1. Preliminary Approval with Variance Request
a. Greener Pastures Mobile Home Phase II Subdivision- Pct. 1 (Amistad Finance, LLC.) (Main Gate Drive & Mile 5 North Road)
 No. of Lots: 14 Single Family
 Flood Zone: B
 Estimated Number of Streetlights:6
 Filling Stations:3
 Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by proposed onsite detention facility.
 ETJ: Yes, approved by the City of Weslaco.
 Water: Yes, provided by City of Weslaco.
 Sewer: Yes, provided by City of Weslaco
 Paved: Yes, Main Gate Drive and Corral Drive are paved.
 
2. Preliminary Approval
a. Best Subdivision- Pct. 4 (Donald Wade Best) (Mile 8 North Road & Bentsen Road)
 No. of Lots: 1 Single Family
 Flood Zone: X Unshaded
 Estimated Number of Streetlights:N/A
 Filling Stations:N/A
 Drainage: Yes, Drainage will be provided by natural perculation and surface runoff onto Mile 8 North Road side ditch. 
 ETJ: Yes, approved by the City of McAllen.
 Water: Yes, provided by Sharyland Water Supply Corporation.
 Sewer: Yes, OSSF’S.
 Paved: Yes, Mile 8 North Road is paved.
 
b. Buena Vista Estates Phase I Subdivision- Pct. 2 (Dulce Hernandez) (El Gato Road & Border Road)
 No. of Lots: 107 Single Family
 Flood Zone: B
 Estimated Number of Streetlights:14
 Filling Stations:8
 Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by widening the existing drain ditch.
 ETJ: Yes, City of Alamo.
 Water: Yes, provided by Military Highway Water Supply Corporation.
 Sewer: Yes, provided by Military Highway Water Supply Corporation.
 Paved: Yes, El Gato Road and 3rd Street are paved. 3 internal streets to be paved.
 
3. Final Approval with Financial Guarantee
a. Agado Subdivision- Pct. 1 (Eloy Agado) (U.S. Hwy 281 & F.M. 491)
 No. of Lots: 3 Single Family,2 Commercial
 Flood Zone: C
 Number of Streetlights:N/A
 Filling Stations:1
 Drainage: Yes, Drainage will be provided by onsite detention within the commercial lots discharging onto U.S. Hwy 281 road side ditch.
 ETJ: No, Rural Area.
 Water: Yes, provided by Military Highway Water Supply Corporation.
 Sewer: Yes, OSSF’s has been escrowed.
 Paved: Yes, (U.S. Hwy 281) Military Road is paved and an 1/3 escrow for Old Military Road has been submitted.
 * Final Approval with a cash deposit in the amount of $4,500.00 for (3) OSSF’S & $2,727.78 for (Shared driveways)
 
b. Villas Zepeda Subdivision- Pct. 1 (Lauro Zepeda) (Baker Road & FM 1015)
 No. of Lots: 8 Single Family
 Flood Zone: B
 Number of Streetlights:N/A
 Filling Stations:1
 Drainage: Yes, Drainage will be provided by natural perculation and surface runoff onto Baker Road side ditch.
 ETJ: No, Rural Area.
 Water: Yes, provided by Military Highway Water Supply Corporation.
 Sewer: Yes, 8 OSSF’S have been escrowed.
 Paved: Yes, Baker Road is paved.
 * Final Approval with a cash deposit in the amount of $12,000.00 for (8) OSSF’S

c. RBR No. 3 Subdivision- Pct. 4 (RBR Development & Inv., LLC.)(Mile 21 North Road & Skinner Road)
 No. of Lots: 34 Single Family
 Flood Zone: X
 Number of Streetlights:5
 Filling Stations:2
 Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by widening the existing drain ditch.
 ETJ: No, Rural Area.
 Water: Yes, provided by North Alamo Water Supply Corporation.
 Sewer: Yes, OSSF’S have been installed.
 Paved: Yes, Benito Ramirez Road and Skinner Road are paved.
* Final Approval with a cash deposit in the amount of $5,400.00 for (2) Filling Stations

4. Final Approval
a. J. Leal Subdivision- Pct. 3 (Jesus Eliu Leal De Leon) (Trosper Road & Mile 7 North Road)
 No. of Lots: 1 Commercial
 Flood Zone: X
 Number of Streetlights:N/A
 Filling Stations:1
 Drainage: Yes, Drainage will be provided by onsite detention which will connect to an existing TxDOT storm system at building permit stage.
 ETJ: Yes, approved by the City of McAllen.
 Water: Yes, provided by Sharyland Water Supply Corporation.
 Sewer: Yes, OSSF’S will be installed at building permit stage.
 Paved: Yes, Mile 7 North Road and Trosper Road are paved.
 
b. RePlat of Lots 363 & 364 San Joaquin Subdivision Phase III - Pct. 1 (Buena Tierra Dev., Inc.) (Minnesota Road & Valverde Road)
 No. of Lots: 4 Commercial
 Flood Zone: C
 Number of Streetlights:N/A
 Filling Stations:2
 Drainage: Yes, Drainage will be provided by onsite detention within the commercial lots and discharging onto Valverde Road side ditch.
 ETJ: Yes, approved by the City of Donna.
 Water: Yes, provided by North Alamo Water Supply Corporation.
 Sewer: Yes, Sanitary Sewer provided by North Alamo Water Supply Corporation.
 Paved: Yes, Valverde Road and Minnesota Road are paved.

BACKGROUND


Fiscal Impact

Attachments

Form Review

Inbox Reviewed By Date
Budget and Management Veronica Ortiz 10/14/2021 08:22 AM
Final Approval Monica Salinas 10/15/2021 02:57 PM
Form Started By:
Flor Castillo
Started On:
10/13/2021 05:06 PM
Final Approval Date:
10/15/2021