Skip to main content

AgendaQuick™

View Agenda Item

AI- 96516
Planning Department   17.A.
CC REGULAR AGENDA SPECIAL MTG
Meeting Date:
09/03/2024
Submitted For:
Flor Castillo
Submitted By:
Flor Castillo
Department:
PLANNING DEPT.

CAPTION

1. Preliminary Approval with Variance Request
a. San Joaquin Estates No. 2 Subdivision- Pct. 1 (C & N Farms, LLC.) (Mile 12 North Road & F.M. 493)
No. of Lots: 135 Single-Family
Flood Zone: C
Estimated Number of Streetlights:16
Filling Stations:8
Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by widening the existing drain ditch.
ETJ: Yes, City of Donna.
Water: Yes, provided by North Alamo Water Supply.
Sewer: Yes, provided by North Alamo Water Supply Corporation.
Paved: Yes, Mile 12 North Road and 9 internal streets are to be paved.

2. Final Approval with Financial Guarantee
a. Chestnut Subdivision- Pct. 1 (Diana Guzman) (F.M. 491 & Mile 4 North Road)
No. of Lots: 2 Single Family
Flood Zone: C
Number of Streetlights: N/A
Filling Stations: N/A
Drainage: Yes, Drainage will be provided by natural perculation and surface runoff will drain into F.M. 491 Roadside ditch.  
ETJ: Yes, City of Mercedes.
Water: Yes, provided by Military Highway Water Supply Corporation.
Sewer: Yes, (1) OSSF exists and (1) OSSF has been escrowed.
Paved: Yes, F.M. 491 is paved.
* Final Approval with a cash deposit in the amount of $1,996.50 for (1 OSSF & Drainage Imps.)

b. Lakehurst Phase 2 Subdivision- Pct. 4 (Sunni Jo Miller) (Mile 8 Road & Taylor Road)
No. of Lots: 3 Single Family
Flood Zone: A & X
Number of Streetlights: N/A
Filling Stations: N/A
Drainage: Yes, Drainage will be provided by natural perculation and surface runoff will drain into Mile 8 Roadside ditch.
ETJ: Yes, City of McAllen.
Water: Yes, provided by Sharyland Water Supply Corporation.
Sewer: Yes, OSSF for Lot 3 is existing.Lots 1-2 have been escrowed.
Paved: Yes, Mile 8 Road & Taylor Road are paved.
* Final Approval with a cash deposit in the amount of $3,000.00 for (2 OSSF’S)

c. Posz Estates Subdivision- Pct. 2 (Rebecca A. Posz) (Eldora Road & Cesar Chavez Road)
No. of Lots: 3 Single Family
Flood Zone: X
Number of Streetlights: N/A
Filling Stations: N/A
Drainage: Yes, Drainage will be provided by natural perculation and surface runoff will drain into Eldora Roadside ditch discharging onto an existing graded inlet.
ETJ: Yes, City of Alamo.
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, (1) OSSF is existing and (2) OSSF’S have been escrowed.
Paved: Yes, Eldora Road is paved.
* Final Approval with a cash deposit in the amount of $3,000.00 for (2 OSSF’S)

d. Pueblo De Palmas Phase 27 Subdivision- Pct. 4 (PDP Mile 4, Ltd.) (Mile 19 North Road & Kenyon Road)
No. of Lots: 17 Single Family
Flood Zone: X
Number of Streetlights: N/A
Filling Stations: 2
Drainage: Yes, Drainage will be provided by natural perculation and surface runoff will drain into Kenyon Road and Mile 19 North Roadside ditch.
ETJ: No, Rural Area
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: OSSF’S have been installed.
Paved: Yes, Mile 19 North Road and Kenyon Road are paved.
* Final Approval with a cash deposit in the amount of $9,800.00 for (2 Fire hydrants and Irrigation Improvements)

e. Highland Manor Phase 3 Subdivision- Pct. 1 (DASC Inv., LLC.) (Mile 5 ½ West Road & Mile 11 North Road)
No. of Lots: 19 Single Family
Flood Zone: X
Number of Streetlights:5
Filling Stations:3
Drainage: Yes, Drainage will be provided by the storm sewer system and detention will be provided by widening the existing drain ditch.
ETJ: Yes, City of Weslaco.
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: OSSF’S have been escrowed.
Paved: Yes, Mile 5 ½ West Road and 1 internal street are paved.
* Final Approval with a cash deposit in the amount of $38,250.00 for (3 Fire hydrants and 19 OSSF’S)

f. Uri Estates No. 3 Subdivision- Pct. 4 (TJ & CJ Land, Ltd.) (Gwin Road & Ingle Road)
No. of Lots: 22 Single Family
Flood Zone: X & AE
Number of Streetlights: N/A
Filling Stations:3
Drainage: Yes, Drainage will be provided by natural perculation and surface runoff will drain into Gwin Road and Ingle Roadside ditch.
ETJ: No, Rural Area
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: OSSF’S have been installed.
Paved: Yes, Ingle Road is paved and Gwin Road has been paved.
* Final Approval with a cash deposit in the amount of $10,950.00 for (3 Fire hydrants)

g. Villas San Miguel Subdivision- Pct. 1 (Juan A. San Miguel) (Mile 5 ½ West Road & Mile 10 North Road)
No. of Lots: 30 Single Family
Flood Zone: X
Number of Streetlights:9
Filling Stations:3
Drainage: Yes, Drainage will be provided by a storm sewer system and detention will be provided by a proposed drain ditch.
ETJ: Yes, City of Weslaco.
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: OSSF’S have been escrowed.
Paved: Yes, Mile 5 ½ West Road is paved and 4 internal streets have been paved.
* Final Approval with a cash deposit in the amount of $45,000.00 for (30 OSSF’S)

h. Ebony Winds Subdivision- Pct. 4 (Ebony Winds, LLC.) (Mile 22 ½ North Road & Brushline Road)
No. of Lots: 103 Single Family
Flood Zone: X
Number of Streetlights:25
Filling Stations:16
Drainage: Yes, Drainage will be provided by a storm sewer system and detention will be provided by a proposed drain ditch.
ETJ: No, Rural Area
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: OSSF’S have been installed.
Paved: Yes, Mile 22 ½ North Road is paved and 5 internal streets have been paved.
* Final Approval with a cash deposit in the amount of $55,895.00 for (Fire hydrants, street sign & regraded roadside ditch)

3. Final Approval
a. Trenton Ranch Subdivision- Pct. 4 (Cayetano Development, LLC.) (Trenton Road & Tower Road)
No. of Lots: 2 Single Family
Flood Zone: C
Number of Streetlights: N/A
Filling Stations: N/A
Drainage: Yes, Drainage will be provided by natural perculation and surface runoff will drain into Trenton Roadside ditch.
ETJ: No, Rural Area
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, provided by North Alamo Water Supply Corporation.
Paved: Yes, Trenton Road is paved.

BACKGROUND


Fiscal Impact

CALENDAR YEAR:
2024
ACCT. #:
FUNDS AVAILABLE Y/N?:
MATCHING FUNDS Y/N?:

BUDGETARY IMPACT:

No fiscal impact

Attachments

Form Review

Inbox Reviewed By Date
Budget and Management Veronica Ortiz 08/27/2024 02:45 PM
Final Approval Monica Salinas 08/30/2024 06:17 PM
Form Started By:
Flor Castillo
Started On:
08/27/2024 02:17 PM
Final Approval Date:
08/30/2024