Planning Department   23.A.
CC REGULAR AGENDA REGULAR MTG
Meeting Date:
02/22/2022
Submitted For:
Flor Castillo
Submitted By:
Flor Castillo, PLANNING DEPT.
Department:
PLANNING DEPT.

CAPTION

1. Preliminary Approval with Variance Request
a. Replat of Lots 2, 3 and 4 Troy Subdivision- Pct. 1 (Buckeye Capital, LLC.) (Anderson Road & Valverde Road)
No. of Lots: 3 Single Family
Flood Zone: C
Estimated Number of Streetlights:N/A
Filling Stations:N/A
Drainage: Yes, Drainage will be provided by natural perculation and surface runoff will drain into Anderson Road side ditch.
ETJ: Yes, City of Donna.
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, OSSF’S.
Paved: Yes, Anderson Road is paved.

2. Preliminary Approval
a. Buddy Boulevard Subdivision- Pct. 3 (Yashiri Herrera) (Buddy Owens Blvd. & Goodwin Road)
No. of Lots: 1 Commercial
Flood Zone: C
Estimated Number of Streetlights:N/A
Filling Stations:1
Drainage: Yes, Drainage will be provided by onsite detention at building permit stage.
ETJ: Yes, City of Mission.
Water: Yes, provided by Agua SUD.
Sewer: Yes, OSSF.
Paved: Yes, Buddy Owens Blvd. and Goodwin Road are paved.

b. Punta Del Cielo Subdivision- Pct. 1 (Cayetano Development, LLC.) (Mile 4 ½ West Road & Mile 10 North Road)
No. of Lots: 123 Single Family
Flood Zone: X
Estimated Number of Streetlights:20
Filling Stations:8
Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by widening the existing drain ditch.
ETJ: Yes, City of Weslaco.
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, City of Weslaco.
Paved: Yes, Mile 4 ½ West Road is paved and 5 internal street to be paved.

3. Final Approval with Financial Guarantee
a. El Pinto Estates Ph. 1 Subdivision- Pct. 3 (Garvic Properties) (El Pinto Road & Mesquite Lane)
No. of Lots: 40 Single Family
Flood Zone: C
Number of Streetlights:6
Filling Stations:4
Drainage: Yes, Drainage will be provided by onsite detention areas along the rear of the lots.
ETJ: No, Rural Area.
Water: Yes, provided by Agua SUD.
Sewer: Yes, provided by Agua SUD.
Paved: Yes, El Pinto Road is paved and 1 internal street has been paved.
* Final Approval with a cash deposit in the amount of $22,590.00 for (PAVING, DRAINAGE & OTHER IMPROVEMENTS)

b. Border Town Phase 3 Subdivision- Pct. 4 (Border Town Development, LLC.) (F.M. 2812 & Uresti Road)
 No. of Lots: 109 Single Family
Flood Zone: X
Number of Streetlights:23
Filling Stations:12
Drainage: Yes, Drainage will be provided by storm sewer system discharging to an existing drain ditch.
ETJ: Yes, City of Edinburg.
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, OSSF’S have been escrowed.
Paved: Yes, Uresti Road and F.M. 2812 are paved.5 internal streets have been paved.
* Final Approval with a cash deposit in the amount of $237,088.89 for (PAVING & OTHER IMPROVEMENTS)
* Final Approval with a cash deposit in the amount of $163,500.00 for (109) OSSF’S

4. Final Approval
a. Vargas Subdivision- Pct. 3 (Cristo Salvador Vargas) (Mile 5 Road & Minnesota Road)
No. of Lots: 1 Single Family
Flood Zone: X
Number of Streetlights:N/A
Filling Stations:N/A
Drainage: Yes, Drainage will be provided by natural perculation and surface runoff onto Mile 5 Road side ditch.
ETJ: Yes, City of Mission.
Water: Yes, provided by Agua SUD.
Sewer: Yes, OSSF has been installed.
Paved: Yes, Mile 5 Road is paved.

b. Re-Subdivision of Lots 1 & 2 Owassa Springs Subdivision- Pct. 2 (The Three Rupperts I, LLC.) (Owassa Road & Cesar Chavez Road)
No. of Lots: 2 Single Family
Flood Zone: B
Number of Streetlights:N/A
Filling Stations:N/A
Drainage: Yes, Drainage for these 2 lots have been accounted for on previous Owassa Springs Subdivision.
ETJ: No, Rural Area.
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, OSSF’S have been installed.
Paved: Yes, Owassa Road is paved.

c. La Homa Crossing Subdivision Phase II - Pct. 3 (Red Rock Real Estate Dev., Group, LTD.) (La Homa Road & Mile 7 North Road)
No. of Lots: 41 Single Family 8 Commercial
Flood Zone: X
Number of Streetlights:14
Filling Stations:5
Drainage: Yes, Drainage will be provided by storm sewer system that will discharge to a detention area and further discharge into a TxDot system.
ETJ: Yes, City of Mission.
Water: Yes, provided by Sharyland Water Supply Corporation.
Sewer: Yes, OSSF’S have been installed.
Paved: Yes, La Homa Road is paved and 3 internal streets have been paved.

d. Las Encinitas Phase 2 Subdivision - Pct. 4 (CWL Limited by Three, L.L.C.) (Monte Cristo Road & Brushline Road)
No. of Lots: 99 Single Family 13 Commercial
Flood Zone: X
Number of Streetlights:24
Filling Stations:20
Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by widening the existing drain ditch.
ETJ: Yes, City of Edinburg.
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, OSSF’S have been installed.
Paved: Yes, Monte Cristo Road is paved and 6 internal streets have been paved.

BACKGROUND


Fiscal Impact

Attachments

Form Review

Inbox Reviewed By Date
Budget and Management Veronica Ortiz 02/17/2022 01:12 PM
Final Approval Monica Salinas 02/18/2022 05:27 PM
Form Started By:
Flor Castillo
Started On:
02/16/2022 04:05 PM
Final Approval Date:
02/18/2022