1. PIPELINE AND UTILITY PERMITS
a. Applicant: North Alamo Water Supply Corporation
Legal Description: All of Farm Tracts 1065, 1066 and 1071 West & Adams Tract Subdivision; Proposed Vaquero Estates Ph. 5 Subdivision (F.M. 1015 & Mile 11 North Road) (Pct. 1)
Location of Pipeline or Utilities: Existing sanitary sewer manhole located northwest corner of FM 1015 and Eagle Drive.
Proposed improvement within Right-of-Way: One 6” sanitary sewer line extension running east approximately 300.00 feet along the south side of Mile 11 North Road.
b. Applicant: North Alamo Water Supply Corporation
Legal Description: A 26.62 Tract of land out of 229 Hall Field Subdivision; Proposed Whalen Springs No. 2 Subdivision
(Moore Road & Whalen Road) (Pct. 1)
Location of Pipeline or Utilities: Existing 8” waterline west of Whalen Road.
Proposed improvement within Right-of-Way: One 8” water line with a 16” PVC casing boring Whalen Road.
c. Applicant: North Alamo Water Supply Corporation
Legal Description: A 2.06 acres tract of land being a portion of Lot 12 Blk 149 West & Adams Tract Subdivision; Proposed Riojas-Camacho Subdivision (Mile 14 ½ North Road & FM 88) (Pct. 1)
Location of Pipeline or Utilities: Existing 6” waterline east of Mesquite Circle.
Proposed improvement within Right-of-Way: One 3/4” water service line with a 2” PVC casing boring Mesquite Circle.
d. Applicant: Spectrum (Project No. 1831564-WE16)
Proposed location of Power Supply Pole: East of Alma Street approximately 80.00 feet south of FM 2812. (Pct. 1)
e. Applicant: Spectrum (Project No. 1831564-WE115)
Proposed location of Power Supply Pole: North of Mile 22 ½ North Road approximately 300.00 feet west of La Blanca Road. (Pct. 1)
f. Applicant: Spectrum (Project No. 1776592-WE111)
Proposed location of Power Supply Pole: South of Mile 19 North Road approximately 200.00 feet east of Hidalgo Street. (Pct. 1)
g. Applicant: Spectrum (Project No. 1672619-EM123)
Proposed location of Power Supply Pole: North of Davis Road approximately 200.00 feet west of Tower Road. (Pct. 4)
h. Applicant: Spectrum (Project No. 1879858-PM098)
Proposed location of Power Supply Pole: North of Wisconsin Road approximately 100.00 feet west of Valverde Road. (Pct. 4)
i. Applicant: Spectrum (Project No. 1983091-EM125)
Proposed location of Power Supply Pole: East of Cesar Chavez Road approximately 400.00 feet south of Curve Road. (Pct. 4)
a. Applicant: North Alamo Water Supply Corporation
Legal Description: All of Farm Tracts 1065, 1066 and 1071 West & Adams Tract Subdivision; Proposed Vaquero Estates Ph. 5 Subdivision (F.M. 1015 & Mile 11 North Road) (Pct. 1)
Location of Pipeline or Utilities: Existing sanitary sewer manhole located northwest corner of FM 1015 and Eagle Drive.
Proposed improvement within Right-of-Way: One 6” sanitary sewer line extension running east approximately 300.00 feet along the south side of Mile 11 North Road.
b. Applicant: North Alamo Water Supply Corporation
Legal Description: A 26.62 Tract of land out of 229 Hall Field Subdivision; Proposed Whalen Springs No. 2 Subdivision
(Moore Road & Whalen Road) (Pct. 1)
Location of Pipeline or Utilities: Existing 8” waterline west of Whalen Road.
Proposed improvement within Right-of-Way: One 8” water line with a 16” PVC casing boring Whalen Road.
c. Applicant: North Alamo Water Supply Corporation
Legal Description: A 2.06 acres tract of land being a portion of Lot 12 Blk 149 West & Adams Tract Subdivision; Proposed Riojas-Camacho Subdivision (Mile 14 ½ North Road & FM 88) (Pct. 1)
Location of Pipeline or Utilities: Existing 6” waterline east of Mesquite Circle.
Proposed improvement within Right-of-Way: One 3/4” water service line with a 2” PVC casing boring Mesquite Circle.
d. Applicant: Spectrum (Project No. 1831564-WE16)
Proposed location of Power Supply Pole: East of Alma Street approximately 80.00 feet south of FM 2812. (Pct. 1)
e. Applicant: Spectrum (Project No. 1831564-WE115)
Proposed location of Power Supply Pole: North of Mile 22 ½ North Road approximately 300.00 feet west of La Blanca Road. (Pct. 1)
f. Applicant: Spectrum (Project No. 1776592-WE111)
Proposed location of Power Supply Pole: South of Mile 19 North Road approximately 200.00 feet east of Hidalgo Street. (Pct. 1)
g. Applicant: Spectrum (Project No. 1672619-EM123)
Proposed location of Power Supply Pole: North of Davis Road approximately 200.00 feet west of Tower Road. (Pct. 4)
h. Applicant: Spectrum (Project No. 1879858-PM098)
Proposed location of Power Supply Pole: North of Wisconsin Road approximately 100.00 feet west of Valverde Road. (Pct. 4)
i. Applicant: Spectrum (Project No. 1983091-EM125)
Proposed location of Power Supply Pole: East of Cesar Chavez Road approximately 400.00 feet south of Curve Road. (Pct. 4)
BACKGROUND
Fiscal Impact
Attachments
- West Adams
- Hall Field
- Pedro
- 1-Cardinal Island subd- B Notorized 1
- 2-Cardinal Island subd- A Notorized 1
- 3-Bar Subdivision 8311 Mile 9 north notorized. 1
- 4-mount Davis 6815-A Davis rd. notorized
- 5-Verde Ranch Subd. 10466 Vale Verde rd.
- 6-Patlan Subd. 1105 Cesar Chavez notorized
Form Review
| Inbox | Reviewed By | Date |
|---|---|---|
| Budget and Management | Veronica Ortiz | 10/15/2021 02:38 PM |
| Final Approval | Monica Salinas | 10/15/2021 02:48 PM |
- Form Started By:
- Flor Castillo
- Started On:
- 10/14/2021 04:49 PM
- Final Approval Date:
- 10/15/2021