AI- 93230
Planning Department 5.C.
CC CONSENT AGENDA SPECIAL MTG
- Meeting Date:
- 11/14/2023
- Submitted For:
- Flor Castillo
- Submitted By:
- Flor Castillo
- Department:
- PLANNING DEPT.
Information
CAPTION
1. Preliminary Approval
a. AAA Apartments Subdivision- Pct. 3 (Anissa Izel Sanchez) (Mile 5 North Road & Shary Road)
No. of Lots: 1 Single-Family, 1 Multi-Family
Flood Zone: X
Estimated Number of Streetlights:N/A
Filling Stations:1
Drainage: Yes, Drainage will be provided by natural perculation and surface runoff will drain into Mile 5 North Road side ditch and by onsite detention at the building permit stage.
ETJ: Yes, City of McAllen.
Water: Yes, provided by Sharyland Water Supply Corporation.
Sewer: Yes, OSSF’S.
Paved: Yes, Mile 5 North Road is paved.
b. Owassa Place Subdivision- Pct. 1 (Valley Affordable Housing, LLC) (Owassa Road & Tower Road)
No. of Lots: 15 Single-Family
Flood Zone: C
Estimated Number of Streetlights:4
Filling Stations:2
Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by widening the existing drain ditch.
ETJ: Yes, City of Edinburg.
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, OSSF’S.
Paved: Yes, Owassa Road is paved and 1 internal street to be paved.
a. AAA Apartments Subdivision- Pct. 3 (Anissa Izel Sanchez) (Mile 5 North Road & Shary Road)
No. of Lots: 1 Single-Family, 1 Multi-Family
Flood Zone: X
Estimated Number of Streetlights:N/A
Filling Stations:1
Drainage: Yes, Drainage will be provided by natural perculation and surface runoff will drain into Mile 5 North Road side ditch and by onsite detention at the building permit stage.
ETJ: Yes, City of McAllen.
Water: Yes, provided by Sharyland Water Supply Corporation.
Sewer: Yes, OSSF’S.
Paved: Yes, Mile 5 North Road is paved.
b. Owassa Place Subdivision- Pct. 1 (Valley Affordable Housing, LLC) (Owassa Road & Tower Road)
No. of Lots: 15 Single-Family
Flood Zone: C
Estimated Number of Streetlights:4
Filling Stations:2
Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by widening the existing drain ditch.
ETJ: Yes, City of Edinburg.
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, OSSF’S.
Paved: Yes, Owassa Road is paved and 1 internal street to be paved.
BACKGROUND
Fiscal Impact
Attachments
Form Review
| Inbox | Reviewed By | Date |
|---|---|---|
| Budget and Management | Damiana Molina | 11/09/2023 10:06 AM |
| Final Approval | Monica Salinas | 11/09/2023 05:20 PM |
- Form Started By:
- Flor Castillo
- Started On:
- 11/08/2023 04:09 PM
- Final Approval Date:
- 11/09/2023