CAPTION

Right of Way: Sharyland Water Supply Corp. * Road Crossing (BORE): A 1" PVC waterline to be encased within a 2" PVC casing to be located approximately 679 ft. south of the intersection of Trosper Rd. and Mile 6 Rd. * Road Crossing (BORE): A 1" PVC waterline to be encased within a 2" PVC casing to be located approximately 764 ft. south of the intersection of La Homa Rd. and Joshua Ave.