CAPTION

1. PIPELINE AND UTILITY PERMITS
a. Applicant: RWE Renewables Americas, LLC.
 Location of Pipeline Crossings: 4 crossings in Pct. 1; (2) for County Road 1901, (1) for County Road 3305 (Jaritas Road) and (1) for County Road 3304 (Bamer Lane).
 Proposed improvements within Right-of-Way: Consists of Four 35 KV collection cable within a 2” Pipe casing bore crossing the above mentioned County Roads.
 
b. Applicant: Spectrum (Broadband Telecom Services Project No. 1831551)
 Proposed location of Power Supply Pole:  North side of Benito Ramirez Road approximately 50.00 feet west of Vista Del Cielo Road. (Pct. 4)
 
c. Applicant: Spectrum (Broadband Telecom Services Project No. 1564945)
 Proposed location of Power Supply Pole:  West side of Western Road approximately 200.00 feet north of Coco Drive. (Pct. 3)
 
d. Applicant: Spectrum (Broadband Telecom Services Project No. 1831558)
 Proposed location of Power Supply Pole:  South side of Valdez Road approximately 40.00 feet east of Calle De Monte. (Pct. 1)
 
e. Applicant: Spectrum (Broadband Telecom Services Project No. 568648)
 Proposed location of Power Supply Pole:  West side of San Pedro Road approximately 270.00 feet south of Mile 14 North Road.
(Pct. 1)
 
f. Applicant: North Alamo Water Supply Corporation
 Legal Description: 10.063 Tract of land out of Lot 16 Blk. 4 RB Curry Subdivision (Pct. 4) (Dillon Road and Curve Road)
 Location of Pipeline or Utilities: Existing 4” water line north of Curve Road.
 Proposed improvement within Right-of-Way: One 4” PVC water line extension of approximate 1,056.00 feet along the north side of Curry Road.
 
g. Applicant: North Alamo Water Supply Corporation
 Legal Description: 9.17 Acres portion out of Lot 8 Block 51 Alamo Land & Sugar Co. Subdivision; Proposed The Estates at Paloma Park Subdivision (Pct. 4) (Raul Longoria Road and Alberta Road)
 Location of Pipeline or Utilities: Existing 8” water line south of Alberta Road.
 Proposed improvement within Right-of-Way: One 8” PVC water line with a 16” PVC casing boring Alberta Road.

BACKGROUND


Fiscal Impact

Attachments

Form Review

Inbox Reviewed By Date
Budget and Management Veronica Ortiz 03/24/2020 02:56 PM
Final Approval Monica Salinas 04/03/2020 05:27 PM
Form Started By:
Flor Castillo
Started On:
03/20/2020 04:56 PM
Final Approval Date:
04/03/2020