1. Preliminary Approval with Variance Request
a. Star Trail Subdivision- Pct.2 (Irene Uribe Manrique) (Eldora Road & U.S. Hwy 281)
 No. of Lots: 14 Multi-Family
 Flood Zone: B & AH.Flood zone “AH” will be revised via LOMR-F before final approval.
 Estimated Number of Streetlights:3
 Filling Stations:2
 Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by widening the existing drain ditch.
 ETJ: Yes, approved by the City of Pharr.
 Water: Yes, provided by North Alamo Water Supply Corporation.
 Sewer: Yes, Sanitary Sewer provided by City of Pharr.
 Paved: Yes, Eldora Road is paved and 1 internal street to be paved.
 
2. Preliminary Approval
a. Rio Rico Ranchettes Subdivision- Pct. 1 (Victor J. Daniec) (Mile 3 North Road & Mile 2 ½ East Road)
 No. of Lots: 4 Single Family
 Flood Zone: C
 Estimated Number of Streetlights:N/A
 Filling Stations:N/A
 Drainage: Yes, Drainage will be provided by natural perculation and surface runoff onto Mile 3 North Road side ditch and Mile 2 ½ East Road.
 ETJ: No, Rural Area.
 Water: Yes, provided by Military Highway Water Supply Corporation.
 Sewer: Yes, OSSF’s
 Paved: Yes, Mile 3 North Road and Mile 2 ½ East Road are paved.
 
b. RBR Subdivision No. 1 - Pct. 4 (Roel A. Rodriguez Jr.) (Mile 21 North Road & Val Verde Road)
 No. of Lots: 16 Single Family
 Flood Zone: X
 Estimated Number of Streetlights:4
 Filling Stations:2
 Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by widening the existing drain ditch.
 ETJ: No, Rural Area.
 Water: Yes, provided by North Alamo Water Supply Corporation.
 Sewer: Yes, OSSF’s
 Paved: Yes, Mile 21 North Road and 1 internal street to be paved.
 
c. Los Amigos Phase 2 Subdivision - Pct. 1 (Kyle Ruppert) (Baseline Road & Mile 12 ½ North Road)
 No. of Lots: 26 Single Family
 Flood Zone: X
 Estimated Number of Streetlights:5
 Filling Stations:3
 Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by widening the existing drain ditch.
 ETJ: No, Rural Area.
 Water: Yes, provided by North Alamo Water Supply Corporation.
 Sewer: Yes, OSSF’s
 Paved: Yes, Baseline Road is paved and 1 internal street to be paved.
 
3. Final Approval
a. Pueblo De Palmas Phase 23 Subdivision - Pct. 4 (Gary Frisby) (Alamo Road & Mile 19 North Road)
 No. of Lots: 89 Single Family
 Flood Zone: X
  Filling Stations:4
 Drainage: Yes, Drainage is provided by storm sewer system discharging onto an existing drain ditch.
 ETJ: Yes, approved by the City of Edinburg.
 Water: Yes, provided by North Alamo Water Supply Corporation.
 Sewer: Yes, Sanitary Sewer provided by City of Edinburg.
 Paved: Yes, Alamo Road is paved and 5 internal streets have been paved.
 
4. Final Approval with Financial Guarantee
a. Las Comadres No. 7 Subdivision- Pct. 3 (Carlos G. Leal Jr.) (Western Road & Mile 7 North Road)
 No. of Lots: 42 Single Family
 Flood Zone:X
 Streetlights: 10
 Filling Stations: 4
 Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by widening the existing drain ditch.
 ETJ: No, Rural Area.
 Water: Yes, provided by Agua S.U.D.
 Sewer: Yes, OSSF’S have been installed.
 *Final Approval with Letter of Credit No. 290 in the amount of $72,826.92 for Drainage Improvements.
 Paved: Yes, Western Road is paved and 5 internal streets have been paved.

BACKGROUND


Fiscal Impact

Attachments

Form Review

Inbox Reviewed By Date
Budget and Management Veronica Ortiz 04/23/2020 12:24 PM
Final Approval Monica Salinas 05/01/2020 06:06 PM
Form Started By:
Flor Castillo
Started On:
04/23/2020 10:08 AM
Final Approval Date:
05/01/2020