AI- 85499
Purchasing Department   25.D.1.
CC REGULAR AGENDA SPECIAL MTG
Prct. 1
Meeting Date:
04/19/2022
Submitted For:
Eduardo Belmarez
Submitted By:
Hector Garcia, PURCHASING DEPT.
Department:
PURCHASING DEPT.

CAPTION

Requesting approval of the following Change Order for Texas Cordia Construction, LLC [C-19-274-04-07], as recommended by the project engineer, SAMES, in connection to HC Precinct No.1-Mile 6 W Road Project (Mile 9 to Mile 11). 
 
Description Total Amount
Change Order No.6
*Modifications to the construction based on two conflicts identified in the field.
$134,012.35

BACKGROUND

  • A discrepancy was identified between the elevation of the properties and the final elevation of the proposed roadway at the northwest corner of Mile 6 Wand Mile 10 N. The elevation difference is around 4 feet. The Design Engineer has provided updated construction plans and specs to mitigate this discrepancy. Total Changes Cost= $123,512.35
  • Additional items were required for CO#1 after its approval due to a field conflict. Design Engineers updated Plan Sheet 180 to overrun Item Number 1008-6003 Pressure Irrigation PVC Pipe (12-in) by a quantity of 75 LF. Total Changes Cost= $10,500.00
  • The Design Engineer has provided updated construction plans and specs to mitigate these issues. The updated plans were forwarded to Texas Cordia Construction (TCC) along with a directive to provide a proposal for this work. TCC submitted a proposal for this item, and it was forwarded to TxDOT for concurrence. TxDOT approved the proposal as submitted.

Fiscal Impact

CALENDAR YEAR:
2021
ACCT. #:
1-1351-431-00-121-039-1-721
FUNDS AVAILABLE Y/N?:
pending
MATCHING FUNDS Y/N?:

BUDGETARY IMPACT:

Funding TBD by Precinct No.1

Attachments

Form Review

Inbox Reviewed By Date
Purchasing / Internal ebelmarez 04/14/2022 01:25 PM
Budget and Management Veronica Ortiz 04/14/2022 02:03 PM
Final Approval Monica Salinas 04/15/2022 04:20 PM
Form Started By:
Hector Garcia
Started On:
04/14/2022 07:44 AM
Final Approval Date:
04/15/2022