CAPTION

Utility Permit
Sharyland Water Supply Corp. propose to install 90 LF of 19" Steel Casing with 12" Waterline anchored to 90 LF of 4" I-Beam Crossing south to north and existing 250 foot HCDD1 Ditch ROW (J-08) located on the south side of lot 11, Section 238 Texas Mexican Railway Company Survey.