CAPTION

1. PIPELINE AND UTILITY PERMITS 
a. Applicant: North Alamo Water Supply Corporation
 Legal Description: 13.31acre tract out of Lot 16 Block 97 Mo-Tex Subdivision (Pct. 4) (Norene Road & F.M. 1925)
 Location of Pipeline or Utilities: Existing 4” water line west of Norene Road.
 Proposed improvement within Right-of-Way: One 4” water line extension running north approximately 340 feet along the west ROW line of Norene Road.
 
b. Applicant: North Alamo Water Supply Corporation
 Legal Description: 10 acre tract of land being all of Lot 33 Delta Orchards Co. Unit 1Subdivision (Pct. 4)
(Mile 21 North Road & Valverde Road) 
 Location of Pipeline or Utilities: Existing 6” water line north of Mile 21 North Road.
 Proposed improvement within Right-of-Way: One 6” water line with a 16” PVC casing boring Mile 21 North Road.
 
c. Applicant: North Alamo Water Supply Corporation
 Legal Description: 10 acre tract of land being the west 10 acres of block 21 Hill Halbert Subdivision (Pct. 1)
(Anderson Road & Dillon Road)
 Location of Pipeline or Utilities: Existing 2” water line north of Anderson Road.
 Proposed improvement within Right-of-Way: One 3/4” water service line and One 1” dual water service line with a 2” PVC casing boring Anderson Road.
 
d. Applicant: Sharyland Water Supply Corporation
 Legal Description:  A tract of land out of lot 52-3 West Addition to Sharyland Subdivision (Pct. 3) (8 Mile Line Road & Los Ebanos Road)
 Location of Pipeline or Utilities: Existing 6” water line west of Los Ebanos Road.
 Proposed improvement within Right-of-Way: One 1” water service line with a 2” PVC casing boring Los Ebanos Road.
 
e. Applicant: Agua SUD
 Legal Description:  A 67.97 acre tract of land out of Block 16, Texan Gardens Subdivision (Proposed Carrizales Subdivision) (Pct. 3) (Western Road & 6 Mile Line Road)
 Location of Pipeline or Utilities: Existing 8” water line west of Western Road.
 Proposed improvement within Right-of-Way: Two 8” water lines with a 16” steel casing boring Western Road.
 
f. Applicant: Spectrum (Project# 1813495 PMK7) Proposed location of Power Supply Pole installation:  North of Wisconsin Road approximately 300 feet east of Cesar Chavez Road. (Pct. 4)

g. Applicant: Spectrum (Project# 1867040 SMZM) AKA RGV Basham Phase 42-B Proposed location of Power Supply Pole installation:  East of Bentsen Palm Drive approximately 260 feet south of Astrid Street. (Pct. 3)
 
h. Applicant: Spectrum (Project# 1867040 SMZN) AKA RGV Basham Phase 42-A Proposed location of Power Supply Pole installation:  East of Bentsen Palm Drive approximately 125 feet south of Tierra Alta Drive. (Pct. 3)
 
i. Applicant: Spectrum (Project# 1819027EM109)  Proposed location of Power Supply Pole installation:  West of Tower Road approximately 150feet north of Benito Ramirez Road. (Pct. 4)
 
j. Applicant: Spectrum (Project# 1921637WEQ4)  Proposed location of Power Supply Pole installation:  South of Curry Road approximately 80feet west of La Quinta Lane. (Pct. 4)
 
k. Applicant: Texas Gas Service (Line 173DD-3 Emergency Valve installation 6” Pipeline)
 Proposed improvement within Right-of-Way: One 6” coated steel pipe improvement along the east ROW of East Goodwin Road approximately 100 feet south of F.M. 1924.
 
l. Applicant: Fiberlight (Segment # CC01295C) Proposed location of Fiber Optic Cable:(2) 1 ¼”  HDPE SDR-11 Conduits line extension of approximately 5,833’ south of Business Hwy 83 along the east side of Cesar Chavez Road.
 
m. Applicant: Valley Telephone Proposed location of Fiber Optic Cable:(2) 1.25” HDPE Conduits line extension of approximately 15,700’ along the west ROW of Puerto Rico Road.

BACKGROUND


Fiscal Impact

Attachments

Form Review

Inbox Reviewed By Date
Budget and Management Veronica Ortiz 08/19/2020 05:02 PM
Final Approval Monica Salinas 08/21/2020 05:48 PM
Form Started By:
Flor Castillo
Started On:
08/19/2020 04:36 PM
Final Approval Date:
08/21/2020