North Alamo Water Supply Corporation:
*  Rose Gardens Apartments:  1.  Bore an 6" waterline with a 12" PVC casing 1,300 feet west of the center line of I Road on the North and South side of Minnesota Road.
*  North Alamo WSC is proposing to bore and encase a 12- inch PVC waterline to cross from the south right-of-way line to the north right-of-way line of Mile 17 1/2 North.  The proposed waterline will consist of 40 lineal feet of 12-inch PVC pipe and 30 lineal feet of 20- inch x 3/8 inch steel casing.  The proposed casing will be installed at a minimum of 40-inches below natural ground.  In addition, the said waterline will be located 27.5 feet east from the intersection of said Mile 2 West and Mile 17 1/2 North.
*  North Alamo WSC is proposing to bore and encase a 12-inch PVC waterline to cross from the south right-of-way line to the north right-of-way line of Mile 17 North.  The proposed waterline will consist of 187 lineal feet of 12-inch PVC pipe and 28 lineal feet of 20-inch x 3/4 inch steel casing to cross said Mile 17 North.  The proposed casing and waterline will be installed at a minimum of 40-inches below natural ground. In addition, the said waterline will be located 15.0- feet east from the centerline of Mile 2 West.
*  North Alamo WSC is proposing to bore and encase a 12-inch PVC waterline to cross from the east right-of-way line to the west right-of-way line of Mile 2 West.  The proposed waterline will consist of 40 lineal feet of 12-inch PVC pipe and 40 lineal feet of 20-inch x 3/8 inch steel casing.  The proposed casing will be installed at a minimum of 40-inches below natural ground.  In addition, the said waterline will be located 700.0- feet north from the centerline of Mile 17 North.
*  North Alamo WSC is proposing to bore and encase a 12-inch PVC waterline to cross from the west right-of-way line to the east right-of-way line of Mile 2 West.  The proposed waterline will consist of 40 lineal feet of 12-inch PVC pipe and 30 lineal feet of 20-inch x 3/8 inch steel casing.  The proposed casing will be installed at a minimum of 40-inches below natural ground.  In addition, the said waterline will be located 27.5 feet south from the intersection of said Mile 17 1/2 North and Mile 2 West.

BACKGROUND


Fiscal Impact

Attachments

Form Review

Inbox Reviewed By Date
Budget and Management Obdett Calzada 08/21/2013 04:51 PM
Auditor's Office Monica Salinas 08/30/2013 11:55 AM
Form Started By:
Rebecca Gomez
Started On:
08/19/2013 02:42 PM
Final Approval Date:
08/30/2013