AI- 62185
Planning Department 16.A.
CC - REGULAR
- Meeting Date:
- 10/24/2017
- Submitted For:
- Flor Castillo
- Submitted By:
- Flor Castillo, PLANNING DEPT.
- Department:
- PLANNING DEPT.
Information
CAPTION
1. Preliminary Approval
a. Starlight Subdivision- Pct. 4 (VDC Alberta Longoria, LP) (Raul Longoria Road & Alberta Road)
No. of Lots: 1 Multi-Family
Flood Zone: AH, Engineer has submitted a CLOMR-F to FEMA under Case No. 17-06-0902-C to remove proposed development out of flood zone “AH” and change to zone “B”.
Drainage: Yes, Drainage will be provided by storm drainage system connecting to a detention pond discharging to the existing drain ditch.
ETJ: Yes, approved by the City of Edinburg.
Water: Yes, provided by North Alamo Water Supply
Sewer: Yes, Sanitary Sewer provided by North Alamo Water Supply
Paved: Yes, Raul Longoria Road.
b. J.V. Subdivision- Pct. 1 (Jose Villarreal, Owner) (Mile 15 ½ North Road & Mile 6 West Road)
No. of Lots: 2 Single Family
Flood Zone: X
Drainage: Yes, Drainage will be provided within the existing low areas of the lots and by regrading the existing road side ditch for Mile 15 ½ North Road.
ETJ: Yes, approved by the City of Elsa.
Water: Yes, provided by North Alamo Water Supply
Sewer: Yes, OSSF
Paved: Yes, Mile 15 ½ North Road.
c. Yarely Estates Subdivision- Pct. 3 (BAZBAR, LLC.) (Mile 5 North Road & Doffing Road)
No. of Lots: 6 Single Family; 3 Commercial
Flood Zone: X
Drainage: Yes, Drainage will be surface runoff received by a regraded Minnesota Road roadside ditch which will discharge into the existing TxDOT system.
ETJ: Yes, approved by the City of Mission.
Water: Yes, provided by Agua S.U.D.
Sewer: Yes, OSSF
Paved: Yes, Mile 5 North Road and 1 internal street to be paved.
d. Taurus Estates No. 22 Subdivision- Pct. 3 (BAZBAR, LLC.) (Mile 4 North Road & Los Ebanos Road)
No. of Lots: 17 Single Family
Flood Zone: C
Drainage: Yes, will be provided by Storm Drainage System and by regrading the roadside ditches of Los Ebanos Road and Mile 4 North Road.
ETJ: Yes, approved by the City of Mission.
Water: Yes, provided by Sharyland Water Supply Corporation
Sewer: Yes, OSSF
Paved: Yes, Mile 4 North Road. Los Ebanos Road and 1 internal street to be paved.
2. Final Approval
a. La Palmilla Apartments Subdivision - Pct. 4 (VDC Alberta Longoria, LP) (Alberta Road & Raul Longoria Road)
No. of Lots: 1 Multi-Family
Flood Zone: B
Drainage: Yes, Drainage will be provided by storm sewer pipe system discharging to a detention pond, draining out to the existing drain ditch.
ETJ: Yes, approved by the City of Edinburg.
Water: Yes, provided by North Alamo Water Supply
Sewer: Yes, Sanitary Sewer provided by North Alamo Water Supply
Paved: Yes, Alberta Road.
b. Eduardo’s No. 17 Subdivision - Pct. 3 (Izaguirre Real Estates, Owner) (Mile 6 North Road & Trosper Road)
No. of Lots: 78 Single Family
Flood Zone: X
Drainage: Yes, Drainage will be provided by storm drainage system and detention will be accomplished by widening the existing drain ditch.
ETJ: Yes, approved by the City of Mission.
Water: Yes, provided by Sharyland Water Supply Corporation
Sewer: Yes, Sanitary Sewer provided by City of Alton
Paved: Yes, Mile 6 North Road and 1 internal street.
3. Final Approval With Financial Guarantee
a. Los Feliz Phase 2 Subdivision- Pct. 4 (Forrest N. Runnels Jr., Owner) (Mile 22 ½ Road & Brushline Road)
No. of Lots: 30 Single Family
Flood Zone: X
Drainage: Yes, Surface runoff into roadside ditch which connects to HCDD#1 facility.
ETJ: No, Rural Area
Water: Yes, provided by North Alamo Water Supply
Sewer: Yes, 28 OSSF installed
Paved: Yes, Brushline Road.
Final Approval with financial guarantee in the amount of $3,000.00 to secure the installation of 2 OSSF(S)
a. Starlight Subdivision- Pct. 4 (VDC Alberta Longoria, LP) (Raul Longoria Road & Alberta Road)
No. of Lots: 1 Multi-Family
Flood Zone: AH, Engineer has submitted a CLOMR-F to FEMA under Case No. 17-06-0902-C to remove proposed development out of flood zone “AH” and change to zone “B”.
Drainage: Yes, Drainage will be provided by storm drainage system connecting to a detention pond discharging to the existing drain ditch.
ETJ: Yes, approved by the City of Edinburg.
Water: Yes, provided by North Alamo Water Supply
Sewer: Yes, Sanitary Sewer provided by North Alamo Water Supply
Paved: Yes, Raul Longoria Road.
b. J.V. Subdivision- Pct. 1 (Jose Villarreal, Owner) (Mile 15 ½ North Road & Mile 6 West Road)
No. of Lots: 2 Single Family
Flood Zone: X
Drainage: Yes, Drainage will be provided within the existing low areas of the lots and by regrading the existing road side ditch for Mile 15 ½ North Road.
ETJ: Yes, approved by the City of Elsa.
Water: Yes, provided by North Alamo Water Supply
Sewer: Yes, OSSF
Paved: Yes, Mile 15 ½ North Road.
c. Yarely Estates Subdivision- Pct. 3 (BAZBAR, LLC.) (Mile 5 North Road & Doffing Road)
No. of Lots: 6 Single Family; 3 Commercial
Flood Zone: X
Drainage: Yes, Drainage will be surface runoff received by a regraded Minnesota Road roadside ditch which will discharge into the existing TxDOT system.
ETJ: Yes, approved by the City of Mission.
Water: Yes, provided by Agua S.U.D.
Sewer: Yes, OSSF
Paved: Yes, Mile 5 North Road and 1 internal street to be paved.
d. Taurus Estates No. 22 Subdivision- Pct. 3 (BAZBAR, LLC.) (Mile 4 North Road & Los Ebanos Road)
No. of Lots: 17 Single Family
Flood Zone: C
Drainage: Yes, will be provided by Storm Drainage System and by regrading the roadside ditches of Los Ebanos Road and Mile 4 North Road.
ETJ: Yes, approved by the City of Mission.
Water: Yes, provided by Sharyland Water Supply Corporation
Sewer: Yes, OSSF
Paved: Yes, Mile 4 North Road. Los Ebanos Road and 1 internal street to be paved.
2. Final Approval
a. La Palmilla Apartments Subdivision - Pct. 4 (VDC Alberta Longoria, LP) (Alberta Road & Raul Longoria Road)
No. of Lots: 1 Multi-Family
Flood Zone: B
Drainage: Yes, Drainage will be provided by storm sewer pipe system discharging to a detention pond, draining out to the existing drain ditch.
ETJ: Yes, approved by the City of Edinburg.
Water: Yes, provided by North Alamo Water Supply
Sewer: Yes, Sanitary Sewer provided by North Alamo Water Supply
Paved: Yes, Alberta Road.
b. Eduardo’s No. 17 Subdivision - Pct. 3 (Izaguirre Real Estates, Owner) (Mile 6 North Road & Trosper Road)
No. of Lots: 78 Single Family
Flood Zone: X
Drainage: Yes, Drainage will be provided by storm drainage system and detention will be accomplished by widening the existing drain ditch.
ETJ: Yes, approved by the City of Mission.
Water: Yes, provided by Sharyland Water Supply Corporation
Sewer: Yes, Sanitary Sewer provided by City of Alton
Paved: Yes, Mile 6 North Road and 1 internal street.
3. Final Approval With Financial Guarantee
a. Los Feliz Phase 2 Subdivision- Pct. 4 (Forrest N. Runnels Jr., Owner) (Mile 22 ½ Road & Brushline Road)
No. of Lots: 30 Single Family
Flood Zone: X
Drainage: Yes, Surface runoff into roadside ditch which connects to HCDD#1 facility.
ETJ: No, Rural Area
Water: Yes, provided by North Alamo Water Supply
Sewer: Yes, 28 OSSF installed
Paved: Yes, Brushline Road.
Final Approval with financial guarantee in the amount of $3,000.00 to secure the installation of 2 OSSF(S)
BACKGROUND
Fiscal Impact
Attachments
- Starlight Subd.
- J.V. Subd.
- Yarely Est. Subd.
- Taurus Est. #22 Subd.
- La Palmilla Apts.Subd.
- Eduardo's NO. 17 Subd.
- Los Feliz Ph. 2 Subd.
Form Review
| Inbox | Reviewed By | Date |
|---|---|---|
| Budget and Management | Veronica Ortiz | 10/19/2017 02:46 PM |
| Final Approval | Monica Salinas | 10/20/2017 05:37 PM |
- Form Started By:
- Flor Castillo
- Started On:
- 10/19/2017 02:07 PM
- Final Approval Date:
- 10/20/2017