AI- 90265
Planning Department 21.A.
CC REGULAR AGENDA SPECIAL MTG
- Meeting Date:
- 04/04/2023
- Submitted For:
- Flor Castillo
- Submitted By:
- Flor Castillo, PLANNING DEPT.
- Department:
- PLANNING DEPT.
CAPTION
1. Preliminary Approval with Variance Request
a. Replat of Lot 3 Owens Subdivision- Pct. 3 (Eloman Partnership, Ltd.) (I-2 & Main Blvd.)
No. of Lots: 1 Multi-Family
Flood Zone: C
Estimated Number of Streetlights:N/A
Filling Stations:2
Drainage: Yes, Drainage will be provided by onsite detention with a proposed 8” bleeder line connecting onto a TxDot System.
ETJ: Yes, City of Mission.
Water: Yes, provided by H.C.M.U.D. 1.
Sewer: Yes, provided by H.C.M.U.D. 1
Paved: Yes, Expressway 83 is paved.
2. Final Approval with Financial Guarantee
a. North Victoria Estates Subdivision- Pct. 1 (J&D Tierra Ventures, LLC.) (Victoria Road & Mile 10 North Road )
No. of Lots: 13 Single-Family
Flood Zone: X
Number of Streetlights:4
Filling Stations:3
Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by widening the existing drain ditch.
ETJ: Yes, City of Donna.
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, OSSF’S have been escrowed.
Paved: Yes, Victoria Road and 1 internal street are paved.
* Final Approval with a cash deposit in the amount of $19,500.00 for (13 OSSF’S)
b. Santa Cruz Ranches No. 4 Phase A Subdivision- Pct. 4 (KNK Farms, LLC.) (Mile 22 ½ North Road & F.M. 493)
No. of Lots: 140 Single-Family
Flood Zone: B
Number of Streetlights:57
Filling Stations:26
Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by a new drain ditch.
ETJ: No, Rural Area.
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, OSSF’S have been escrowed.
Paved: Yes, Mile 22 ½ North Road and 6 internal streets have been paved.
* Final Approval with a cash deposit in the amount of $210,000.00 for (140 OSSF’S)
3. Final Approval
a. Valverde Battery Storage Facility Subdivision- Pct. 1 (Hunt Energy Network) (Roosevelt Road & Valverde Road)
No. of Lots: 1 Industrial
Flood Zone: C
Number of Streetlights:N/A
Filling Stations:N/A
Drainage: Yes, Drainage will be provided by natural perculation and surface runoff will drain into Roosevelt Road side ditch.
ETJ: Yes, City of Donna.
Paved: Yes, Roosevelt Road is paved.
b. Replat of Lots 1 & 2 of the Josefina Subdivision- Pct. 1 (Josefina Espericueta) (Valverde Road & Canton Road)
No. of Lots: 2 Commercial
Flood Zone: C
Number of Streetlights:N/A
Filling Stations:N/A
Drainage: Yes, Drainage will be provided by natural perculation and surface runoff onto Canton Road side ditch.
ETJ: Yes, City of Edinburg.
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, OSSF’S will be installed at permit stage.
Paved: Yes, Valverde Road and Canton Road are paved.
c. Garza-Lopez Subdivision- Pct. 1 (Christopher Espinoza) (Minnesota Road & Valverde Road)
No. of Lots: 2 Single Family
Flood Zone: C
Number of Streetlights:N/A
Filling Stations:N/A
Drainage: Yes, Drainage will be provided by natural perculation and surface runoff will drain into Minnesota Road side ditch.
ETJ: Yes, City of Donna.
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, provided by North Alamo Water Supply Corporation.
Paved: Yes, Minnesota Road is paved.
d. Monarca Estates Subdivision- Pct. 4 (John R. Mays) (Owassa Road & Alamo Road)
No. of Lots: 167 Single Family
Flood Zone: B
Number of Streetlights:23
Filling Stations:9
Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by widening the existing drain ditch.
ETJ: Yes, City of Edinburg.
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, provided by North Alamo Water Supply Corporation.
Paved: Yes, Owassa Road and 7 internal streets have been paved.
a. Replat of Lot 3 Owens Subdivision- Pct. 3 (Eloman Partnership, Ltd.) (I-2 & Main Blvd.)
No. of Lots: 1 Multi-Family
Flood Zone: C
Estimated Number of Streetlights:N/A
Filling Stations:2
Drainage: Yes, Drainage will be provided by onsite detention with a proposed 8” bleeder line connecting onto a TxDot System.
ETJ: Yes, City of Mission.
Water: Yes, provided by H.C.M.U.D. 1.
Sewer: Yes, provided by H.C.M.U.D. 1
Paved: Yes, Expressway 83 is paved.
2. Final Approval with Financial Guarantee
a. North Victoria Estates Subdivision- Pct. 1 (J&D Tierra Ventures, LLC.) (Victoria Road & Mile 10 North Road )
No. of Lots: 13 Single-Family
Flood Zone: X
Number of Streetlights:4
Filling Stations:3
Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by widening the existing drain ditch.
ETJ: Yes, City of Donna.
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, OSSF’S have been escrowed.
Paved: Yes, Victoria Road and 1 internal street are paved.
* Final Approval with a cash deposit in the amount of $19,500.00 for (13 OSSF’S)
b. Santa Cruz Ranches No. 4 Phase A Subdivision- Pct. 4 (KNK Farms, LLC.) (Mile 22 ½ North Road & F.M. 493)
No. of Lots: 140 Single-Family
Flood Zone: B
Number of Streetlights:57
Filling Stations:26
Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by a new drain ditch.
ETJ: No, Rural Area.
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, OSSF’S have been escrowed.
Paved: Yes, Mile 22 ½ North Road and 6 internal streets have been paved.
* Final Approval with a cash deposit in the amount of $210,000.00 for (140 OSSF’S)
3. Final Approval
a. Valverde Battery Storage Facility Subdivision- Pct. 1 (Hunt Energy Network) (Roosevelt Road & Valverde Road)
No. of Lots: 1 Industrial
Flood Zone: C
Number of Streetlights:N/A
Filling Stations:N/A
Drainage: Yes, Drainage will be provided by natural perculation and surface runoff will drain into Roosevelt Road side ditch.
ETJ: Yes, City of Donna.
Paved: Yes, Roosevelt Road is paved.
b. Replat of Lots 1 & 2 of the Josefina Subdivision- Pct. 1 (Josefina Espericueta) (Valverde Road & Canton Road)
No. of Lots: 2 Commercial
Flood Zone: C
Number of Streetlights:N/A
Filling Stations:N/A
Drainage: Yes, Drainage will be provided by natural perculation and surface runoff onto Canton Road side ditch.
ETJ: Yes, City of Edinburg.
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, OSSF’S will be installed at permit stage.
Paved: Yes, Valverde Road and Canton Road are paved.
c. Garza-Lopez Subdivision- Pct. 1 (Christopher Espinoza) (Minnesota Road & Valverde Road)
No. of Lots: 2 Single Family
Flood Zone: C
Number of Streetlights:N/A
Filling Stations:N/A
Drainage: Yes, Drainage will be provided by natural perculation and surface runoff will drain into Minnesota Road side ditch.
ETJ: Yes, City of Donna.
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, provided by North Alamo Water Supply Corporation.
Paved: Yes, Minnesota Road is paved.
d. Monarca Estates Subdivision- Pct. 4 (John R. Mays) (Owassa Road & Alamo Road)
No. of Lots: 167 Single Family
Flood Zone: B
Number of Streetlights:23
Filling Stations:9
Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by widening the existing drain ditch.
ETJ: Yes, City of Edinburg.
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, provided by North Alamo Water Supply Corporation.
Paved: Yes, Owassa Road and 7 internal streets have been paved.
BACKGROUND
Fiscal Impact
Attachments
- 1-RE-PLAT LOT 3 OWENS SUBD;P
- 2-North Victoria Est;F
- 3-Santa Cruz Ranches No 4 Ph A;F
- 4-Valverde Battery Storage;F
- 5-Replat L-1-2,Josefina;F
- 6-Garza-Lopez;F
- 7-MONARCA EST.; F
Form Review
| Inbox | Reviewed By | Date |
|---|---|---|
| Budget and Management | Damiana Molina | 03/29/2023 03:41 PM |
| Final Approval | Monica Salinas | 03/31/2023 05:42 PM |
- Form Started By:
- Flor Castillo
- Started On:
- 03/29/2023 01:42 PM
- Final Approval Date:
- 03/31/2023