Skip to main content

AgendaQuick™

View Agenda Item

AI- 67010
Planning Department   7.A.
CC - REGULAR
Meeting Date:
10/09/2018
Submitted For:
Flor Castillo
Submitted By:
Flor Castillo, PLANNING DEPT.
Department:
PLANNING DEPT.

Information

CAPTION

1. Preliminary Approval
a. Rosalinda Rosalez Subdivision- Pct. 1 (Rosalinda Rosalez) (Anderson Road & Dillon Street)
No. of Lots: 1 Single Family
Flood Zone: C
Drainage: Yes, Drainage will be provided by natural perculation within the proposed lots and surface runoff will be drain into Anderson Road side ditch.
ETJ: Yes, City of Donna.
Water: Yes, provided by North Alamo Water Supply Corporation
Sewer: Yes, OSSF
Paved: Yes, Anderson Road paved.

b. Soledad Gardens Subdivision- Pct. 1 (Blue Cactus Properties, LLC) (Mile 2 West Road & Mile 17 North Road)
No. of Lots: 4 Single Family
Flood Zone: X
Drainage: Yes, Drainage will be provided by natural perculation with in the proposed lots and surface runoff will be drain into Mile 2 West Road side ditch.
ETJ: Yes, City of Edcouch.
Water: Yes, provided by North Alamo Water Supply Corporation
Sewer: Yes, OSSF
Paved: Yes, Mile 2 West Road paved.

c. Isabella Subdivision- Pct. 3 (Gabriel Aguilar) (Brushline Road & Mile 5 North Road)
No. of Lots: 1 Single Family, 3 Commercial
Flood Zone: X
Drainage: Yes, Drainage will be provided by natural perculation within the proposed lots and surface runoff will be drain into Mile 5 North Road and Brushline Road side ditches.
ETJ: Yes, City of Mission.
Water: Yes, provided by Agua SUD
Sewer: Yes, OSSF
Paved: Yes, Brushline Road and Mile 5 North Road paved.

d. Krishnan Subdivision- Pct. 1 (S. Gopal Krishnan) (Victoria Road & Lott Road)
No. of Lots: 2 Single Family
Flood Zone: B
Drainage: Yes, Drainage will be provided by natural perculation within the proposed lots and surface runoff will be drain into Victoria Road side ditch.
ETJ: Yes, City of Donna.
Water: Yes, North Alamo Water Supply Corporation
Sewer: Yes, OSSF
Paved: Yes, Victoria Road paved.

e. R & E Ranch Subdivision- Pct. 1 (Yoanna Maldonado) (Milanos Road & 18th Street)
No. of Lots: 6 Single Family
Flood Zone: B
Drainage: Yes, Drainage will be provided by natural perculation within the proposed lots and surface runoff will be drain into Milanos Street and 18th Street road side ditch.
ETJ: Yes, City of Weslaco.
Water: Yes, provided by Military Highway Water Supply Corporation
Sewer: Yes, OSSF
Paved: Yes, Milanos Road & 18th Street paved

f. Eduardos Subdivision No. 18- Pct. 3 (Izaguirre Real Estates Holdings LLC.) (Trosper Road & Mile 6 North Road)
No. of Lots: 76 Single Family
Flood Zone: X
 Drainage: Yes, Drainage will be provided by storm drainage pipe system and detention will be provided by widening the existing drain ditch .
ETJ: Yes, City of Mission.
Water: Yes, provided by Sharyland Water Supply Corporation
Sewer: Yes, Sanitary Sewer provided by City of Mission.
Paved: Yes, Trosper Road paved and 4 internal streets to be paved.

2. Final Approval with Financial Guarantee
a. Maravillas Estates Phase 3 Subdivision- Pct. 1 (Elias Woloski) (Midway Road & Ponciano Drive)
No. of Lots: 77 Single Family
Flood Zone: B
Drainage: Yes, Drainage will be provided by connecting into an existing Drainage System which was previously installed during Maravillas Estates Phase 1 Subdivision.
ETJ: Yes, City of Donna.
Water: Yes, provided by North Alamo Water Supply Corporation
Sewer: Yes, OSSF has been escrowed.
Paved: Yes, Midway Road, Ponciano Drive and 3 internal streets have been paved.
*Final Approval with Cash Deposit in the amount of $115,500.00 for 77 OSSF. 

3. Discussion and possible action to adopt amendments and/or additions to the following sections of the Hidalgo County Subdivision Rules:
a. Title A, Title B and Title M Chapter 2 General Subdivision Design- (Streetlights, Filling Stations,
Bus Stops, Cul-De-Sac Lengths and Relocation of Utility Facilities)
b. Appendix 5: County Construction Specifications- (Drainage )
c. Appendix 9: County Details and Specification- (Paving Specifications)

BACKGROUND


Fiscal Impact

Attachments

Form Review

Inbox Reviewed By Date
Budget and Management Veronica Ortiz 10/04/2018 09:24 AM
Final Approval Monica Salinas 10/05/2018 06:13 PM
Form Started By:
Flor Castillo
Started On:
10/03/2018 04:20 PM
Final Approval Date:
10/05/2018