AI- 93544
Planning Department 6.D.
CC CONSENT AGENDA SPECIAL MTG
- Meeting Date:
- 12/12/2023
- Submitted For:
- Flor Castillo
- Submitted By:
- Flor Castillo
- Department:
- PLANNING DEPT.
Information
CAPTION
1. PIPELINE AND UTILITY PERMIT
a. Applicant: North Alamo Water Supply Corporation
Legal Description: A 33.13 acres out of tract 156 San Salvador Del Tule Grant Proposed: Carmen Avila Phase 5 Subdivision (Carmen Avila Road & Mile 22 ½ North Road) (Pct. 4)
Location of Pipeline or Utilities: Existing 10” waterline west of Carmen Avila Road.
Proposed improvement within Right-of-Way: One 8” water line with a 16” PVC casing boring Carmen Avila Road and 4-1” single service line with a 2” PVC casing boring Carmen Avila Road
b. Applicant: North Alamo Water Supply Corporation
Legal Description: 5.00 acres out of the south 10.00 of the east 20.00 of lot 8 RB Curry Survey #3 Subdivision (Valverde Road & Curry Road) (Pct. 4)
Location of Pipeline or Utilities: Existing 2” waterline south of Curry Road.
Proposed improvement within Right-of-Way: One 3/4” water service with a 2” PVC casing boring Curry Road.
c. Applicant: North Alamo Water Supply Corporation
Legal Description: The east ½ of lot 10 Victoria Acres No. 1 Subdivision (Victoria Road & Castillo Street) (Pct. 1)
Location of Pipeline or Utilities: Existing 4” waterline north of Castillo Road.
Proposed improvement within Right-of-Way: One 3/4” water service with a 2” PVC casing boring Castillo Street.
d. Applicant: Agua SUD
Legal Description: 21.48 Acres out of lots 18 & 19 Blk. 6 Texan Gardens Subdivision; Proposed: El Crucero Phase 3 Subdivision (Texan Road & Mile 5 Road) (Pct. 3)
Location of Pipeline or Utilities: Existing 12” waterline north of Mile 5 Road.
proposed improvement within Right-of-Way: One 1” water service line with a 2” PVC casing, eight 2” water service lines with a 3” PVC casing, two 6” PVC waterline with a 12” steel casing, and one 8” PVC waterline with a 16” steel casing boring Mile 5 Road and Texan Road.
e. Applicant: Spectrum (Project No. 3916108-WE32E)
Proposed location of Power Supply Pole:South of Mile 9 North Road approximately 130 feet west of Mile 2 ½ East Road. (Pct. 1)
f. Applicant: Housley Group FTR# 53140918
Proposed improvement within Right-of-Way: Bore Crossing and one 2” conduit fiber optic line being installed along Mile 6 West Road, Mile 14 North Road, San Pedro Street, San Vicente Norte Street, San Vicente Sur Street, San Ignacio Street for El Obispado Subdivision
g. Applicant: Housley Group FTR# 5314110
Proposed improvement within Right-of-Way: Bore Crossing and one 2” conduit fiber optic line being installed along A Street through E Street, Ida Street, Melissa Street, Dora Street, Rosa Street, Sylvia Street, Minerva Street, Joe Olivarez Street, Ramiro Guerra Street, and Raul Gonzalez Street for Sunrise Development. Bore Crossing and one 2” conduit fiber optic line are being installed along Lico Drive, Mile 3 ½ West Road for Olivarez #10 Subdivision.
h. Applicant: Housley Group FTR# 5314112
Proposed improvement within Right-of-Way: Bore Crossing and one 2” conduit fiber optic line being installed along Tajiri Drive, Samoa Drive for Tropical Farms Unit #1 Subdivision. Bore Crossing and one 2” conduit fiber optic line being installed along Mile 11 North Road and La Quinta Lane for la Quinta Estates Subdivision. Bore Crossing and one 2” conduit fiber optic line are being installed along Mile 11 North Road, Ceniza Drive for Ash Country Estates Subdivision. Bore Crossing and one 2” conduit fiber optic line are being installed along Walter Wagers Street for MCKee #1 Subdivision. Bore Crossing and one 2” conduit fiber optic line are being installed along the south side of Mile 11 North Road approximately ¼ west of F.M. 88.
i. Applicant: Housley Group FTR# 5314115
Proposed improvement within Right-of-Way: Bore Crossing and one 2” conduit fiber optic line being installed along Mile 10 North Road, Roper Drive, Toro Avenue, Saddle Street, Vaquero Drive, Darlene Avenue for San Jacinto Estates No. 7 Subdivision. Bore Crossing and one 2” conduit fiber optic line being installed along Mile 14 ½ West Road, Iris Avenue, Rachel Avenue, Charlotte Avenue for Wes-Tex Phase 2 Subdivision. Bore Crossing and one 2” conduit fiber optic line being installed along the south of Mile 10 North Road approximately ¼ west of Mile 4 ½ West Road for Wes-Tex Phase 1 Subdivision. Bore Crossing and one 2” conduit fiber optic line are being installed along Mile 10 North Road, RJ Johns Street for Vicente Hernandez Subdivision. Bore Crossing and one 2” conduit fiber optic line are being installed along Mile 4 ½ West Road, Aurora Drive for Aurora Estates Subdivision. Bore Crossing and one 2” conduit fiber optic line being installed along Mile 4 ½ West Road, Alma Avenue, Carol Avenue, Evelyn Avenue, Lucille Avenue for Midvalley Estates Subdivision. Bore Crossing and one 2” conduit fiber optic line being installed along Mile 4 ½ West Road, Rancho Viejo Street, Nobac Service Road for West Tract Subdivision. Bore Crossing and one 2” conduit fiber optic line are being installed along Mile 4 ½ West Road, JP Garza Street for the West Tract Subdivision.
j. Applicant: Housley Group FTR# 5314119
Proposed improvement within Right-of-Way: Bore Crossing and one 2” conduit fiber optic line being installed along Mile 6 ½ West Road, Daisy Drive for Sunflower Subdivision. Bore Crossing and one 2” conduit fiber optic line being installed along Mile 8 ½ North Road, Ricardo Street, Tower Street, Viceroy Drive for Martin Subdivision and Flora Subdivision. Bore Crossing and one 2” conduit fiber optic line are being installed along Mile 8 ½ North Road, Mariposa Drive, Viceroy Drive, Birdwings Street, Monarch Street, Swallow Street for the Mariposa Subdivision. Bore Crossing and one 2” conduit fiber optic line are being installed along Mile 8 ½ North Road, Mile 6 ½ West Road, North Lane, and South Lane for High Point Phase 1, Phase 2, and Perlita Subdivision.
k. Applicant: Housley Group FTR# 5314168
Proposed improvement within Right-of-Way: Bore Crossing and one 2” conduit fiber optic line being installed along the north side of Mile 5 North Road approximately ¼ mile east of Border Avenue. Bore Crossing and one 2” conduit fiber optic line being installed along the east side of Border Avenue approximately ½ mile north of Mile 5 North Road.
l. Applicant: Housley Group FTR# 5314169
Proposed improvement within Right-of-Way: Bore Crossing and one 2” conduit fiber optic line being installed along Mile 5 ½ North Road, Midway Road for Midway Subdivision. Bore Crossing and one 2” conduit fiber optic line being installed along Midway Road, Ponciano Drive, Lott Road, Rio Del Carmen road, Turquesa Street, Apatita Street, Topacio Street, Aguamarina Street, Perla Street, Amatista Street for Maravillas Estates Phase 1, Phase 2 and Phase 3 Subdivisions. Bore Crossing and one 2” conduit fiber optic line are being installed along Midway Road, Llaves Street, Chiston Street, Don Bruno Street, Campana Street for La Loma Alta Subdivision. Bore Crossing and one 2” conduit fiber optic line being installed along the west side of Milanos Road approximately 600.00 feet north of 18th Street and ½ mile south of 18th street.
a. Applicant: North Alamo Water Supply Corporation
Legal Description: A 33.13 acres out of tract 156 San Salvador Del Tule Grant Proposed: Carmen Avila Phase 5 Subdivision (Carmen Avila Road & Mile 22 ½ North Road) (Pct. 4)
Location of Pipeline or Utilities: Existing 10” waterline west of Carmen Avila Road.
Proposed improvement within Right-of-Way: One 8” water line with a 16” PVC casing boring Carmen Avila Road and 4-1” single service line with a 2” PVC casing boring Carmen Avila Road
b. Applicant: North Alamo Water Supply Corporation
Legal Description: 5.00 acres out of the south 10.00 of the east 20.00 of lot 8 RB Curry Survey #3 Subdivision (Valverde Road & Curry Road) (Pct. 4)
Location of Pipeline or Utilities: Existing 2” waterline south of Curry Road.
Proposed improvement within Right-of-Way: One 3/4” water service with a 2” PVC casing boring Curry Road.
c. Applicant: North Alamo Water Supply Corporation
Legal Description: The east ½ of lot 10 Victoria Acres No. 1 Subdivision (Victoria Road & Castillo Street) (Pct. 1)
Location of Pipeline or Utilities: Existing 4” waterline north of Castillo Road.
Proposed improvement within Right-of-Way: One 3/4” water service with a 2” PVC casing boring Castillo Street.
d. Applicant: Agua SUD
Legal Description: 21.48 Acres out of lots 18 & 19 Blk. 6 Texan Gardens Subdivision; Proposed: El Crucero Phase 3 Subdivision (Texan Road & Mile 5 Road) (Pct. 3)
Location of Pipeline or Utilities: Existing 12” waterline north of Mile 5 Road.
proposed improvement within Right-of-Way: One 1” water service line with a 2” PVC casing, eight 2” water service lines with a 3” PVC casing, two 6” PVC waterline with a 12” steel casing, and one 8” PVC waterline with a 16” steel casing boring Mile 5 Road and Texan Road.
e. Applicant: Spectrum (Project No. 3916108-WE32E)
Proposed location of Power Supply Pole:South of Mile 9 North Road approximately 130 feet west of Mile 2 ½ East Road. (Pct. 1)
f. Applicant: Housley Group FTR# 53140918
Proposed improvement within Right-of-Way: Bore Crossing and one 2” conduit fiber optic line being installed along Mile 6 West Road, Mile 14 North Road, San Pedro Street, San Vicente Norte Street, San Vicente Sur Street, San Ignacio Street for El Obispado Subdivision
g. Applicant: Housley Group FTR# 5314110
Proposed improvement within Right-of-Way: Bore Crossing and one 2” conduit fiber optic line being installed along A Street through E Street, Ida Street, Melissa Street, Dora Street, Rosa Street, Sylvia Street, Minerva Street, Joe Olivarez Street, Ramiro Guerra Street, and Raul Gonzalez Street for Sunrise Development. Bore Crossing and one 2” conduit fiber optic line are being installed along Lico Drive, Mile 3 ½ West Road for Olivarez #10 Subdivision.
h. Applicant: Housley Group FTR# 5314112
Proposed improvement within Right-of-Way: Bore Crossing and one 2” conduit fiber optic line being installed along Tajiri Drive, Samoa Drive for Tropical Farms Unit #1 Subdivision. Bore Crossing and one 2” conduit fiber optic line being installed along Mile 11 North Road and La Quinta Lane for la Quinta Estates Subdivision. Bore Crossing and one 2” conduit fiber optic line are being installed along Mile 11 North Road, Ceniza Drive for Ash Country Estates Subdivision. Bore Crossing and one 2” conduit fiber optic line are being installed along Walter Wagers Street for MCKee #1 Subdivision. Bore Crossing and one 2” conduit fiber optic line are being installed along the south side of Mile 11 North Road approximately ¼ west of F.M. 88.
i. Applicant: Housley Group FTR# 5314115
Proposed improvement within Right-of-Way: Bore Crossing and one 2” conduit fiber optic line being installed along Mile 10 North Road, Roper Drive, Toro Avenue, Saddle Street, Vaquero Drive, Darlene Avenue for San Jacinto Estates No. 7 Subdivision. Bore Crossing and one 2” conduit fiber optic line being installed along Mile 14 ½ West Road, Iris Avenue, Rachel Avenue, Charlotte Avenue for Wes-Tex Phase 2 Subdivision. Bore Crossing and one 2” conduit fiber optic line being installed along the south of Mile 10 North Road approximately ¼ west of Mile 4 ½ West Road for Wes-Tex Phase 1 Subdivision. Bore Crossing and one 2” conduit fiber optic line are being installed along Mile 10 North Road, RJ Johns Street for Vicente Hernandez Subdivision. Bore Crossing and one 2” conduit fiber optic line are being installed along Mile 4 ½ West Road, Aurora Drive for Aurora Estates Subdivision. Bore Crossing and one 2” conduit fiber optic line being installed along Mile 4 ½ West Road, Alma Avenue, Carol Avenue, Evelyn Avenue, Lucille Avenue for Midvalley Estates Subdivision. Bore Crossing and one 2” conduit fiber optic line being installed along Mile 4 ½ West Road, Rancho Viejo Street, Nobac Service Road for West Tract Subdivision. Bore Crossing and one 2” conduit fiber optic line are being installed along Mile 4 ½ West Road, JP Garza Street for the West Tract Subdivision.
j. Applicant: Housley Group FTR# 5314119
Proposed improvement within Right-of-Way: Bore Crossing and one 2” conduit fiber optic line being installed along Mile 6 ½ West Road, Daisy Drive for Sunflower Subdivision. Bore Crossing and one 2” conduit fiber optic line being installed along Mile 8 ½ North Road, Ricardo Street, Tower Street, Viceroy Drive for Martin Subdivision and Flora Subdivision. Bore Crossing and one 2” conduit fiber optic line are being installed along Mile 8 ½ North Road, Mariposa Drive, Viceroy Drive, Birdwings Street, Monarch Street, Swallow Street for the Mariposa Subdivision. Bore Crossing and one 2” conduit fiber optic line are being installed along Mile 8 ½ North Road, Mile 6 ½ West Road, North Lane, and South Lane for High Point Phase 1, Phase 2, and Perlita Subdivision.
k. Applicant: Housley Group FTR# 5314168
Proposed improvement within Right-of-Way: Bore Crossing and one 2” conduit fiber optic line being installed along the north side of Mile 5 North Road approximately ¼ mile east of Border Avenue. Bore Crossing and one 2” conduit fiber optic line being installed along the east side of Border Avenue approximately ½ mile north of Mile 5 North Road.
l. Applicant: Housley Group FTR# 5314169
Proposed improvement within Right-of-Way: Bore Crossing and one 2” conduit fiber optic line being installed along Mile 5 ½ North Road, Midway Road for Midway Subdivision. Bore Crossing and one 2” conduit fiber optic line being installed along Midway Road, Ponciano Drive, Lott Road, Rio Del Carmen road, Turquesa Street, Apatita Street, Topacio Street, Aguamarina Street, Perla Street, Amatista Street for Maravillas Estates Phase 1, Phase 2 and Phase 3 Subdivisions. Bore Crossing and one 2” conduit fiber optic line are being installed along Midway Road, Llaves Street, Chiston Street, Don Bruno Street, Campana Street for La Loma Alta Subdivision. Bore Crossing and one 2” conduit fiber optic line being installed along the west side of Milanos Road approximately 600.00 feet north of 18th Street and ½ mile south of 18th street.
BACKGROUND
Fiscal Impact
Attachments
- 1-CARMEN AVILA 5
- 2-JUAN F ENRIQUEZ
- 3-OYUKI M CANO
- 4-El Crucero III
- 5-3916108-WE32E
- 6-5314098-Housley Group
- 7-5314110-Housley Group
- 8-5314112-Housley Group
- 9-5314115-Housley Group
- 10-5314119-Housley Group
- 11-5314168-Housley Group
- 12-5314169-Housley Group
Form Review
| Inbox | Reviewed By | Date |
|---|---|---|
| Budget and Management | Veronica Ortiz | 12/08/2023 08:25 AM |
| Final Approval | Monica Salinas | 12/08/2023 05:34 PM |
- Form Started By:
- Flor Castillo
- Started On:
- 12/07/2023 04:57 PM
- Final Approval Date:
- 12/08/2023