AI- 85995
Planning Department 5.B.
CC CONSENT AGENDA SPECIAL MTG
- Meeting Date:
- 05/31/2022
- Submitted For:
- Flor Castillo
- Submitted By:
- Flor Castillo, PLANNING DEPT.
- Department:
- PLANNING DEPT.
Information
CAPTION
1. Preliminary Approval
a. Gonzalez Heights Subdivision- Pct. 4 (Nelda Karina Gonzalez) (Barb Mar Lane & Aurora Drive)
No. of Lots: 1 Single-Family
Flood Zone: X & AH
Estimated Number of Streetlights:N/A
Filling Stations:N/A
Drainage: Yes, Drainage will be provided by onsite detention and surface runoff will drain into Barb Mar Lane road side ditch.
ETJ: Yes, City of Edinburg.
Water: Yes, provided by City of Edinburg.
Sewer: Yes, OSSF’S.
Paved: Yes, Barb Mar Lane is paved.
b. Cantu Commercial Plaza Subdivision- Pct. 1 (Roel & Joann Cantu) (valverde Road & Minnesota Road)
No. of Lots: 2 Commercial
Flood Zone: C
Estimated Number of Streetlights:N/A
Filling Stations:1
Drainage: Yes, Drainage will be provided by onsite detention with an overflow structure discharging to Valverde Road.
ETJ: Yes, City of Donna.
Water: Yes, provided by North Alamo Water Supply Corporation
Sewer: Yes, OSSF’S will be installed at building permit stage.
Paved: Yes, Valverde Road is paved.
c. A. Peña Subdivision- Pct. 4 (Rodolfo & Melissa Peña) (Citrus Drive & Mile 11 North Road)
No. of Lots: 2 Single Family
Flood Zone: X
Estimated Number of Streetlights:N/A
Filling Stations:N/A
Drainage: Yes, Drainage will be provided by natural perculation and surface runoff will drain into Citrus Drive road side ditch.
ETJ: Yes, City of McAllen.
Water: Yes, provided by Sharyland Water Supply Corporation.
Sewer: Yes, OSSF’S.
Paved: Yes, Citrus Drive is paved.
d. Replat of Lot 24 Santa Cruz Ranches No. 2 Subdivision- Pct. 4 (Marcos Rivera) (Calle Paris & Mile 22 ½ North Road)
No. of Lots: 2 Single-Family
Flood Zone: X
Estimated Number of Streetlights:N/A
Filling Stations:1
Drainage: Yes, Drainage will be provided by natural perculation and surface runoff will drain into Calle Paris road side ditch
ETJ: Yes, City of Edinburg.
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, OSSF’S.
Paved: Yes, Calle Paris is paved.
e. Replat of Lot 6 Los Encinos Subdivision- Pct. 2 (Donald & Elvira Suarez) (Alamo Road & F.M. 495)
No. of Lots: 2 Single-Family
Flood Zone: B
Estimated Number of Streetlights:N/A
Filling Stations:N/A
Drainage: Yes, Drainage will be provided by natural perculation and surface runoff will drain into the existing drainage system of Los Encinos No. 2 Subdivision.
ETJ: Yes, City of Alamo.
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, OSSF’S.
Paved: Yes, Oak Avenue is paved.
f. Eduardo’s No. 16 Phase II Subdivision- Pct. 3 (Las Hermanas Land Development, LLC.) (Trosper Road & Mile 3 North Road)
No. of Lots: 14 Single-Family
Flood Zone: C
Estimated Number of Streetlights:4
Filling Stations:2
Drainage: Yes, Drainage will be provided by an existing storm sewer system and detention will be provided by an existing drain ditch.
ETJ: Yes, City of Mission.
Water: Yes, provided by Sharyland Water Supply Corporation.
Sewer: Yes, provided by City of Mission.
Paved: Yes, Flor Drive is paved.
g. Conway Village Subdivision- Pct. 3 (Rimaga LLC.) (Conway Avenue & Mile 4 North Road)
No. of Lots: 36 Single-Family, 1 Commercial
Flood Zone: C
Estimated Number of Streetlights:10
Filling Stations:6
Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by onsite detention area discharging to a TxDot system.
ETJ: Yes, City of Mission.
Water: Yes, provided by Sharyland Water Supply Corporation.
Sewer: Yes, provided by City of Mission.
Paved: Yes, Conway Avenue and Mile 4 North Road are paved.
h. Rio Rico Ranchettes No. 3 Subdivision- Pct. 1 (Rio Rico Developers, LLC.) (Mile 1 ½ East Road & Mile 4 North Road)
No. of Lots: 51 Single-Family
Flood Zone: C
Estimated Number of Streetlights:12
Filling Stations:6
Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by widening the existing drain ditch.
ETJ: No, Rural Area.
Water: Yes, provided by Military Highway Water Supply Corporation.
Sewer: Yes, OSSF’S.
Paved: Yes, Mile 1 ½ East Road is paved and 2 internal streets to be paved.
i. Los Cortijos Subdivision- Pct. 4 (Cayetano Development) (Trenton Road & Tower Road)
No. of Lots: 182 Single-Family
Flood Zone: B
Estimated Number of Streetlights:22
Filling Stations:13
Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by a proposed drain ditch.
ETJ: Yes, City of Edinburg.
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, provided by North Alamo Water Supply Corporation.
Paved: Yes, Trenton Road is paved and 7 internal streets to be paved.
a. Gonzalez Heights Subdivision- Pct. 4 (Nelda Karina Gonzalez) (Barb Mar Lane & Aurora Drive)
No. of Lots: 1 Single-Family
Flood Zone: X & AH
Estimated Number of Streetlights:N/A
Filling Stations:N/A
Drainage: Yes, Drainage will be provided by onsite detention and surface runoff will drain into Barb Mar Lane road side ditch.
ETJ: Yes, City of Edinburg.
Water: Yes, provided by City of Edinburg.
Sewer: Yes, OSSF’S.
Paved: Yes, Barb Mar Lane is paved.
b. Cantu Commercial Plaza Subdivision- Pct. 1 (Roel & Joann Cantu) (valverde Road & Minnesota Road)
No. of Lots: 2 Commercial
Flood Zone: C
Estimated Number of Streetlights:N/A
Filling Stations:1
Drainage: Yes, Drainage will be provided by onsite detention with an overflow structure discharging to Valverde Road.
ETJ: Yes, City of Donna.
Water: Yes, provided by North Alamo Water Supply Corporation
Sewer: Yes, OSSF’S will be installed at building permit stage.
Paved: Yes, Valverde Road is paved.
c. A. Peña Subdivision- Pct. 4 (Rodolfo & Melissa Peña) (Citrus Drive & Mile 11 North Road)
No. of Lots: 2 Single Family
Flood Zone: X
Estimated Number of Streetlights:N/A
Filling Stations:N/A
Drainage: Yes, Drainage will be provided by natural perculation and surface runoff will drain into Citrus Drive road side ditch.
ETJ: Yes, City of McAllen.
Water: Yes, provided by Sharyland Water Supply Corporation.
Sewer: Yes, OSSF’S.
Paved: Yes, Citrus Drive is paved.
d. Replat of Lot 24 Santa Cruz Ranches No. 2 Subdivision- Pct. 4 (Marcos Rivera) (Calle Paris & Mile 22 ½ North Road)
No. of Lots: 2 Single-Family
Flood Zone: X
Estimated Number of Streetlights:N/A
Filling Stations:1
Drainage: Yes, Drainage will be provided by natural perculation and surface runoff will drain into Calle Paris road side ditch
ETJ: Yes, City of Edinburg.
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, OSSF’S.
Paved: Yes, Calle Paris is paved.
e. Replat of Lot 6 Los Encinos Subdivision- Pct. 2 (Donald & Elvira Suarez) (Alamo Road & F.M. 495)
No. of Lots: 2 Single-Family
Flood Zone: B
Estimated Number of Streetlights:N/A
Filling Stations:N/A
Drainage: Yes, Drainage will be provided by natural perculation and surface runoff will drain into the existing drainage system of Los Encinos No. 2 Subdivision.
ETJ: Yes, City of Alamo.
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, OSSF’S.
Paved: Yes, Oak Avenue is paved.
f. Eduardo’s No. 16 Phase II Subdivision- Pct. 3 (Las Hermanas Land Development, LLC.) (Trosper Road & Mile 3 North Road)
No. of Lots: 14 Single-Family
Flood Zone: C
Estimated Number of Streetlights:4
Filling Stations:2
Drainage: Yes, Drainage will be provided by an existing storm sewer system and detention will be provided by an existing drain ditch.
ETJ: Yes, City of Mission.
Water: Yes, provided by Sharyland Water Supply Corporation.
Sewer: Yes, provided by City of Mission.
Paved: Yes, Flor Drive is paved.
g. Conway Village Subdivision- Pct. 3 (Rimaga LLC.) (Conway Avenue & Mile 4 North Road)
No. of Lots: 36 Single-Family, 1 Commercial
Flood Zone: C
Estimated Number of Streetlights:10
Filling Stations:6
Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by onsite detention area discharging to a TxDot system.
ETJ: Yes, City of Mission.
Water: Yes, provided by Sharyland Water Supply Corporation.
Sewer: Yes, provided by City of Mission.
Paved: Yes, Conway Avenue and Mile 4 North Road are paved.
h. Rio Rico Ranchettes No. 3 Subdivision- Pct. 1 (Rio Rico Developers, LLC.) (Mile 1 ½ East Road & Mile 4 North Road)
No. of Lots: 51 Single-Family
Flood Zone: C
Estimated Number of Streetlights:12
Filling Stations:6
Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by widening the existing drain ditch.
ETJ: No, Rural Area.
Water: Yes, provided by Military Highway Water Supply Corporation.
Sewer: Yes, OSSF’S.
Paved: Yes, Mile 1 ½ East Road is paved and 2 internal streets to be paved.
i. Los Cortijos Subdivision- Pct. 4 (Cayetano Development) (Trenton Road & Tower Road)
No. of Lots: 182 Single-Family
Flood Zone: B
Estimated Number of Streetlights:22
Filling Stations:13
Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by a proposed drain ditch.
ETJ: Yes, City of Edinburg.
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, provided by North Alamo Water Supply Corporation.
Paved: Yes, Trenton Road is paved and 7 internal streets to be paved.
BACKGROUND
Fiscal Impact
Attachments
- 1-GONZALEZ HEIGHTS;P
- 2-CANTU COMMERCIAL;P
- 3-A.PENA;P
- 4-RE-PLAT OF LOT 24 Santa Cruz Ranches 2;P
- 5-RePlat of Lot 6 Los Encinos ;P
- 6-EDUARDOS 16 PH2;P
- 7-CONWAY VILLAGE;P
- 8-RIO RICO RANCHETS NO3;P
- 9-LOS CORTIJOS;P
Form Review
| Inbox | Reviewed By | Date |
|---|---|---|
| Budget and Management | Veronica Ortiz | 05/25/2022 04:37 PM |
| Final Approval | Monica Salinas | 05/27/2022 06:18 PM |
- Form Started By:
- Flor Castillo
- Started On:
- 05/25/2022 03:36 PM
- Final Approval Date:
- 05/27/2022