Skip to main content

AgendaQuick™

View Agenda Item

AI- 73757
Planning Department   14.A.
CC REGULAR AGENDA SPECIAL MTG
Meeting Date:
12/30/2019
Submitted For:
Flor Castillo
Submitted By:
Flor Castillo, PLANNING DEPT.
Department:
PLANNING DEPT.

Information

CAPTION

1. Preliminary Approval with Variance Request
a. Pedraza Estates Subdivision- Pct.3 (Rodolfo Pedraza) (Moorefield Road & Lucky “I” Street)
 No. of Lots: 2 Single Family
 Flood Zone: C
 Drainage: Yes, Drainage will be provided by regrading the road side ditch fronting the subdivision.
 ETJ: Yes, approved by the City of Mission.
 Water: Yes, provided by Sharyland Water Supply Corporation.
 Sewer: Yes, Sanitary Sewer provided by City of Mission.
 Paved: Yes, Moorefield Road and Lucky “I” Street are paved
 
b. Pueblo De Palmas Phase 24 Subdivision- Pct.4 (J.Gary Frisby) (Cesar Chavez Road & Mile 19 North Road)
 No. of Lots: 110 Single Family
 Estimated number of streetlights: 21
 Flood Zone: X
 Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by widening the existing drain ditch.
 ETJ: Yes, approved by the City of Edinburg.
 Water: Yes, provided by North Alamo Water Supply Corporation.
 Sewer: Yes, Sanitary Sewer provided by North Alamo Water Supply Corporation.
 Paved: Yes, Cesar Chavez Road and 5 internal streets to be paved.
 
2. Preliminary Approval
a. Villarreal Estates Subdivision- Pct. 3 (Francisca R. Villarreal) (Moorefield Road & Lucky “I” Street)
 No. of Lots: 2 Single Family
 Flood Zone: C
 Drainage: Yes, Drainage will be provided by regrading the road side ditch fronting the subdivision.
 ETJ: Yes, approved by the City of Mission.
 Water: Yes, provided by Sharyland Water Supply Corporation.
 Sewer: Yes, OSSF’s
 Paved: Yes, Moorefield Road and Lucky “I” Street are paved.
 
b. San Lucio No. 3 Subdivision- Pct. 1 (WSW Land Dev., Tillmin Welch) (Dillon Road & Trenton Road)
 No. of Lots: 14 Single Family
 Flood Zone: C
 Drainage: Yes, Drainage will be provided by regrading the road side ditch and discharging into existing drain ditch.
 ETJ: Yes, approved by the City of Donna.
 Water: Yes, provided by North Alamo Water Supply Corporation.
 Sewer: Yes, OSSF’s
 Paved: Yes, Dillon Road and Trenton Road are paved.
 
c. Sedona Estates Subdivision- Pct. 1 (Cayetano Development) (Sioux Road & Tower Road)
 No. of Lots: 135 Single Family
 Estimated number of streetlights: 16
 Flood Zone: B
 Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by widening the existing drain ditch.
 ETJ: Yes, approved by the City of Alamo.
 Water: Yes, provided by North Alamo Water Supply Corporation.
 Sewer: Yes, Sanitary Sewer provided by North Alamo Water Supply Corporation.
 Paved: Yes, Sioux Road is paved and 5 internals streets to be paved.
 
3. Final Approval
a. Del Rey Estates Unit 3 Subdivision- Pct. 4 (Kyndel W. Bennett) (Canton Road & Alamo Road)
 No. of Lots: 211 Single Family,23 Commercial
 Streetlights: 45
 Flood Zone: B
 Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by widening the existing drain ditch.
 ETJ: Yes, approved by the City of Edinburg.
 Water: Yes, provided by North Alamo Water Supply Corporation.
 Sewer: Yes, OSSF’s have been installed.
 Paved: Yes, Canton Road, Alamo Road and 7 internal streets are paved.
 
b. San Lucio No. 2 Subdivision- Pct. 1 (Tillmin Welch [Buena Tierra Holdings, LLC.]) (Trenton Road & Dillon Road)
 No. of Lots: 103 Single Family
 Streetlights: 21
 Flood Zone: C
 Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by widening the existing drain ditch.
 ETJ: Yes, approved by the City of Donna.
 Water: Yes, provided by North Alamo Water Supply Corporation.
 Sewer: Yes, OSSF’s have been installed.
 Paved: Yes, Trenton Road and 5 internal streets are paved.
 
4. Final Approval with Financial Guarantee
a. Midway Country Estates Subdivision- Pct. 1 (La Cuesta Del Sol Dev., LTD.) (Mile 10 North Road & Mile 6 ½ West Road)
 No. of Lots: 44 Single Family
 Streetlights: 14
 Flood Zone:X
 Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by widening the existing drain ditch.
 ETJ: Yes, approved by the City of Weslaco.
 Water: Yes, provided by North Alamo Water Supply Corporation.
 Sewer: Yes, OSSF’s have been escrowed.
 *Final Approval with Letter of Credit No. 101188694-1 in the amount of $72,380.00 for 44 OSSF’s.
Paved: Yes, Mile 10 North Road and 3 internal streets are paved.

BACKGROUND


Fiscal Impact

Attachments

Form Review

Inbox Reviewed By Date
Budget and Management Veronica Ortiz 12/20/2019 12:45 PM
Final Approval Monica Salinas 12/26/2019 05:06 PM
Form Started By:
Flor Castillo
Started On:
12/20/2019 11:19 AM
Final Approval Date:
12/26/2019