Information

CAPTION

Approval of Right of Way Permit:
1).  Melden & Hunt, Inc. - Contractor to connect to an existing 6" water line located along the south side of Cactus Lane approximately 805.0 feet west of Seminary Road.  The proposed 8" water line shall be connected to the 6" water line with a 6" x 8" reducer and run west approximately 990.00 feet ending with a 2" flush valve.