Information

CAPTION

Approval of Right of Way Permits: Agua Special Utility District:
1.  30 in. sewer line (B1-a) is to be constructed within Hidalgo County ROW from the east ROW line of TxDOT of Abram Rd
(FM 1427) to the west ROW line Hidalgo County Irrigation District on the north of Ojo de Agua Subdivision.  The stations are from 1+16.67 to 10+06, a total length of 890 LF.
2.  36 in. sewer line (E2 & E2-f) is to be constructed within Hidalgo County ROW on Greene Rd. from 7 ft. north of north property line of lot 1 from Los Trevinos Subdivision to 22 ft. north of north property line of lot A of E.M. Goodwin Subdivision with exception of TxDOT ROW on Old U.S. 83 and Union Pacific Railroad ROW.  The stations are 5 ft. south of 29+55 to 5 ft. north of 51+05, a total length of 1980 LF. sewer line will cross Greene Rd., be placed through the edge of the road and there will be some residential connections.
3.  36 in. sewer line (E2) is to be constructed within Hidalgo County ROW on 1st St. from 31 ft. west of lot 2 and 5 property line from Los Trevinos Subdivision to the west ROW line of Greene Rd.  The stations are from 45 ft. west from station 22+56 to 29+57, a total length of 746 LF.  The sewer line will be placed through the edge of the street and there will be some residential connection. 
4.  36 in. sewer line (E2) is to be constructed within Hidalgo County ROW on Mike Barrera St. from between east ROW of Bates Rd. to the end of the cul de sac of the same street.  The stations are from 0+08 to 11+35. a total length of 1127 LF.  The sewer line will cross Mike Barrera St., be going along the ROW and there will be some residential connection. 
5.  36 in. sewer line (E1) is to be constructed within Hidalgo County ROW on Bates Rd. from between lots 1 and 3 to 74 feet south from the north boundary line of lot 9 south of Mike Barrera St.  The stations are from 8+69 to 28+68, a total of length of 1999 LF.  The sewer line will cross Bates Rd. once, be going along the ROW and there will be some residential connection.

BACKGROUND


Fiscal Impact

Attachments

Form Review

Inbox Reviewed By Date
Budget and Management Veronica Ortiz 09/26/2016 09:31 AM
Final Approval Monica Salinas 09/30/2016 05:24 PM
Form Started By:
Rebecca Gomez
Started On:
09/23/2016 10:57 AM
Final Approval Date:
09/30/2016