a municipality does not create any right on the part of an applicant to obtain a permit from a state or federal agency and does not create any liability on the part of the municipality for issuance of the permit if the applicant fails to obtain requisite approvals or fulfill the obligations imposed by a state or federal agency or undertakes actions that result in a violation of state or federal law. A municipality shall attach such a disclaimer to the issuance of development permits and shall include a permit condition that all other applicable state or federal permits be obtained before commencement of the development.
ALTERNATIVES:
- Approve with alternate conditions.
- Denial.
RESPONSIBLE STAFF:
Chris Suneson, Assistant Planning Director
COORDINATED WITH:
Technical Review Committee
Planning Board
Planning Board
Fiscal Impact
- Budgeted Y/N:
- N
- Fiscal Year:
- N/A
- Account:
- N/A
- Amount:
- N/A
OTHER INFORMATION:
This project will not impact the City's budget.
Attachments
- Presentation
- Staff Report
- Location Map
- Property Card
- Deed
- Agent Authorization
- Project Narrative
- Neighborhood Photos
- Site Photos
- Concurrency Analysis
- Environmental Analysis
- Traffic Impact Analysis
- Survey
- Site Plan
- Floor Plans
- Conceptual Drainage Plan
- Lighting Plan
- Tree Survey
- Tree Mitigation Plan
- Landscape Plan
- Design Review Narrative
- Elevations
- Color Board
- Renderings
- Sign Rendering
- Public Notice Certification
- Mailing Labels
- Proof of Publication
- Proof of Publication
- Applicant Presentation
- Community Comment