AI - 44665
3.
DRAINAGE - CONSENT
- Meeting Date:
- 05/27/2014
- Submitted By:
- Claudette Guerrero, DRAINAGE DISTRICT
- Department:
- DRAINAGE DISTRICT
Information
CAPTION
2013 Bond Series:
Invoice No. 5239 in the amount of $3,843.29 for Guzman & Munoz Engineering and Surveying, Inc. related to Work Authorization No. 5-Basic Engineering Services for the West Main Drain Control Weir Structure near McColl Road between Chapin Road and Schunior Road from Agreement for Professional Engineering Services for the expansion of an existing weir structure located within the West Main Drain and the addition of a 10' x 10' concrete box outfall from the Edinburg Stub Drain into the South Main Drain, BOD 7-9-13.
Invoice No. 5239 in the amount of $3,843.29 for Guzman & Munoz Engineering and Surveying, Inc. related to Work Authorization No. 5-Basic Engineering Services for the West Main Drain Control Weir Structure near McColl Road between Chapin Road and Schunior Road from Agreement for Professional Engineering Services for the expansion of an existing weir structure located within the West Main Drain and the addition of a 10' x 10' concrete box outfall from the Edinburg Stub Drain into the South Main Drain, BOD 7-9-13.
BACKGROUND
Fiscal Impact
Attachments
Form Review
| Inbox | Reviewed By | Date |
|---|---|---|
| Budget and Management | Debbie Tamez | 05/22/2014 04:56 PM |
| Final Approval | Monica Salinas | 05/23/2014 02:52 PM |
- Form Started By:
- ccavazos
- Started On:
- 05/22/2014 02:05 PM
- Final Approval Date:
- 05/23/2014