Skip to main content

AgendaQuick™

View Agenda Item

AI- 100270
Planning Department   3.C.
CC CONSENT AGENDA SPECIAL MTG
Meeting Date:
08/05/2025
Submitted For:
Flor Castillo
Submitted By:
Flor Castillo
Department:
PLANNING DEPT.

Information

CAPTION

1. PIPELINE PERMITS
a. Applicant: North Alamo Supply Corporation
Legal Description:  The West 165 feet of block 157 La Blanca B Subdivision (F.M. 493 & Mile 15 North Road) (Pct. 1)
Location of Pipeline or Utilities: Existing 4” waterline north of Mile 15 North Road.
Proposed improvement within Right-of-Way: One 3/4” water service line with a 2” PVC casing boring Mile 15 North Road. 

 b. Applicant: North Alamo Supply Corporation
Legal Description:  .36 acres out of Lot 29 Delta Orchards Co. Unit #1 (Valverde Road & Benito Ramirez Road) (Pct. 4)
Location of Pipeline or Utilities: Existing 4” waterline north of Benito Ramirez Road.
Proposed improvement within Right-of-Way: One 3/4” water service line with a 2” PVC casing boring Benito Ramirez Road. 

c. Applicant: North Alamo Supply Corporation
Legal Description:  Lots 7 & 10 Blk. 87 Mo-Tex land & Irrigation co. (Engleman Road & Mile 20 North Road) (Pct. 4)
Location of Pipeline or Utilities: Existing 2” waterline west of Engleman Road.
Proposed improvement within Right-of-Way: One 3/4” water service line with a 2” PVC casing boring on Engleman Road. 

d. Applicant: North Alamo Supply Corporation
Legal Description:  Farm tract 3028 Capisallo District Subdivision Proposed Baseline Acres #2 Subdivision (Baseline Road & Mile 11 ½ North Road) (Pct. 1)
Location of Pipeline or Utilities: Existing 6” waterline west of Baseline Road.
Proposed improvement within Right-of-Way: One 8” waterline running west approximately 500 feet along the north side of Mile 11 ½ North Road.

e. Applicant: North Alamo Supply Corporation
Legal Description:  Lot 4 Hill Halbert Tract Proposed Lavenia Crossing Subdivision (Dillon Road & Mile 15 North Road) (Pct. 4)
Location of Pipeline or Utilities: Existing 8” waterline, southeast corner of Dillon Road and Mile 15 North Road.
Proposed improvement within Right-of-Way:
One 8” water line with a 16” PVC casing boring Dillon Road.
One 8” water line with a 16” PVC casing boring Mile 15 North Road.
One 8” water line with a 16” PVC casing boring Curve Road.

f. Applicant: JJ Directional Drilling LLC.- Jesus Rodriguez
Legal Description: 11.39-acre tract 99 out of Del Tule & Irrigation District Subdivision(FM 3250 & Floral Road) (Pct. 4)
Location of Pipeline or Utilities: Existing 8” waterline north of Floral Road.
Proposed improvement within Right-of-Way: One 1” water service line with a 2” PVC casing boring Floral Road. 

g. Applicant: Vexus Fiber MSSN.05.0010-1 –Pct. 3
Proposed improvement within Right-of-Way:
A new fiber optic cable measuring 1 ½” is to be installed along Dallas Circle, Luci Drive, Pam Drive, Sue Ellen Drive, and Ellis Drive on South Fork Subdivision.
A new fiber optic cable measuring 1 ½” is to be installed along Austin Circle on Basham #30 Subdivision.
A new fiber optic cable measuring 1 ½” is to be installed along Seitz Road on Nick Doffing Subdivision No. 1.
A new fiber optic cable measuring 1 ½” is to be installed along Amber Street on Brittany Subdivision.
A new fiber optic cable measuring 1 ½” is to be installed along Norma Drive, Jade Drive, Ruby Drive, and Diamond Drive on Mesquite View Subdivision.
A new fiber optic cable measuring 1 ½” is to be installed along Vanessa Drive on Acevedo No. 10 Subdivision.
A new fiber optic cable measuring 1 ½” is to be installed along Myra Drive on Basham No. 42 Subdivision.
A new fiber optic cable measuring 1 ½” is to be installed along the west side of Doffing Road, approximately ¼ north of Mile 7 North Road.

h. Applicant: Vexus Fiber MSSN.05.019-2 –Pct. 3
Proposed improvement within Right-of-Way:
A new fiber optic cable measuring 1 ½” is to be installed along Valencia Avenue, Ken Street, Margaret Drive, Valencia Avenue, and Delissa Drive on Basham No. 4 Subdivision and Kenwood Estates Subdivision.
A new fiber optic cable measuring 1 ½” is to be installed along Limon Drive, California Street, Lima Lane, and Naranja Drive on La Homa Groves Unit 3 Subdivision & 5 Mile Heights Subdivision.
A new fiber optic cable measuring 1 ½” is to be installed along Regina Drive and Justin Street on Regina Terrace Subdivision.
A new fiber optic cable measuring 1 ½” is to be installed along Barney Grove Drive and Justin Street on Barney Groves Subdivision.

BACKGROUND


Fiscal Impact

Attachments

Form Review

Inbox Reviewed By Date
Budget and Management Veronica Ortiz 07/31/2025 09:26 AM
Budget and Management Veronica Ortiz 07/31/2025 09:26 AM
Final Approval Monica Salinas 08/01/2025 05:10 PM
Form Started By:
Flor Castillo
Started On:
07/30/2025 04:26 PM
Final Approval Date:
08/01/2025