CAPTION
Utility Permit
H&S Constructors and Texas Gas Service propose to install a 6" steel line within TXDot ROW crossing on the south side of HCDD1's South Lateral Drain along Las Milpas Rd. between Alamo Rd. and Tower Rd.
H&S Constructors and Texas Gas Service propose to install a 6" steel line within TXDot ROW crossing on the south side of HCDD1's South Lateral Drain along Las Milpas Rd. between Alamo Rd. and Tower Rd.
BACKGROUND
Fiscal Impact
Attachments