Information

CAPTION

1. PIPELINE AND UTILITY PERMITS
a.  Applicant: North Alamo Water Supply Corporation
 Legal Description: Lot 29 Block 1 South San Carlos Subdivision (Pct. 4) (83 ½ Street and Hendrix Ave.)
 Location of Pipeline or Utilities: Existing 2” water line west of 83 1/2 Street.
 Proposed improvement within Right-of-Way: One 3/4” water service line with a 2” PVC casing boring 83 ½ Street.

b. Applicant: North Alamo Water Supply Corporation
 Legal Description: Buckeye Estates Subdivision Lot 1(Pct. 4) (Cesar Chavez Road and Davis Road)
 Location of Pipeline or Utilities: Existing 8” water line west of Cesar Chavez Road.
 Proposed improvement within Right-of-Way: One 3/4” water service line with a 2” PVC casing boring Cesar Chavez Road.
 
c. Applicant: North Alamo Water Supply Corporation
 Legal Description: The east 10.00 acres of Blk. 106 Hill Halbert Tract Subdivision (Pct. 1) (Dillon Road and Roosevelt Road)
 Location of Pipeline or Utilities: Existing 4” water line east of Dillon Road.
 Proposed improvement within Right-of-Way: One 3/4” water service line with a 2” PVC casing boring Dilllon Road.
  
d. Applicant: North Alamo Water Supply Corporation
 Legal Description: 1.08 acres out of Lot 1, 7 and 8 Blk. 78 Portion of Lot 4 Blk. 79 Missouri Texas Land & Irrigation Co. (Pct. 4)
(F.M. 88 and Mile 21 North Road)
 Location of Pipeline or Utilities: Existing 4” water line south of  Mile 21 North Road.
 Proposed improvement within Right-of-Way: One 4” water line extension of approximately 2,260’ along the south side of Mile 21 North Road.
 
e. Applicant: North Alamo Water Supply Corporation
 Legal Description: 43.72 acres out of Block 143 La Blanca Ag. Co. Subdivision B (Pct. 1) (F.M. 493 and Mile 15 North Road)
 Location of Pipeline or Utilities: Existing 12” water line west of  F.M. 493.
 Proposed improvement within Right-of-Way: One 8” water line extension of approximately 400’ west along the south side of Mile 15 North Road.
 
f. Applicant: Spectrum (Bernie Robinson Project No. WES1-1891471)
 Proposed location of Power Supply Pole:  West of 83rd Street approximately 200.00 feet north of Curve Road. (Pct. 4)
 
 g. Applicant: Spectrum (Bernie Robinson Project No. EMD1-1818995)
 Proposed location of Power Supply Pole:  East of Rio Grande Care Road approximately 1 ½ mile north of Monte Cristo Road. (Pct. 4)
 
h. Applicant: Spectrum (Bernie Robinson Project No. EMD2-1818995)
 Proposed location of Power Supply Pole:  East of Rio Grande Care Road approximately ½ mile north of Monte Cristo Road. (Pct. 4)
 
i. Applicant: Fiberlight (Segment # CC01426A)
 Proposed location of Fiber Optic Cable:  (2) 1 ¼”  HDPE SDR-11 Conduits line extension of approximately 2,143’ south of 28th Street along the west side of Bridge Ave.
 
 j. Applicant: Fiberlight (Segment Name: McAllen Diverse BB Part 3)
 Proposed location of Fiber Optic Cable:  (2) 1 ¼”  HDPE SDR-11 Conduits line extension of approximately 1,300’ south of SH 107 along the east side of Taylor Road.
 
k. Applicant: Texas Gas Service (Line 184-1 6” Relocation on Las Milpas Road)
 Proposed improvement within Right-of-Way: One 6” coated steel pipe boring “I” Road and Two 6” coated steel pipe boring Las Milpas Road.

BACKGROUND


Fiscal Impact

Attachments

Form Review

Inbox Reviewed By Date
Budget and Management Veronica Ortiz 06/17/2020 05:04 PM
Final Approval Monica Salinas 06/19/2020 06:29 PM
Form Started By:
Flor Castillo
Started On:
06/17/2020 03:50 PM
Final Approval Date:
06/19/2020