1. Preliminary Approval
a. E. Maldonado Subdivision - Pct. 1 (Eliberto Maldonado) (Sunflower Road & S.H. 107)
No. of Lots: 1 Single-Family, 1 Commercial
Flood Zone:AH
Estimated Number of Streetlights:N/A
Filling Stations:1
Drainage: Yes, Drainage will be provided by natural perculation and surface runoff will drain into Sunflower Road side ditch.
ETJ: Yes, City of Donna.
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, OSSF’S.
Paved: Yes, S.H. 107 and Sunflower Road are paved.

b. Nopales Estates Subdivision - Pct. 4 (Jesus Cordero) (Benito Ramirez Road & F.M. 2812)
No. of Lots: 4 Single-Family, 1 Commercial
Flood Zone:X
Estimated Number of Streetlights:N/A
Filling Stations:1
Drainage: Yes, Drainage will be provided by natural perculation and surface runoff will drain into the natural low area of the property.
ETJ: Yes, City of Edinburg.
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, OSSF’S.
Paved: Yes, Benito Ramirez Road is paved.

c. Del Monte Subdivision - Pct. 1 (Guadalupe Montelongo) (Mile 19 North Road & Sunflower Road)
No. of Lots: 6 Single-Family
Flood Zone:AE
Estimated Number of Streetlights:N/A
Filling Stations:1
Drainage: Yes, Drainage will be provided by natural perculation and surface runoff will drain into Mile 19 North Road side ditch. 
ETJ: No, Rural Area
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, OSSF’S.
Paved: Yes, Mile 19 North Road is paved.

2. PIPELINE PERMITS 
a. Applicant: North Alamo Supply Corporation
Legal Description:  5.15 acres out of Lot 15 Blk. 63 Capisallo District Subdivision Proposed Garza Ranch Subdivision (Mile 9 North Road & Mile ½ East Road) (Pct. 1)
Location of Pipeline or Utilities: Existing 4” waterline south of Mile 9 North Road.
Proposed improvement within Right-of-Way: One 3/4” water service line with a 2” PVC casing boring Mile 9 North Road. 

b. Applicant: North Alamo Supply Corporation
Legal Description:  South 6.013 acres out Lot  95 Hill Halbert Tract Subdivision (Mile 9 North Road & Billman Road) (Pct. 1)
Location of Pipeline or Utilities: Existing 2” waterline east of Billman Road.
Proposed improvement within Right-of-Way: One 3/4” water service line with a 2” PVC casing boring Billman Road. 

c. Applicant: North Alamo Supply Corporation
Legal Description:  Lot 3 Canas de Azucar Subdivision (Mile 16 North Road & Greenville Street) (Pct. 1)
Location of Pipeline or Utilities: Existing 2” waterline east of Greenville Street.
Proposed improvement within Right-of-Way: One 3/4” water service line with a 2” PVC casing boring Greenville Street. 

d. Applicant: Sharyland Water Supply Corporation
Legal Description:  1.00 acre out of Lot 13-5 West Addition to Sharyland (Trosper Road & Mile 3 Road) (Pct. 3)
Location of Pipeline or Utilities: Existing 4” waterline west of Trosper Road.
Proposed improvement within Right-of-Way: One 1” water service line with a 2” PVC casing boring Trosper Road. 

e. Applicant: Agua SUD
Legal Description:  Lot 15 Blk. 2 Texan Gardens Subdivision (Mile 4 Road & Texan Road) (Pct. 3)
Location of Pipeline or Utilities: Existing 8” waterline west of Texan Road.
Proposed improvement within Right-of-Way: One 1” water service line with a 2” PVC casing boring Texan Road. 

f. Applicant: Agua SUD
Legal Description:  10.95 acres out Lot 14 Blk. 20 Texan Gardens Subdivision (Mile 8 Road & Iowa Road) (Pct. 3)
Location of Pipeline or Utilities: Existing 8” waterline west of Iowa Road.
Proposed improvement within Right-of-Way: One 1” water service line with a 2” PVC casing boring Iowa Road. 

g. Applicant: S2 Engineering, PLLC.
Legal Description:  2.00 acres out of share 4 Schunior Subdivision of porciones 73-75; Proposed Salida Del Sol Estates Phase IX Subdivision (El Polvorin Drive & Mile 7 Road) (Pct. 3)
Location of Pipeline or Utilities: Existing 8” waterline west of El Polvorin Drive.
Proposed improvement within Right-of-Way: One 1” water service line with a 2” PVC casing boring El Polvorin Drive. 

h. Applicant: Spectrum (Project No. 5525234-PA13E)
Proposed location of Power Supply Pole:South of Allison Street approximately 75.00 feet east of South Border Road. (Pct. 1)

i. Applicant: Spectrum (Project No. 200010495-WE86E)
Proposed location of Power Supply Pole:East of Mile 5 ½ West Road approximately 395.00 feet south of Hill Drive. (Pct. 1)

j. Applicant: Vexus Fiber MSSN.05.002-3 –Pct. 3
Proposed improvement within Right-of-Way: A new fiber optic cable measuring 1 ½” is to be installed along the east side of Western Road and along Mile 4 North Road.
A new fiber optic cable measuring 1 ½” is to be installed along the north side of Mile 4 North Road within the right of way of Kaylen Drive, Leilahne Drive, and Rolando Drive for Texan Village Subdivision.
A new fiber optic cable measuring 1 ½” is to be installed within the right of way of Western Village Blvd., and Edgar Drive for Western Village Subdivision.
A new fiber optic cable measuring 1 ½” is to be installed along the east side of Western Road within the right of way of Coco Drive, Caracol Drive, Chanel Drive for Las Comadres #4 Subdivision.
A new fiber optic cable measuring 1 ½” is to be installed along the east side of Western Road within the right of way of Manuel Street, Estela Street, Eliza Street for Rancho El Potrero Subdivision.
 
k. Applicant: Vexus Fiber MSSN.05.009-3 -Pct. 3
Proposed improvement within Right-of-Way: A new fiber optic cable measuring 1 1/2” is to be installed within the right of way of Poinsetta Drive, Tangerine Lane, Jacaranda Place, and Heaven Drive for Citrus City Subdivision.
A new fiber optic cable measuring 1 1/2” is to be installed within the right of way of Mars Lane, Navel Lane, Grapefruit Lane, Sangelo Lane, Lemon Lane, Heaven Drive, and Valencia Lane for El Faco Chiquito Subdivision.
A new fiber optic cable measuring 1 1/2” is to be installed within the right of way of Juanita Street, Mission Spring Lane, Tornillo Street, Senecio Street, Mistflower Street, Grindelia Street, and Brushline Road for Los Naranjos Phase I and Phase II Subdivision.
A new fiber optic cable measuring 1 1/2” is to be installed within the right of way of Inez Street, Jay Keith Street, Ariana Street, Delaila Street, and Martina Street for Brushline LTD Subdivision.
A new fiber optic cable measuring 1 1/2” is to be installed within the right of way of Ruth Street, Jakob Street, and Jay Keith Street, for Brushline County Subdivision.

l. Applicant: Vexus Fiber EDBG.06.003-2 -Pct. 3
Proposed improvement within Right-of-Way: A new fiber optic cable measuring 1 1/2” is to be installed crossing Mayberry Road approximately ¼ mile south of S.H. 107.
A new fiber optic cable measuring 1 1/2” is to be installed along the west side of Taylor Road.
A new fiber optic cable measuring 1 1/2” is to be installed along the west side of Bentsen Road.
A new fiber optic cable measuring 1 1/2” is to be installed within the right of way of Zurich Avenue for Manuel F. Subdivision.
A new fiber optic cable measuring 1 1/2” is to be installed within the right of way of Brazos Avenue, Zurich Avenue, and North 87 Street for North Bryan Estates Subdivision.

m. Applicant: Vexus Fiber EDBG.06.017-3 -Pct. 3
Proposed improvement within Right-of-Way: A new fiber optic cable measuring 1 1/2” is to be installed along the west side of Bryan Road, along the north side of Saint Jude Avenue and along the west side of Stewart Blvd.

n. Applicant: Vexus Fiber EDBG.06.018-2 -Pct. 3
Proposed improvement within Right-of-Way: A new fiber optic cable measuring 1 1/2” is to be installed along the west side of Mayberry Blvd.

o. Applicant: Vexus Fiber EDBG.06.020-3 -Pct. 3
Proposed improvement within Right-of-Way: A new fiber optic cable measuring 1 1/2” is to be installed within the right of way of North 103 Road for Villa De Las Flores Subdivision.
A new fiber optic cable measuring 1 1/2” is to be installed within the right of way of Oak Street, Pine Street, and Ephraim Ave., Chicago Street for Tierra Estates Subdivision.

p. Applicant: Vexus Fiber MSSN.05.001-3 -Pct. 3
Proposed improvement within Right-of-Way: A new fiber optic cable measuring 1 1/2” is to be installed along the west side of Abraham Road within La Verdad Street, El Camino Street, Jesus Street, La Vida Street, Sara Street, and Isaac Street for Camino De Abram Subdivision and Camino De Abram Phase II Subdivision.
A new fiber optic cable measuring 1 1/2” is to be installed along the west side of Brushline Road within Diana Drive, Noel Drive, and Elize Drive for Basham No. 41 Subdivision.
A new fiber optic cable measuring 1 1/2” is to be installed along the west side of Brushline Road within Nicole Street, and Irma Linda Street for La Paloma Site Subdivision.
A new fiber optic cable measuring 1 1/2” is to be installed along the west side of Brushline Road within Whitney Circle, Ira Road, and Ward Road for Basham No. 12 Subdivision.
A new fiber optic cable measuring 1 1/2” is to be installed along the west side of Brushline Road within Russel Circle, Wilson Road, and Carol Road for Basham No. 16 Subdivision.
A new fiber optic cable measuring 1 1/2” is to be installed along the west side of Brushline Road within Cowboy Circle for Basham No. 13 Subdivision.
A new fiber optic cable measuring 1 1/2” is to be installed along the west side of Brushline Road within Ashley Way, Stray Drive, and Jessica Drive for Los Corrales De Leal Subdivision.
 
q. Applicant: Vexus Fiber MSSN.05.003-3 -Pct. 3
Proposed improvement within Right-of-Way: A new fiber optic cable measuring 1 1/2” is to be installed within the right of way of Durango Street for Western Estates Phase 1 Subdivision.
A new fiber optic cable measuring 1 1/2” is to be installed within the right of way of Lantana Blvd, Hannah Street for Shelby Subdivision.
A new fiber optic cable measuring 1 1/2” is to be installed within the right of way of Western Palm Drive for Western Palm Subdivision and Matermi Subdivision.
A new fiber optic cable measuring 1 1/2” is to be installed within the right of way of Dove Weed Street, Navel Lane, and Charro Street for Carrizales Subdivision.
A new fiber optic cable measuring 1 1/2” is to be installed along the north and south side of Mile 6 Road and within Suerte Drive for Buena Suerte 1 Subdivision.

r. Applicant: Vexus Fiber MSSN.05.004-1 –Pct. 3
Proposed improvement within Right-of-Way: A new fiber optic cable measuring 1 ½” is to be installed along the north side of Mile 6 Road within Rosa Street, and Tula Street for Tula Rosa Subdivision.
A new fiber optic cable measuring 1 ½” is to be installed within the right of way of Siesta Drive, Fiesta Drive, and Lake View Drive for Citrus Lake Estates Subdivision.
A new fiber optic cable measuring 1 ½” is to be installed within the right of way of Janice Drive, Robert Michael Drive, Lakeview Drive, and Marshall Street for Las Estrellas 3 Subdivision.
A new fiber optic cable measuring 1 ½” is to be installed within the right of way of Coyote Circle North, Coyote Circle South, and Coyote Circle East for Basham #33 Subdivision.
A new fiber optic cable measuring 1 ½” is to be installed within the right of way of North side Drive, Doffing Lane for Basham #44 Subdivision and West Doffing Subdivision.
A new fiber optic cable measuring 1 ½” is to be installed within the right of way of Elsa Drive for Armando Garza Subdivision

s. Applicant: Vexus Fiber MSSN.05.005-4 -Pct. 3
Proposed improvement within Right-of-Way: A new fiber optic cable measuring 1 ½” is to be installed along the east side of Minnesota Road within west Mile 4 Road for Minnesota Heights Subdivision.
A new fiber optic cable measuring 1 ½” is to be installed along the east side of Minnesota Road within Andresito Drive, Rio Drive, and Gooch Road for Veronica Estates Subdivision
A new fiber optic cable measuring 1 ½” is to be installed along the east side of Minnesota Road within the west Quail Drive for Minnesota Heights Subdivision.
A new fiber optic cable measuring 1 ½” is to be installed within the right of way of Sunny Circle, Rocio Drive for Basham #31 Subdivision.
A new fiber optic cable measuring 1 ½” is to be installed within the right of way of Catrina Drive for Doffing Heights Subdivision.
A new fiber optic cable measuring 1 ½” is to be installed within the right of way of Nevada Street, and Sunny Circle for Enrique Bazan Subdivision.
A new fiber optic cable measuring 1 ½” is to be installed within the right of way of Anna Drive for Doffing Heights Phase I Subdivision.
A new fiber optic cable measuring 1 ½” is to be installed within the right of way of Gooch Road, Bag Lane, and La Mancha Drive for Las Estrellas 4 Subdivision.
A new fiber optic cable measuring 1 ½” is to be installed within the right of way of Walton Drive for Walton Subdivision.
A new fiber optic cable measuring 1 ½” is to be installed within the right of way of north Ezequiel Loop, and South Ezequiel Loop for Acevedo Unit 3 Subdivision.
A new fiber optic cable measuring 1 ½” is to be installed within the right of way of Los Jardines Drive, and Granja Circle for El Jardin Estates No. 2 Subdivision.

t. Applicant: Vexus Fiber MSSN.05.006-1 -Pct. 3
Proposed improvement within Right-of-Way: A new fiber optic cable measuring 1 1/2” is to be installed within the right of way of Robert Michael Street, Morgan Street, James Patrick Street for Minnesota Country Estates Subdivision.
A new fiber optic cable measuring 1 ½” is to be installed within the right of way of Eduardo’s Street for Palm Drive Acres Subdivision.
A new fiber optic cable measuring 1 ½” is to be installed within the right of way of Grandview Drive for Acevedo Unit 8 Subdivision.
A new fiber optic cable measuring 1 ½” is to be installed within the south side of Mile 6 Road within Avery Drive Jordan Garden Subdivision.
A new fiber optic cable measuring 1 ½” is to be installed along the south side of Mile 6 Road within Bandit Circle, Dawna Circle, Travis Neal Street for Palm Country Estates Subdivision.
A new fiber optic cable measuring 1 ½” is to be installed within the right of way of Ryan Andrew Circle, and Rachel Diann Lane for Travis Country Estates Subdivision.

BACKGROUND


Fiscal Impact

Attachments

Form Review

Inbox Reviewed By Date
Budget and Management Veronica Ortiz 07/16/2025 04:56 PM
Final Approval Monica Salinas 07/18/2025 05:24 PM
Form Started By:
Flor Castillo
Started On:
07/16/2025 04:27 PM
Final Approval Date:
07/18/2025