AI- 56667
Executive Office 7.A.
CC CONSENT
- Meeting Date:
- 10/13/2016
- Submitted By:
- Rebecca Gomez, EXECUTIVE OFFICE
- Department:
- EXECUTIVE OFFICE
Information
CAPTION
Approval of Right of Way Permits:
1). North Alamo Water Supply Corporation: Light of The Valley Church: Proposing a 12 inch bore casing for a 6 inch waterline along Earling Road, from the centerline of Cesar Chavez Road go west approximately 1,000 feet. Will bore Earling Road from North to South.
2). Sharyland Water Supply Corp.: Road Crossing (Bore): A 12" PVC waterline to be encased within a 20" steel casing to be located approximately 65 ft. West of the intersection of Shary Rd. and 4 Mile Line.
3). Luis Garcia (Owner/Manager) on behalf of Fenech Sole, LLC: Approx. 36.00 linear feet of open-cut, patch and repair for the installation of 60.00 linear feet of 18" class III reinforced concrete pipe culvert across Mile 2 E. with concrete safety-end-treatments at each end. The crossing will be located on the south side of the intersection of Mile 4N. and Mile 2E, southeast of the City of Mercedes, TX.
1). North Alamo Water Supply Corporation: Light of The Valley Church: Proposing a 12 inch bore casing for a 6 inch waterline along Earling Road, from the centerline of Cesar Chavez Road go west approximately 1,000 feet. Will bore Earling Road from North to South.
2). Sharyland Water Supply Corp.: Road Crossing (Bore): A 12" PVC waterline to be encased within a 20" steel casing to be located approximately 65 ft. West of the intersection of Shary Rd. and 4 Mile Line.
3). Luis Garcia (Owner/Manager) on behalf of Fenech Sole, LLC: Approx. 36.00 linear feet of open-cut, patch and repair for the installation of 60.00 linear feet of 18" class III reinforced concrete pipe culvert across Mile 2 E. with concrete safety-end-treatments at each end. The crossing will be located on the south side of the intersection of Mile 4N. and Mile 2E, southeast of the City of Mercedes, TX.
BACKGROUND
Fiscal Impact
Attachments
Form Review
| Inbox | Reviewed By | Date |
|---|---|---|
| Budget and Management | Veronica Ortiz | 10/06/2016 11:29 AM |
| Final Approval | Monica Salinas | 10/07/2016 05:19 PM |
- Form Started By:
- Rebecca Gomez
- Started On:
- 09/29/2016 08:54 AM
- Final Approval Date:
- 10/07/2016