1.  Coronado Energy E & P Company:
a. Two (2) four inch (4") or smaller SDR 7 Poly Pipelines, four (4) eight inch or smaller inch Schedule 80 steel pipeline, and one (1) three inch (3") Schedule 80 steel pipeline-Point of beginning being a point 825 feet easterly from the Hidalgo Starr County line, on the northern edge of the La Reforma county road right of way; thence southerly crossing La Reforma Road, a distance of approximately 50 feet to the southern edge of the road right of way for La Reforma Road and exiting the road right of way.

2.  North Alamo Water Supply:
a.  Approximately 500' going east from Valverde Rd on the south side of Roosevelt-Bore- Juan A. Perez; 
b.  Approximately 500' going west from Valverde Rd on the north side of Canton Rd- Maria DL Garcia; 
c.  Approximately 600' going east from Valverde Rd on the south side of Roosevelt- Bore- Luciano Izaguirre; 
d.  Approximately 500' going south from mile 11N on the east side of mile 4W- Bore- Maria C. Salaya;
e.  Border Breeze (41st SS/E "I" Rd)- Bore- Jorge Garcia- 3/4" service connection
f.  La Palma East 1/2 of Lot 12 B4 (8th St NS/E Woodlawn Ave)- 48' Line Ext. Leticia B. Lazo;
g.  SWC Mesquite/Bluebonnet Bore-Break Pavement line on middle of Rd- Noemi Rodriguez;
h.  Approximately 1400' going south from mile 10 1/2N to canal and 150' R.O.W. to drain ditch on the west side of Hutto Rd, need to cross canal and drain ditch-Line Ext. Big Valley Auto Auction (3/4" service connection)

BACKGROUND


Fiscal Impact

Attachments

Form Review

Inbox Reviewed By Date
Budget and Management Veronica Lopez 07/01/2008 12:59 PM
Auditor's Office lfong 07/02/2008 03:02 PM
Court Administrator Alejandro Garcia 07/02/2008 04:02 PM
Form Started By:
Saul Garcia
Started On:
06/30/2008 09:54 AM
Final Approval Date:
07/02/2008