Skip to main content

AgendaQuick™

View Agenda Item

AI- 69510
Planning Department   15.A.
CC - REGULAR
Meeting Date:
03/26/2019
Submitted For:
Flor Castillo
Submitted By:
Flor Castillo, PLANNING DEPT.
Department:
PLANNING DEPT.

Information

CAPTION

1. Preliminary Approval with Variance Request
a. Santa Fe Terrace Subdivision- Pct. 2 (Oscar Hernandez) (El Gato Road & South 3rd Street)
 No. of Lots: 7 Single Family
 Flood Zone: B
 Drainage: Yes, Drainage will be provided by natural perculation within the proposed lots and surface runoff will drain into El Gato Road side ditch.
 ETJ: Yes, approved by the City of Alamo.
 Water: Yes, provided by Military Highway Water Supply Corporation.
 Sewer: Yes, Sanitary Sewer provided by Military Highway Water Supply.
 
2. Preliminary Approval
a. RePlat of Lot 2 Fidencio Garcia Estates Subdivision- Pct. 1 (Melissa Garcia) (Monte Cristo Road & F.M. 493)
 No. of Lots: 2 Single Family
 Flood Zone: X
 Drainage: Yes, Drainage will be provided by natural perculation within the proposed lots and surface runoff will drain into Monte Cristo Road side ditch.
 ETJ: No, Rural Area
 Water: Yes, provided by North Alamo Water Supply Corporation.
 Sewer: Yes, OSSF’s
 
b. Ruben Valdez Subdivision- Pct. 4 (Ruben & Velma Valdez) (North Taylor Road & Mile 5 North Road)
 No. of Lots: 2 Single Family, 1 Multi-Family
Flood Zone: X
 Drainage: Yes, Drainage will be provided by natural perculation within the proposed lots and surface runoff will drain into North Taylor Road side ditch.
 ETJ: Yes, approved by the City of McAllen.
 Water: Yes, provided by Sharyland Water Supply Corporation.
 Sewer: Yes, Sanitary Sewer provided by Sharyland Water Supply Corporation.
 
c. Resendez Subdivision- Pct. 4 (Sergio Resendez) (Canton Road & Tower Road)
  No. of Lots: 4 Single Family
  Flood Zone: B
  Drainage: Yes, Drainage will be provided by natural perculation within the proposed lots and surface runoff will drain into
 Canton Road side ditch.
 ETJ: Yes, approved by the City of Edinburg.
 Water: Yes, provided by North Alamo Water Supply Corporation.
 Sewer: Yes, OSSF’s
 
d. Las Comadres #6 Subdivision- Pct. 3 (Carlos G. Leal, Jr.) (Iowa Road & Mile 4 North Road)
 No. of Lots: 66 Single Family
 Streetlights: To be determined
 Flood Zone: X
 Drainage: Yes, Drainage will be provided by a Storm Sewer System discharging to HCDD#1 Regional Detention Facility approximately ½ mile southwest from the proposed subdivision.
 ETJ: Yes, approved by the City of Mission.
 Water: Yes, provided by Agua SUD
 Sewer: Yes, OSSF’s
 Paved: 4 internal streets to be paved.
 
e. Pueblo De Palmas Phase 23 Subdivision- Pct. 4 (PDP Mile 4, LTD.) (Alamo Road & Mile 19 North Road)
 No. of Lots: 89 Single Family
 Streetlights: To be determined
 Flood Zone: X
 Drainage: Yes, Drainage will be provided by a Storm Sewer System and Detention will be provided by widening the existing drain ditch.
 ETJ: Yes, approved by the City of Edinburg.
 Water: Yes, provided by North Alamo Water Supply Corporation.
 Sewer: Yes, Sanitary Sewer provided by City of Edinburg.
 Paved: 5 internal streets to be paved.
 
3. Final Approval
a. El Mirador Subdivision - Pct. 4 (Alvar Gonzalez) (F.M. 2128 & Cesar Chavez Road)
 No. of Lots: 1 Multi-Family
 Flood Zone: X
 Drainage: Yes, Drainage will be provided by onsite detention with a proposed 8” PVC Bleeder line connecting to an existing TxDot inlet along F.M. 2128.
 ETJ: Yes, approved by the City of Edinburg.
 Water: Yes, provided by North Alamo Water Supply Corporation.
 Sewer: Yes, OSSF has been installed.
 
4. Final Approval with Financial Guarantee
a. Mesquite Xrossing Subdivision- Pct. 1 (Daniel Alaniz) (F.M. 88 & Mile 14 North Road)
 No. of Lots: 5 Single Family
 Flood Zone: X
 Drainage: Yes, Drainage will be provided by natural perculation and surface runoff along the front area of the lots discharging into existing TxDot System.
 ETJ: No, Rural Area
 Water: Yes, provided by North Alamo Water Supply Corporation
 Sewer: Yes, (5) OSSF’s have been escrowed.
 *Final Approval with Cash Deposit in the amount of $8,700.00 for 5 OSSF’s and 2 Shared Driveways.

BACKGROUND


Fiscal Impact

Attachments

Form Review

Inbox Reviewed By Date
Budget and Management Veronica Ortiz 03/21/2019 02:18 PM
Final Approval Monica Salinas 03/22/2019 05:59 PM
Form Started By:
Flor Castillo
Started On:
03/21/2019 11:26 AM
Final Approval Date:
03/22/2019