AI- 75662
Planning Department 5.C.
CC CONSENT AGENDA SPECIAL MTG
- Meeting Date:
- 05/26/2020
- Submitted For:
- Flor Castillo
- Submitted By:
- Flor Castillo, PLANNING DEPT.
- Department:
- PLANNING DEPT.
Information
CAPTION
1. PIPELINE AND UTILITY PERMITS
a. Applicant: Sharyland Water Supply Corporation
Legal Description: 1.61 acres out of the east 5.00 acres of the south 30.00 acres of Lot 49-4 West Addition to Sharyland (Pct. 3)
(Mile 7 Road and Trosper Road)
Location of Pipeline or Utilities: Existing 2” water line east of Trosper Road.
Proposed improvement within Right-of-Way: One 1” water service line with a 2” PVC casing boring Trosper Road.
b. Applicant: North Alamo Water Supply Corporation
Legal Description: Lot 14 section 250 Texas-Mexican Railway Co. Survey (Pct. 4)
(Cesar Chavez Road and F.M. 2128)
Location of Pipeline or Utilities: Existing 4” water line east of Cesar Chavez Road.
Proposed improvement within Right-of-Way: One 6” water line with a 12” PVC casing boring Cesar Chavez Road.
a. Applicant: Sharyland Water Supply Corporation
Legal Description: 1.61 acres out of the east 5.00 acres of the south 30.00 acres of Lot 49-4 West Addition to Sharyland (Pct. 3)
(Mile 7 Road and Trosper Road)
Location of Pipeline or Utilities: Existing 2” water line east of Trosper Road.
Proposed improvement within Right-of-Way: One 1” water service line with a 2” PVC casing boring Trosper Road.
b. Applicant: North Alamo Water Supply Corporation
Legal Description: Lot 14 section 250 Texas-Mexican Railway Co. Survey (Pct. 4)
(Cesar Chavez Road and F.M. 2128)
Location of Pipeline or Utilities: Existing 4” water line east of Cesar Chavez Road.
Proposed improvement within Right-of-Way: One 6” water line with a 12” PVC casing boring Cesar Chavez Road.
BACKGROUND
Fiscal Impact
Attachments
Form Review
| Inbox | Reviewed By | Date |
|---|---|---|
| Budget and Management | Veronica Ortiz | 05/21/2020 03:33 PM |
| Final Approval | Monica Salinas | 05/22/2020 04:50 PM |
- Form Started By:
- Flor Castillo
- Started On:
- 05/21/2020 03:21 PM
- Final Approval Date:
- 05/22/2020