Skip to main content

AgendaQuick™

View Agenda Item

AI- 79929
Planning Department   6.D.
CC CONSENT AGENDA SPECIAL MTG
Meeting Date:
03/16/2021
Submitted For:
Flor Castillo
Submitted By:
Flor Castillo, PLANNING DEPT.
Department:
PLANNING DEPT.

Information

CAPTION

1. PIPELINE AND UTILITY PERMITS 
a. Applicant: North Alamo Water Supply Corporation
 Legal Description: 10.00 acres being the east 10 acres of lot 1 blk. 95 JC Engleman Jr. Subdivision Section 95
(Mile 19 North Road & Mile 7 West Road) (Pct. 1)
 Location of Pipeline or Utilities: Existing 8” waterline north of Mile 19 North Road.
 Proposed improvement within Right-of-Way: One 3/4” water service line with a 2” PVC casing boring Mile 19 North Road.
 
b. Applicant: North Alamo Water Supply Corporation
 Legal Description: 28.12 acres out of Blk. 150 and 151 la Blanca Agricultural Subdivision; Proposed Blanquita Estates #2 Subdivision (Canton Road & FM 493) (Pct. 1)
 Location of Pipeline or Utilities: Existing 8” waterline south of Canton Road.
 Proposed improvement within Right-of-Way: Two 8” PVC water lines with a 16” PVC casing boring Canton Road.
 
c. Applicant: North Alamo Water Supply Corporation
 Legal Description: 10.00 acre tract of land out lot 4 blk. 96 Missouri Texas Land & Irrig. Co. Subdivision
(Mile 19 North Road & Engleman Road) (Pct. 4)
 Location of Pipeline or Utilities: Existing 8” waterline north of Mile 19 North Road.
 Proposed improvement within Right-of-Way: One 3/4” water service line with a 2” PVC casing boring Mile 19 North Road.
 
d. Applicant: North Alamo Water Supply Corporation
 Legal Description: The east ½ of the west ½ of Lot 1 Blk. 97 Missouri Texas Land & Irrig. Co. Subdivision
(Mile 19 North Road & Mile 5 ½ West Road) (Pct. 1)
 Location of Pipeline or Utilities: Existing 2.5” waterline north of Mile 19 North Road.
 Proposed improvement within Right-of-Way: One 3/4” water service line with a 2” PVC casing boring Mile 19 North Road.
 
e. Applicant: North Alamo Water Supply Corporation
 Legal Description: All of Farm tract 267 containing 30 acres out of West Tract Subdivision of Llano Grande Grant
(Mile 4 West Road & Mile 12 North Road) (Pct. 1)
 Location of Pipeline or Utilities: Existing 4” waterline west of Mile 4 West Road.
 Proposed improvement within Right-of-Way: One 3/4” water service line with a 2” PVC casing boring Mile 4 West Road.
 
f. Applicant: North Alamo Water Supply Corporation
 Legal Description: 1.25 acres out of Lot 4 The Highlands Subdivision (Mile 4 West Road & Mile 12 North Road) (Pct. 1)
 Location of Pipeline or Utilities: Existing 4” waterline west of Mile 4 West Road.
 Proposed improvement within Right-of-Way: One 3/4” water service line with a 2” PVC casing boring Mile 4 West Road.
 
g. Applicant: North Alamo Water Supply Corporation
 Legal Description: Tract 3-10.00 acre tract of land out lot 6 blk. 93 out of Missouri Texas Land & Irrig. Co.
(Uresti Road & Mile 19 North Road) (Pct. 4) 
 Location of Pipeline or Utilities: Existing 6” waterline east of Uresti Road.
 Proposed improvement within Right-of-Way: One 3/4” water service line with a 2” PVC casing boring Uresti Road.
 
h. Applicant: North Alamo Water Supply Corporation
 Legal Description: Lot 14 Blk. 25 Santa Cruz Gardens Unit 2 Subdivision (Benito Ramirez Road & Terry Road) (Pct. 4)
 Location of Pipeline or Utilities: Existing 8” waterline south of Benito Ramirez Road.
 Proposed improvement within Right-of-Way: One 3/4” water service line with a 2” PVC casing boring Benito Ramirez Road.
 
i. Applicant: Agua Special Utility District
 Legal Description: Lot 11 and 12 out of Blk 4 Texas Gardens Subdivision (Iowa Road & 4 Mile Line) (Pct.3)
 Location of Pipeline or Utilities: Existing 8” waterline east of Iowa Road.
 Proposed improvement within Right-of-Way: One 2” water service line with a 4” PVC casing boring Iowa Road.
 
j. Applicant: Sharyland Water Supply Corporation
 Legal Description: 2.24  acres out of lot 178 Bentsen Groves & Irrigation TR
 Location of Pipeline or Utilities: Existing 8” waterline east of Bentsen Palm Drive.
 Proposed improvement within Right-of-Way: One 1” water service line with a 2” PVC casing boring Bentsen Palm Drive.

k. Applicant: Spectrum (Project# 2443486 WMB9)
 Proposed location of Power Supply Pole installation:  North side of Mile 12 ½ North Road aproximately 400.00’ west of FM 491 (Pct. 1)

l. Applicant: VTX1 Company
Proposed location of Fiber Optic Cable:  Starting at the northeast corner of Cesar Chavez Road and Alberta Road a (1) 1 ¼” HDPE SDR-11 Conduits will be extended east approximate 500.00 feet along the north side of Alberta Road. (Pct. 4)

BACKGROUND


Fiscal Impact

Attachments

Form Review

Inbox Reviewed By Date
Budget and Management Veronica Ortiz 03/10/2021 03:44 PM
Final Approval Monica Salinas 03/12/2021 05:21 PM
Form Started By:
Flor Castillo
Started On:
03/10/2021 02:01 PM
Final Approval Date:
03/12/2021