AI- 56025
Executive Office 6.A.
CC CONSENT
- Meeting Date:
- 08/30/2016
- Submitted By:
- Rebecca Gomez, EXECUTIVE OFFICE
- Department:
- EXECUTIVE OFFICE
Information
CAPTION
Approval of Right of Way Permits -
1. Sharyland Water Supply Corp.: Road Crossing (Bore): A 12" PVC waterline to be encased within a 20" STEEL casing to be located approximately 70 ft. north of the intersection of 10th ST. and Chapin Rd.
2. North Alamo Water Supply: (Huisache Acres #13)
a). A proposed 8" PVC waterline within Dillon Road right-of-way approximately 730.62 feet South & 27.0 feet East of the centerline and intersection of Trenton Road and Dillon Road. Said waterline will be 589.38 feet in length and the contractor shall install a 16" PVC casing said 8" waterline.
b). A proposed 8" PVC water line crossing Trenton Road approximately 57.5 feet East of Dillon Road. The contractor shall open cut Trenton Road and install a 16" PVC casing for the 8" water line.
c). A proposed 8" PVC water line crossing Wisconsin Road approximately 57.5 feet East of Dillon Road. The contractor shall bore Wisconsin Road and install a 16" PVC casing for the 8" water line.
1. Sharyland Water Supply Corp.: Road Crossing (Bore): A 12" PVC waterline to be encased within a 20" STEEL casing to be located approximately 70 ft. north of the intersection of 10th ST. and Chapin Rd.
2. North Alamo Water Supply: (Huisache Acres #13)
a). A proposed 8" PVC waterline within Dillon Road right-of-way approximately 730.62 feet South & 27.0 feet East of the centerline and intersection of Trenton Road and Dillon Road. Said waterline will be 589.38 feet in length and the contractor shall install a 16" PVC casing said 8" waterline.
b). A proposed 8" PVC water line crossing Trenton Road approximately 57.5 feet East of Dillon Road. The contractor shall open cut Trenton Road and install a 16" PVC casing for the 8" water line.
c). A proposed 8" PVC water line crossing Wisconsin Road approximately 57.5 feet East of Dillon Road. The contractor shall bore Wisconsin Road and install a 16" PVC casing for the 8" water line.
BACKGROUND
Fiscal Impact
Attachments
Form Review
| Inbox | Reviewed By | Date |
|---|---|---|
| Budget and Management | Veronica Ortiz | 08/25/2016 03:46 PM |
| Final Approval | Monica Salinas | 08/26/2016 05:46 PM |
- Form Started By:
- Rebecca Gomez
- Started On:
- 08/24/2016 09:29 AM
- Final Approval Date:
- 08/26/2016