Skip to main content

AgendaQuick™

View Agenda Item

AI- 78754
Planning Department   14.A.
CC REGULAR AGENDA SPECIAL MTG
Meeting Date:
12/22/2020
Submitted For:
Flor Castillo
Submitted By:
Flor Castillo, PLANNING DEPT.
Department:
PLANNING DEPT.

Information

CAPTION

1. Preliminary Approval
a. J. Leal Subdivision- Pct. 3 (Jesus Eliu Leal De Leon) (Trosper Road & Mile 7 North Road)
 No. of Lots: 1 Commercial
 Flood Zone: X
 Estimated Number of Streetlights:N/A
 Filling Stations:1
 Drainage: Yes, Drainage will be provided by onsite detention which will connect to an existing TxDot storm system at building permit stage.
 ETJ: Yes, approved by the City of McAllen.
 Water: Yes, provided by Sharyland Water Supply Corporation.
 Sewer: Yes, OSSF
 Paved: Yes, Mile 7 North Road and Trosper Road are paved.
 
b. Emily Villarreal Subdivision – Pct. 1 (Martin Villarreal) (Midway Road & Mile 5 North Road)
 No. of Lots: 3 Single Family
 Flood Zone: B
 Estimated Number of Streetlights:N/A
 Filling Stations:N/A
 Drainage: Yes, Drainage will be provided by natural perculation and surface runoff will drain into Mile 5 North Road side ditch.
 ETJ: Yes, approved by the City of Weslaco.
 Water: Yes, provided by City of Weslaco.
 Sewer: Yes, OSSF’s
 Paved: Yes, Mile 5 North Road and Midway Road are paved.
 
c. Owassa Springs Subdivision- Pct. 2 (The Three Rupperts, LLC.) (Owassa Road & Cesar Chavez Road)
 No. of Lots: 15 Single Family
 Flood Zone:B
 Estimated Number of Streetlights: 5
 Filling Stations: 2
 Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by widening the existing drain ditch.
 ETJ: No, Rural Area
 Water: Yes, provided by North Alamo Water Supply Corporation
 Sewer: Yes, OSSF’s
 Paved: Yes, Owassa Road is paved and 1 internal street to be paved.
 
d. Western Oaks Subdivision- Pct. 3 (Rigoberto Villarreal) (Western Road & Mile 6 North Road)
 No. of Lots: 42 Single Family
 Flood Zone:X
 Estimated Number of Streetlights: 18
 Filling Stations: 9
 Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by regional detention areas dedicated to HCDD#1.
 ETJ: Yes, approved by the City of Mission.
 Water: Yes, provided by Agua SUD.
 Sewer: Yes, OSSF’s
 Paved: Yes, Western Road is paved.North Abram Road and 2 internal streets to be paved.
 
e. Blanquita Estates No. 2 Subdivision- Pct. 1 (La Cuesta Sol Development, LTD.) (Canton Road & F.M. 493)
 No. of Lots: 42 Single Family
 Flood Zone:C
 Estimated Number of Streetlights: 10
 Filling Stations: 4
 Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by widening the existing drain ditch.
 ETJ: Yes, approved by the City of Donna.
 Water: Yes, provided by North Alamo Water Supply Corporation
 Sewer: Yes, OSSF’s
 Paved: Yes, Canton Road is paved and 3 internal streets to be paved.
 
f. El Pinto Estates Phase II Subdivision- Pct. 3 (Garvic Properties, LP) (El Pinto Road & Mesquite Lane)
 No. of Lots: 47 Single Family
 Flood Zone:C
 Estimated Number of Streetlights: 9
 Filling Stations: 6
 Drainage: Yes, Drainage will be provided by onsite detention areas along the rear of the lots.
 ETJ: No, Rural Area.
 Water: Yes, provided by Agua SUD
 Sewer: Yes, OSSF’s for lots 60-69 & sanitary sewer for the remaining lots.
 Paved: Yes, El Pinto Road is paved and 1 internal street to be paved.
 
g. Encenada Estates Subdivision- Pct. 4 (Roman Vera Jr.) (Terry Road & Mile 17 North Road)
 No. of Lots: 72 Single Family
 Flood Zone:X
 Estimated Number of Streetlights: 11
 Filling Stations: 7
 Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by widening the existing drain ditch.
 ETJ: Yes, approved by the City of Edinburg.
 Water: Yes, provided by North Alamo Water Supply Corporation
 Sewer: Yes, Sanitary Sewer provided by North Alamo Water Supply Corporation
 Paved: Yes, Terry Road is paved and 5 internal streets to be paved.
 
h. Rio Rico Ranchettes No. 2 Subdivision- Pct. 1 (BPB Financial Services, LP) (Mile 4 North Road & Mile 1 1/2 East Road)
 No. of Lots: 79 Single Family
 Flood Zone:C
 Estimated Number of Streetlights: 11
 Filling Stations: 9
 Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by proposed drain ditch.
 ETJ: No, Rural area.
 Water: Yes, provided by Military Highway Water Supply Corporation
 Sewer: Yes, OSSF’S
 Paved: Yes, Mile 4 North Road is paved.Mile 1 ½ East Road and 2 internal streets to be paved.
 
i. Cantera Hermosa Phase I Subdivision- Pct. 1 (J.H. McKeever) (Eldora Road & Tower Road)
 No. of Lots: 84 Single Family
 Flood Zone:C
 Estimated Number of Streetlights: 15
 Filling Stations: 6
 Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by proposed drain ditch.
 ETJ: Yes, approved by the City of Alamo.
 Water: Yes, provided by North Alamo Water Supply Corporation
 Sewer: Yes, Sanitary Sewer provided by North Alamo Water Supply Corporation
 Paved: Yes, Eldora Road is paved and 4 internal streets to be paved.
 
2. Final Approval with Financial Guarantee
a. The Estates at Paloma Park Subdivision- Pct. 4 (Lionel W. Gegenheimer III) (Alberta Road & Raul Longoria Road)
 No. of Lots: 8 Single Family
 Flood Zone:B
 Streetlights: 5
 Filling Stations: 3
 Drainage: Yes, Drainage will be provided by natural perculation within the proposed lots and surface runoff will drain into Alberta Road side ditch.
 ETJ: Yes, approved by the City of Edinburg.
 Water: Yes, provided by North Alamo Water Supply Corporation
 Sewer: Yes, OSSF’s have been escrowed.
 Paved: Yes, Alberta Road is paved.
 *Final Approval with a cash deposit in the amount of $12,000.00 for (8) OSSF’s

b. Highland Manor Subdivision- Pct. 1 (Criselda Hinojosa) (Mile 11 North Road & Mile 5 ½ West Road)
 No. of Lots: 11 Single Family
 Flood Zone:X
 Streetlights: N/A
 Filling Stations: 3
 Drainage: Yes, Drainage will be provided by natural perculation and surface runoff will drain into Mile 11 North Road side ditch.
 ETJ: Yes, approved by the City of Weslaco.
 Water: Yes, provided by North Alamo Water Supply Corporation
 Sewer: Yes, OSSF’s have been escrowed.
 Paved: Yes, Mile 11 North Road is paved and Mile 5 ½ West Road to be paved.
 *Final Approval with a cash deposit in the amount of $16,500.00 for (11) OSSF’s

c. Sedona Estates Subdivision- Pct. 1 (Cayetano Development) (Sioux Road & Tower Road)
 No. of Lots: 135 Single Family
 Flood Zone:B
 Streetlights: 21
 Filling Stations: 14
 Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by widening the existing drain ditch.
 ETJ: Yes, approved by the City of Alamo.
 Water: Yes, provided by North Alamo Water Supply Corporation
 Sewer: Yes, Sanitary Sewer provided by North Alamo Water Supply Corporation.
 Paved: Yes, Sioux Road is paved and 5 internal streets to be paved.
 *Final Approval with a cash deposit in the amount of $343,286.30 for Paving & Drainage Imps.

d. Bon Viejo Phase 5 Subdivision – Pct. 1 (Kyndel W. Bennett) (Mile 13 ½ North Road & F.M. 493)
 No. of Lots: 42 Single Family
 Flood Zone:C
 Streetlights: 9
 Filling Stations: 4
 Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by widening the existing drain ditch.
 ETJ: Yes, approved by the City of Donna.
 Water: Yes, provided by North Alamo Water Supply Corporation.
 Sewer: Yes, OSSF’s have been installed.
 Paved: Yes, Mile 13 ½ North Road and 3 internal streets are paved.
 *Final Approval with a cash deposit in the amount of $12,500.00 for Drain ditch & Lot grading.

3. Final Approval
a. AAA Subdivision – Pct. 3 (Angel De La Cerda) (Doffing Road & Mile 5 North Road)
 No. of Lots: 1 Multi- Family
 Flood Zone:X
 Streetlights: N/A
 Filling Stations: 1
 Drainage: Yes, Drainage will be provided by onsite detention and discharging onto Doffing Road side ditch.
 ETJ: Yes, approved by the City of Mission.
 Water: Yes, provided by Agua SUD.
 Sewer: Yes, OSSF’s have been installed.
 Paved: Yes, El Coyote Circle and Doffing Road are paved.
 
b. Rancho El Viejito Subdivision – Pct. 1 (Lucila Martinez De Cantu) (Anderson Road & Dillon Road)
 No. of Lots: 3 Single Family
 Flood Zone:C
 Streetlights: N/A
 Filling Stations: N/A
 Drainage: Yes, Drainage will be provided by natural perculation and surface runoff will drain onto Anderson Road side ditch.
 ETJ: Yes, approved by the City of Donna.
 Water: Yes, provided by North Alamo Water Supply Corporation.
 Sewer: Yes, OSSF’s have been installed.
 Paved: Yes, Anderson Road is paved.
 
c. T & O Ranch Subdivision – Pct. 3 (T & O Ranch Investments, LLC.) (Mesquite Lane & El Pinto Road)
 No. of Lots: 7 Single Family
 Flood Zone:C
 Streetlights: N/A
 Filling Stations: 1
 Drainage: Yes, Drainage will be provided by natural perculation and surface runoff will drain into Mesquite Lane Road side ditch.
 ETJ: No, Rural area.
 Water: Yes, provided by Agua SUD.
 Sewer: Yes, Sanitary Sewer provided by Agua SUD.
 Paved: Yes, Mesquite Lane is paved.

BACKGROUND


Fiscal Impact

Attachments

Form Review

Inbox Reviewed By Date
Budget and Management Veronica Ortiz 12/14/2020 03:36 PM
Final Approval Monica Salinas 12/18/2020 06:04 PM
Form Started By:
Flor Castillo
Started On:
12/14/2020 02:18 PM
Final Approval Date:
12/18/2020