Planning Department   22.C.
CC AGENDA SPECIAL MTG
Meeting Date:
07/01/2019
Submitted For:
Flor Castillo
Submitted By:
Flor Castillo, PLANNING DEPT.
Department:
PLANNING DEPT.

Information

CAPTION

SUBDIVISION APPROVALS   
1. Preliminary Approval
a.Vista Ridge Acres Phase VII Subdivision- Pct. 1 (Jack McClelland) (Mile 5 ½ West Road & Mile 20 North Road)
 No. of Lots: 34 Single Family
 Flood Zone: X
 Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by widening the existing drain ditch.
 ETJ: No, Rural Area
 Water: Yes, provided by North Alamo Water Supply Corporation.
 Sewer: Yes, OSSF’s
 
b. Abram Estates No. 1 Subdivision- Pct. 3 (A&M Management, Inc.) (Abram Road & Mile 1 South Road)
 No. of Lots: 121 Single Family
 Flood Zone: C
 Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by widening the existing drain ditch.
 ETJ: Yes, approved by the City of Palmview
 Water: Yes, provided by Agua SUD
 Sewer: Yes, Sanitary Sewer provided by Agua SUD.
 
2. Final Approval
a.Starlight Subdivision- Pct. 4 (VDC Alberta Longoria) (Raul Longoria Road & Alberta Road)
 No. of Lots: 1 Multi-Family
 Flood Zone: B
 Drainage: Yes, Drainage will be provided by storm sewer system connecting to a detention pond discharging to the existing drain ditch.
 ETJ: Yes, approved by the City of Edinburg
 Water: Yes, provided by North Alamo Water Supply Corporation.
 Sewer: Yes, Sanitary Sewer provided by North Alamo Water Supply Corporation.
 
b. Villas Del Angel Subdivision- Pct. 3 (Gilbert Ramirez) (Glasscock Road & Mile 7 North Road)
 No. of Lots: 2 Single Family
 Flood Zone: X
 Drainage: Yes, drainage will be provided by natural perculation and surface runoff will  drain into Glasscock Road side ditch.
 ETJ: Yes, approved by the City of McAllen.
 Water: Yes, provided by Sharyland Water Supply Corporation.
 Sewer: Yes, 2 OSSF’s are existing.
 
c. J.V. Commercial Subdivision No. 2- Pct. 4 (Jose Villarreal) (F.M. 493 & Mile 20 North Road)
 No. of Lots: 3 Commercial
 Flood Zone: X
 Drainage: Yes, Drainage will be provided by onsite detention based on the approved site plan at development permit stage.
 ETJ: No, Rural Area
 Water: Yes, provided by North Alamo Water Supply Corporation.
 Sewer: Yes, OSSF’s to be installed at development permit stage.
 
d. Vista Ridge Acres Phase VI Subdivision- Pct. 1 (Jack McClelland) (Mile 5 ½ West Road & Mile 20 North Road)
 No. of Lots: 66 Single Family
 Flood Zone: X
 Drainage: Yes, Drainage will be provided by storm sewer system discharging into an existing drain ditch.
 ETJ: No, Rural Area
 Water: Yes, provided by North Alamo Water Supply Corporation.
 Sewer: Yes, OSSF’s have been installed for (66) single family lots.
 
e. La Reserva Phase 1-A Subdivision- Pct. 4 (Tyler Stone) (F.M. 2812 & Uresti Road)
 No. of Lots: 99 Single Family
 Flood Zone: C
 Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by an existing drain ditch.
 ETJ: Yes, approved by the City of Edinburg.
 Water: Yes, provided by North Alamo Water Supply Corporation.
 Sewer: Yes, OSSF’s have been installed for (99) single family lots.
 Streetlights: 21 Streetlights
 
f. Blanquita Estates Subdivision- Pct. 1 (Kevin Campbell) (Mile 14 ½ North Road & F.M. 493)
 No. of Lots: 34 Single Family
 Flood Zone: X Shaded
 Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by widening the existing drain ditch.
 ETJ: Yes, approved by the City of Donna.
 Water: Yes, provided by North Alamo Water Supply Corporation.
 Sewer: Yes, OSSF’s have been installed for (34) single family lots.
 Streetlights: 5 Streetlights
 
3. Final Approval with Variance Request
a.Faith Subdivision- Pct. 2 (Ismael Gonzalez & Cynthia Martinez) (Cesar Chavez Road & Eldora Road)
 No. of Lots: 1 Single Family
 Flood Zone: B
 Drainage: Yes, Drainage will be provided by natural perculation and surface runoff will drain into Cesar Chavez Road side ditch.
 ETJ: Yes, approved by the City of Alamo.
 Water: Yes, provided by North Alamo Water Supply Corporation.
 Sewer: Yes, OSSF has been installed for (1) single family lot.
 
4. Final Approval with Financial Guarantee
a. A. Valadez Subdivision #3- Pct. 4 (Adolfo Valadez) (Curry Road & Cesar Chavez Road)
 No. of Lots: 3 Single Family, 1 Commercial
 Flood Zone: X Shaded
 Drainage: Yes, Drainage will be provided by natural perculation with in the proposed lots and surface runoff will drain into Curry Road side ditch.
 ETJ: Yes, approved by the City of Edinburg.
 Water: Yes, provided by North Alamo Water Supply Corporation
 Sewer: Yes, OSSF’s have been installed for (3) single family lots.
 *Final Approval with Cash Deposit in the amount of 1,500.00 for 1 OSSF.

b. Resendez Subdivision- Pct. 4 (Sergio Resendez) (Canton Road & Tower Road)
 No. of Lots: 4 Single Family
 Flood Zone: B
 Drainage: Yes, Drainage will be provided by natural perculation within the proposed lots and surface runoff will drain into Canton Road side ditch.
 ETJ: Yes, approved by the City of Edinburg.
 Water: Yes, provided by North Alamo Water Supply Corporation
 Sewer: Yes, OSSF’s for lots 4B and 7B have been escrowed with this subdivision.
OSSF’s for lots 4A and 7A have been previously escrowed with the recorded plat of Berny Estates Unit 2
 *Final Approval with Cash Deposit in the amount of $3,000.00 for 2 OSSF’s.

c. Pueblo De Palmas Phase 22 Subdivision - Pct. 4 (Gary Frisby, President) (Alamo Road & Mile 19 North Road)
 No. of Lots: 115 Single Family, 6 Commercial
 Flood Zone: X Shaded
 Drainage: Yes, Drainage will be provided by a storm sewer system and detention will be provided by an existing drain ditch.
 ETJ: Yes, approved by the City of Edinburg.
 Water: Yes, provided by North Alamo Water Supply Corporation
 Sewer: Yes, Sanitary Sewer provided by City of Edinburg.
 *Final Approval with Letter of Credit in the amount of 889,859.48 for Sanitary Sewer, Storm Drainage and paving improvements has been submitted to the City of Edinburg.

BACKGROUND


Fiscal Impact

Attachments

Form Review

Inbox Reviewed By Date
Budget and Management Veronica Ortiz 06/21/2019 08:36 AM
Final Approval Monica Salinas 06/28/2019 08:04 AM
Form Started By:
Flor Castillo
Started On:
06/20/2019 04:14 PM
Final Approval Date:
06/28/2019