Approval of Right of Way Permits:
1. Melden & Hunt, Inc.:
a). Crossing No.1: Contractor shall cross Cameron Road with an 8" water line approximately 47.50 feet west of the intersection of Cameron Road and Kenyon Road. The contractor shall bore across Cameron Road with a 16" x 48" P.V.C. casing for the 8" water line.
b). Crossing No.2: Contractor shall cross Davis Road with an 8" water line approximately 73.00 feet west of the intersection of Davis Road and Kenyon Road. The Contractor shall bore across Davis Road with a 16" x 48" P.V.C. casing for the 8" water line.
c). Crossing No.3: Contractor shall cross Kenyon Road with an 8" water line approximately 804.20 feet south of the intersection of Cameron Road and Kenyon Road. The contractor shall bore across Kenyon Road with a 16" x 48" P.V.C. casing for the 8" water line.
d). Crossing No.1: Contractor shall cross Kenyon Road with a 24" RCP Storm Drain line approximately 708.00 feet north of the intersection of Davis Road and Kenyon Road. The contractor shall open cut across Kenyon Road to install 24" R.C.P. storm drain line.
e). Crossing No. 2: Contractor shall cross Kenyon Road with an 18" RCP culvert approximately 25.00 feet north of Davis Road. The Contractor shall open cut across Kenyon Road to install the 18" culvert.
f). Crossing No. 1: Contractor shall cross Doolittle Road with a 15" P.V.C. sanitary sewer line approximately 25 feet south of the center of Cameron Road. The contractor shall bore across Doolittle Road with a 15" x 32 LF. P.V.C. The 15" sanitary sewer line shall continue running east approximately 1463.00 feet along the south right-of-way of Cameron Road.
g). Crossing No.2: Contractor shall cross Kenyon Road with a 15" sanitary sewer line approximately 317 feet south of the center of Cameron Road. The contractor shall open cut Kenyon Road and install the 15" sanitary sewer line.
2. TX Relay Transmission Networks, LLC: a 120' utility pole to be erected 422 linear feet west of intersection of Coconut Palm on Lilia Street, to be placed on the south side of ROW.
1. Melden & Hunt, Inc.:
a). Crossing No.1: Contractor shall cross Cameron Road with an 8" water line approximately 47.50 feet west of the intersection of Cameron Road and Kenyon Road. The contractor shall bore across Cameron Road with a 16" x 48" P.V.C. casing for the 8" water line.
b). Crossing No.2: Contractor shall cross Davis Road with an 8" water line approximately 73.00 feet west of the intersection of Davis Road and Kenyon Road. The Contractor shall bore across Davis Road with a 16" x 48" P.V.C. casing for the 8" water line.
c). Crossing No.3: Contractor shall cross Kenyon Road with an 8" water line approximately 804.20 feet south of the intersection of Cameron Road and Kenyon Road. The contractor shall bore across Kenyon Road with a 16" x 48" P.V.C. casing for the 8" water line.
d). Crossing No.1: Contractor shall cross Kenyon Road with a 24" RCP Storm Drain line approximately 708.00 feet north of the intersection of Davis Road and Kenyon Road. The contractor shall open cut across Kenyon Road to install 24" R.C.P. storm drain line.
e). Crossing No. 2: Contractor shall cross Kenyon Road with an 18" RCP culvert approximately 25.00 feet north of Davis Road. The Contractor shall open cut across Kenyon Road to install the 18" culvert.
f). Crossing No. 1: Contractor shall cross Doolittle Road with a 15" P.V.C. sanitary sewer line approximately 25 feet south of the center of Cameron Road. The contractor shall bore across Doolittle Road with a 15" x 32 LF. P.V.C. The 15" sanitary sewer line shall continue running east approximately 1463.00 feet along the south right-of-way of Cameron Road.
g). Crossing No.2: Contractor shall cross Kenyon Road with a 15" sanitary sewer line approximately 317 feet south of the center of Cameron Road. The contractor shall open cut Kenyon Road and install the 15" sanitary sewer line.
2. TX Relay Transmission Networks, LLC: a 120' utility pole to be erected 422 linear feet west of intersection of Coconut Palm on Lilia Street, to be placed on the south side of ROW.
BACKGROUND
Fiscal Impact
Attachments
Form Review
| Inbox | Reviewed By | Date |
|---|---|---|
| Budget and Management | Veronica Ortiz | 06/08/2016 02:10 PM |
| Final Approval | Monica Salinas | 06/10/2016 04:56 PM |
- Form Started By:
- Rebecca Gomez
- Started On:
- 06/07/2016 09:28 AM
- Final Approval Date:
- 06/10/2016