Skip to main content

AgendaQuick™

View Agenda Item

AI- 95532
Planning Department   16.A.
CC REGULAR AGENDA SPECIAL MTG
Meeting Date:
06/11/2024
Submitted For:
Flor Castillo
Submitted By:
Flor Castillo
Department:
PLANNING DEPT.

CAPTION

1. Preliminary Approval with Variance Request
a. Uri Estates No. 3 Subdivision- Pct. 4 (TJ & CJ Land LTD.) (Gwin Road & Ingle Road)
No. of Lots: 22 Single Family
Flood Zone: X & AE
Estimated Number of Streetlights: N/A
Filling Stations:3
Drainage: Yes, Drainage will be provided by natural perculation and surface runoff will drain into Gwin Road and Ingle Roadside ditch.
ETJ: No, Rural Area (Has been released from City’s ETJ)
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, OSSF’S.
Paved: Yes, Ingle Road is paved and Gwin Road is to be paved.

b. Midway Estates Subdivision- Pct. 1 (Sandoval Capital Group, LLC.) (Midway Road & Stites Road)
No. of Lots: 48 Single Family
Flood Zone: X
Estimated Number of Streetlights:6
Filling Stations:3
Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by widening the existing drain ditch.
ETJ: Yes, City of Donna.
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, provided by the City of Donna.
Paved: Yes, Midway Road is paved and 4 internal streets are to be paved.

2. Final Approval with Financial Guarantee
a. Uri Estates No. 2 Subdivision- Pct. 4 (TJ & CJ Land, Ltd.) (Davis Road & Cesar Chavez Road)
No. of Lots: 22 Single Family
Flood Zone: X
Number of Streetlights:  N/A
Filling Stations:  2
Drainage: Yes, Drainage will be provided by natural perculation and surface runoff will drain into Davis Road and Cesar Chavez Roadside ditch.
ETJ: No, Rural Area (Has been released from City’s ETJ)
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, OSSF’S have been installed.
Paved: Yes, Davis Road is paved and Cesar Chavez has been paved.
* Final Approval with a cash deposit in the amount of $7,300.00 for (Fire hydrants)

b. Cantera Hermosa Phase 5 Subdivision- Pct. 1 (Tres Canteras, L.P.) (Eldora Road & Tower Road)
No. of Lots: 77 Single Family
Flood Zone: C
Number of Streetlights:  11
Filling Stations:  6
Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by a new drain ditch dedicated to HCDD#1.
ETJ: Yes, City of Alamo.
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, provided by North Alamo Water Supply Corporation.
Paved: Yes, Eldora Road is paved and 4 internal streets have been paved.
* Final Approval with a cash deposit in the amount of $18,000.00 for (Paving Improvements)

3. Final Approval
a. GTO Subdivision- Pct. 4 (Sergio Garcia Padilla) (Texas Road & Tower Road)
No. of Lots: 1 Single Family
Flood Zone: C
Number of Streetlights:  N/A
Filling Stations:  N/A
Drainage: Yes, Drainage will be provided by natural perculation and surface runoff will drain into Texas Roadside ditch.
ETJ: Yes, City of Edinburg.
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, OSSF has been installed.
Paved: Yes, Texas Road is paved.

b. E6 Ranch Subdivision- Pct. 1 (Antonio Garcia Jr.) (Mile 5 West Road & Mile 10 North Road)
No. of Lots: 1 Single Family
Flood Zone: X
Number of Streetlights:  N/A
Filling Stations:  N/A
Drainage: Yes, Drainage will be provided by natural perculation and surface runoff will drain into Mile 5 West Roadside ditch.
ETJ: Yes, City of Weslaco.
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, OSSF has been installed.
Paved: Yes, F.M. 88 is paved.

c. Jameson Estates Subdivision- Pct. 4 (Jose Jameson) (Davis Road & Alamo Road)
No. of Lots: 2 Single Family
Flood Zone: X
Number of Streetlights:  N/A
Filling Stations:  N/A
Drainage: Yes, Drainage will be provided by natural perculation and surface runoff will drain into Davis Roadside ditch.
ETJ: Yes, City of Edinburg.
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, OSSF’S have been installed.
Paved: Yes, Davis Road is paved.

d. Tierra Roosevelt Subdivision- Pct. 1 (C&N Farms, LLC.) (Roosevelt Road & La Blanca Road)
No. of Lots: 25 Single Family
Flood Zone: C
Number of Streetlights:  5
Filling Stations:  2
Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by widening the existing drain ditch.
ETJ: Yes, City of Donna.
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, OSSF’S have been installed.
Paved: Yes, Roosevelt Road is paved and 1 internal street has been paved.

BACKGROUND


Fiscal Impact

Attachments

Form Review

Inbox Reviewed By Date
Budget and Management Veronica Ortiz 05/31/2024 04:02 PM
Final Approval Monica Salinas 06/07/2024 05:30 PM
Form Started By:
Flor Castillo
Started On:
05/31/2024 03:02 PM
Final Approval Date:
06/07/2024