Skip to main content

AgendaQuick™

View Agenda Item

AI- 66283
Planning Department   24.A.
CC - REGULAR
Meeting Date:
08/28/2018
Submitted For:
Flor Castillo
Submitted By:
Flor Castillo, PLANNING DEPT.
Department:
PLANNING DEPT.

Information

CAPTION

1. Preliminary Approval
a. Mezquite Moore Subdivision- Pct. 2 (Ricardo Cazares) (Moore Road & Tower Road)
No. of Lots: 36 Single Family
Flood Zone: B
Drainage: Yes, Drainage will be provided by Storm Drainage Pipe System and detention will be provided by widening the existing drain ditch.
ETJ: Yes, City of Alamo.
Water: Yes, provided by Military Highway Water Supply
Sewer: Yes, Sanitary Sewer provided by Military Highway Water Supply.
Paved: Yes, Moore Road and 1 internal street to be paved.

b. El Mirador Subdivision- Pct. 4 (Alvar Gonzalez) (F.M. 2128 & Cesar Chavez Road)
No. of Lots: 1 Multi-Family
Flood Zone: X
Drainage: Yes, Drainage will be provided by Onsite Detention with a proposed 8” PVC line connecting to an existing TxDot inlet along F.M. 2128.
ETJ: Yes, City of Edinburg.
Water: Yes, provided by North Alamo Water Supply Corporation
Sewer: Yes, OSSF
Paved: Yes, Richardson Blvd. (F.M. 2128) paved.

c. San Jorge Subdivision- Pct. 1 (Hector Balderas) (Ferguson Road & Valley View Road)
No. of Lots: 15 Single Family
Flood Zone: C
Drainage: Yes, Drainage will be provided by Storm Drainage Pipe System and detention will be provided by widening the existing drain ditch.
ETJ: Yes, City of Donna.
Water: Yes, provided by North Alamo Water Supply Corporation
Sewer: Yes, OSSF
Paved: No, Ferguson Road and 1 internal street to be paved.

d. Thompson Acres Subdivision- Pct. 1 (Donald Thompson) (Mile 5 North Road & Mile 4 West Road)
No. of Lots: 1 Single Family
Flood Zone: B
Drainage: Yes, Drainage will be provided by natural perculation within the proposed lot and surface runoff will be drain onto
Mile 5 North Road side ditch.
ETJ: Yes, City of Weslaco.
Water: Yes, provided by City of Weslaco
Sewer: Yes, OSSF
Paved: Yes, Mile 5 North Road paved.

e. Lazy L Subdivision- Pct. 1 (Betty A. Lofton) (Mile 11 North Road & Mile 6 West Road)
No. of Lots: 2 Single Family
Flood Zone: X
Drainage: Yes, Drainage will be provided by natural perculation with in the proposed lots and surface runoff will be drain onto Mile 11 North Road side ditch.
ETJ: Yes, City of Weslaco.
Water: Yes, provided by North Alamo Water Supply Corporation
Sewer: Yes, OSSF
Paved: Yes, Mile 11 North Road paved

f. Aurora Valley Phase 5 Subdivision- Pct. 1 (Rhodes Enterprises Inc.) (Wisconsin Road & Dillon Road)
No. of Lots: 99 Single Family
Flood Zone: C
Drainage: Yes, Drainage will be provided by Storm Drainage Pipe System and detention will be provided by widening the existing drain ditch.
ETJ: Yes, City of Donna.
Water: Yes, provided by North Alamo Water Supply Corporation
Sewer: Yes, OSSF
Paved: No, Wisconsin Road and 7 internal streets to be paved.

2. Final Approval
a. Trevino Brothers Subdivision- Pct. 4 (Hector Trevino) (Val Verde Road & Mile 15 North Road)
No. of Lots: 2 Single Family
Flood Zone: C
Drainage: Yes, Drainage will be provided by natural perculation and surface run-off will be drain onto
Val Verde Road side ditch.
ETJ: Yes, City of Edinburg.
Water: Yes, provided by North Alamo Water Supply Corporation
Sewer: Yes, OSSF have been installed.
Paved: Yes, Val Verde Road paved.

b. Replat of Lots 17 & 18 Alberta Village Subdivision- Pct. 4 (Julio & Melissa Carranza) (Alberta Road & Raul Longoria Road)
No. of Lots: 2 Single Family
Flood Zone: B
Drainage: Yes, Drainage will be provided by storm drainage pipe system and detention will be provided by widening the existing drain ditch.
ETJ: Yes, City of Edinburg.
Water: Yes, provided by North Alamo Water Supply Corporation
Sewer: Yes, Sanitary Sewer provided by City of Edinburg.
Paved: Yes, Galilea Street paved.

c. Camino De Abram Subdivision- Pct. 3 (Everman Development, LLC.) (Abram Road & Mile 3 North Road)
No. of Lots: 81 Single Family
Flood Zone: X
Drainage: Yes, Drainage consists of storm sewer system discharging to an existing drainage basin owned by the HCDD#1.
ETJ: Yes, City of Mission.
Water: Yes, provided by Agua SUD
Sewer: Yes, OSSF have been installed.
Paved: Yes, Abram Road and 4 internal streets paved.

3. Final Approval with Financial Guarantee
a. Re-Subdivision of Lot 2 Tierra Madre Subdivision- Pct. 1 (Maria San Juana Garcia) (F.M. 493 & Mile 17 ½ North Road)
No. of Lots: 1 Multi-Family
Flood Zone: X & AH
Drainage: Yes, Drainage will be provided by natural perculation within the proposed lot and surface run-off onto F.M. 493 road side ditch.
ETJ: No, Rural Area
Water: Yes, provided by North Alamo Water Supply Corporation
Sewer: Yes, OSSF has been escrowed.
Paved: Yes, F.M. 493 paved.
*Final Approval with Cash Deposit in the amount of $5,200.00 for 1 OSSF. 

4. Discussion and approval to allow the dedication of an off-site 15 feet Drainage Easement to Hidalgo County for the purposes of running a storm sewer pipeline from the proposed Salida del Sol Ph VII to an HCDD #1 ditch
(exhibits A & B attached).


5. Re-appointment of Members for the Hidalgo County Subdivision Advisory Board & Hidalgo County Board of Building Line Adjustment
a. Manuel Cantu - Pct. 2
b. Omar Ramon - Pct.3
c. Leonel Garza - Pct. 4

BACKGROUND


Fiscal Impact

Attachments

Form Review

Inbox Reviewed By Date
Budget and Management Veronica Ortiz 08/22/2018 04:09 PM
Final Approval Monica Salinas 08/24/2018 06:05 PM
Form Started By:
Flor Castillo
Started On:
08/22/2018 03:12 PM
Final Approval Date:
08/24/2018