AI- 82026
Planning Department 5.D.
CC CONSENT AGENDA REGULAR MTG
- Meeting Date:
- 08/24/2021
- Submitted For:
- Flor Castillo
- Submitted By:
- Flor Castillo, PLANNING DEPT.
- Department:
- PLANNING DEPT.
CAPTION
1. PIPELINE AND UTILITY PERMITS
a. Applicant: North Alamo Water Supply Corporation
Legal Description: 11.207 acres out of Lot 2 Blk. 16 La Donna Subdivision (Soderquist Road & Lott Road) (Pct. 1)
Location of Pipeline or Utilities: Existing 4” waterline east of Soderquist Road.
Proposed improvement within Right-of-Way: One 4” water line extension running south approximately 130.00 feet along the east side of Soderquist Road.
b. Applicant: North Alamo Water Supply Corporation
Legal Description: 25.331 acres out of Lot 9 Blk. 53 Alamo Land & Sugar Co. Subdivision (Proposed Las Olas Estates Subdivision (Alberta Road & Dandelion Street) (Pct. 4)
Location of Pipeline or Utilities: Existing 8” waterline north of Alberta Road.
Proposed improvement within Right-of-Way: Two 8” PVC water lines with a 16” steel casing boring Alberta Road.
c. Applicant: North Alamo Water Supply Corporation
Legal Description: 10.00 acres out of Lot 6 Blk. 93 MTL&I Subdivision (Uresti Street & Mile 19 North Road) (Pct. 4)
Location of Pipeline or Utilities: Existing 6” waterline east of Uresti Street.
Proposed improvement within Right-of-Way: One 3/4” water service line with a 2” PVC casing boring Uresti Street.
d. Applicant: North Alamo Water Supply Corporation
Legal Description: 4.17 acres out of Farm Tract 271 West Tract Subdivision (Mile 11 North Road & Mile 3 ½ West Road) (Pct. 1)
Location of Pipeline or Utilities: Existing 6” waterline south of Mile 11 North Road.
Proposed improvement within Right-of-Way: One 3/4” water service line with a 2” PVC casing boring Mile 11 North Road.
e.Applicant: North Alamo Water Supply Corporation
Legal Description: 5.00 acres out of Tract 10 Blk. 187 West Tract Subdivision (Mile 17 North Road & Mile 6 West Road) (Pct. 1)
Location of Pipeline or Utilities: Existing 4” waterline north of Mile 17 North Road.
Proposed improvement within Right-of-Way: One 3/4” water service line with a 2” PVC casing boring Mile 17 North Road.
f. Applicant: North Alamo Water Supply Corporation
Legal Description: 20.00 acres out of Lot 12 Blk. 45 Alamo Land & Sugar Subdivision; Proposed Cantera Hermosa Phase I Subdivision (Tower Road & Eldora Road) (Pct. 1)
Location of Pipeline or Utilities: Existing sanitary sewer manhole located along the southeast corner of Sedona Estates Subdivision along the north side of Sioux Road. Existing 8” waterline located along the southwest corner of Tower Road & Eldora Road.
Proposed improvement within Right-of-Way: One 8” force main sewer line will be extended along the north side of Sioux Road, west of Tower Road and north of Eldora Road crossing with a 16” PVC casing boring Tower Road along the north side of Eldora Road ending at a proposed lift station. One 8” PVC waterline line extension running east along the south side of Eldora Road with a 16” steel casing boring Tower Road. One 8” PVC waterline crossing with a 16” PVC casing boring Eldora Road.
g. Applicant: Agua Special Utility District
Legal Description: Lot 107 La Homa Road North Subdivision (Graham Avenue & La Homa Road) (Pct.3)
Location of Pipeline or Utilities: Existing 4” waterline north of Graham Avenue.
Proposed improvement within Right-of-Way: One 1” water service line with a 2” PVC casing boring Graham Avenue.
h. Applicant: Agua Special Utility District
Location of Pipeline or Utilities: Existing 8” waterline west of Brushline Road (Pct. 3).
Proposed improvement within Right-of-Way: Two 8” PVC water lines with a 16” PVC casing boring
Brushline Road.Three 1” HDPE water service lines with a 2” PVC casing boring Brushline Road.
i. Applicant: Fiberlight LLC. (Segment #CC023285)
Proposed location of Fiber Optic Cable:Starting at the northwest corner of Texas Road & Mile 12 North Road (1) 1 ¼” HDPE SDR-11 Conduits will be extended west approximately 300 feet along the north side of Mile 12 North Road. (Pct. 1)
j. Applicant: Spectrum (Project No. 1724542)
Proposed location of Power Supply Pole: West of Mile 2 ½ East Road approximately 140.00 feet north of Ramiro Cavazos Road.
(Pct. 1)
k. Applicant: Spectrum (Project No. 1921675)
Proposed location of Power Supply Pole: East of Minnesota Road approximately ½ mile north of Mile 7 North Road. (Pct. 3)
l. Applicant: Spectrum (Project No. 2909076)
Proposed location of Power Supply Pole: North of Trenton Road approximately 30.00 feet east of Carl Street. (Pct. 4)
m. Applicant: Spectrum (Project No. 1807788 SM116)
Proposed location of Power Supply Pole: North of Mile 7 ½ North Road approximately 500.00 feet east of Stewart Road. (Pct. 3)
n. Applicant: Spectrum (Project No. 1807788 SM117)
Proposed location of Power Supply Pole: Northwest corner of Glasscock Road & Mile 7 ½ North Road. (Pct. 3)
o. Applicant: Spectrum (Project No. 1921675 SM133)
Proposed location of Power Supply Pole: East of Minnesota Road approximately 200.00 feet south of Gavilan Lane. (Pct. 3)
a. Applicant: North Alamo Water Supply Corporation
Legal Description: 11.207 acres out of Lot 2 Blk. 16 La Donna Subdivision (Soderquist Road & Lott Road) (Pct. 1)
Location of Pipeline or Utilities: Existing 4” waterline east of Soderquist Road.
Proposed improvement within Right-of-Way: One 4” water line extension running south approximately 130.00 feet along the east side of Soderquist Road.
b. Applicant: North Alamo Water Supply Corporation
Legal Description: 25.331 acres out of Lot 9 Blk. 53 Alamo Land & Sugar Co. Subdivision (Proposed Las Olas Estates Subdivision (Alberta Road & Dandelion Street) (Pct. 4)
Location of Pipeline or Utilities: Existing 8” waterline north of Alberta Road.
Proposed improvement within Right-of-Way: Two 8” PVC water lines with a 16” steel casing boring Alberta Road.
c. Applicant: North Alamo Water Supply Corporation
Legal Description: 10.00 acres out of Lot 6 Blk. 93 MTL&I Subdivision (Uresti Street & Mile 19 North Road) (Pct. 4)
Location of Pipeline or Utilities: Existing 6” waterline east of Uresti Street.
Proposed improvement within Right-of-Way: One 3/4” water service line with a 2” PVC casing boring Uresti Street.
d. Applicant: North Alamo Water Supply Corporation
Legal Description: 4.17 acres out of Farm Tract 271 West Tract Subdivision (Mile 11 North Road & Mile 3 ½ West Road) (Pct. 1)
Location of Pipeline or Utilities: Existing 6” waterline south of Mile 11 North Road.
Proposed improvement within Right-of-Way: One 3/4” water service line with a 2” PVC casing boring Mile 11 North Road.
e.Applicant: North Alamo Water Supply Corporation
Legal Description: 5.00 acres out of Tract 10 Blk. 187 West Tract Subdivision (Mile 17 North Road & Mile 6 West Road) (Pct. 1)
Location of Pipeline or Utilities: Existing 4” waterline north of Mile 17 North Road.
Proposed improvement within Right-of-Way: One 3/4” water service line with a 2” PVC casing boring Mile 17 North Road.
f. Applicant: North Alamo Water Supply Corporation
Legal Description: 20.00 acres out of Lot 12 Blk. 45 Alamo Land & Sugar Subdivision; Proposed Cantera Hermosa Phase I Subdivision (Tower Road & Eldora Road) (Pct. 1)
Location of Pipeline or Utilities: Existing sanitary sewer manhole located along the southeast corner of Sedona Estates Subdivision along the north side of Sioux Road. Existing 8” waterline located along the southwest corner of Tower Road & Eldora Road.
Proposed improvement within Right-of-Way: One 8” force main sewer line will be extended along the north side of Sioux Road, west of Tower Road and north of Eldora Road crossing with a 16” PVC casing boring Tower Road along the north side of Eldora Road ending at a proposed lift station. One 8” PVC waterline line extension running east along the south side of Eldora Road with a 16” steel casing boring Tower Road. One 8” PVC waterline crossing with a 16” PVC casing boring Eldora Road.
g. Applicant: Agua Special Utility District
Legal Description: Lot 107 La Homa Road North Subdivision (Graham Avenue & La Homa Road) (Pct.3)
Location of Pipeline or Utilities: Existing 4” waterline north of Graham Avenue.
Proposed improvement within Right-of-Way: One 1” water service line with a 2” PVC casing boring Graham Avenue.
h. Applicant: Agua Special Utility District
Location of Pipeline or Utilities: Existing 8” waterline west of Brushline Road (Pct. 3).
Proposed improvement within Right-of-Way: Two 8” PVC water lines with a 16” PVC casing boring
Brushline Road.Three 1” HDPE water service lines with a 2” PVC casing boring Brushline Road.
i. Applicant: Fiberlight LLC. (Segment #CC023285)
Proposed location of Fiber Optic Cable:Starting at the northwest corner of Texas Road & Mile 12 North Road (1) 1 ¼” HDPE SDR-11 Conduits will be extended west approximately 300 feet along the north side of Mile 12 North Road. (Pct. 1)
j. Applicant: Spectrum (Project No. 1724542)
Proposed location of Power Supply Pole: West of Mile 2 ½ East Road approximately 140.00 feet north of Ramiro Cavazos Road.
(Pct. 1)
k. Applicant: Spectrum (Project No. 1921675)
Proposed location of Power Supply Pole: East of Minnesota Road approximately ½ mile north of Mile 7 North Road. (Pct. 3)
l. Applicant: Spectrum (Project No. 2909076)
Proposed location of Power Supply Pole: North of Trenton Road approximately 30.00 feet east of Carl Street. (Pct. 4)
m. Applicant: Spectrum (Project No. 1807788 SM116)
Proposed location of Power Supply Pole: North of Mile 7 ½ North Road approximately 500.00 feet east of Stewart Road. (Pct. 3)
n. Applicant: Spectrum (Project No. 1807788 SM117)
Proposed location of Power Supply Pole: Northwest corner of Glasscock Road & Mile 7 ½ North Road. (Pct. 3)
o. Applicant: Spectrum (Project No. 1921675 SM133)
Proposed location of Power Supply Pole: East of Minnesota Road approximately 200.00 feet south of Gavilan Lane. (Pct. 3)
BACKGROUND
Fiscal Impact
Attachments
- 1- La Dona L-2B-16
- 2- prpo. las olas
- 3-MTL-I L-6 blk. 93
- 4-West Tract 271
- 5-WEST TRACT BLK 187
- 6-alamo land lot12 blk. 45
- 7-la homa rd lot 107
- 8-brushline rd
- 9-fiberlight cc02328s
- 10-spectrum 1724542
- 11-spectrum 1921675
- 12-spectrum 2909076
- 13-spectrum 1807788 sm116
- 14-spectrum 1807788 sm117
- 15-spectrum 1921675 sm133
Form Review
| Inbox | Reviewed By | Date |
|---|---|---|
| Budget and Management | Veronica Ortiz | 08/13/2021 04:49 PM |
| Final Approval | Monica Salinas | 08/20/2021 05:34 PM |
- Form Started By:
- Flor Castillo
- Started On:
- 08/11/2021 04:44 PM
- Final Approval Date:
- 08/20/2021