Skip to main content

AgendaQuick™

View Agenda Item

AI- 87647
Planning Department   20.A.
CC REGULAR AGENDA REGULAR MTG
Meeting Date:
09/27/2022
Submitted For:
Flor Castillo
Submitted By:
Flor Castillo, PLANNING DEPT.
Department:
PLANNING DEPT.

CAPTION

1. Preliminary Approval with Variance Request 
a.Hacienda San Miguel-Cisneros Subdivision- Pct. 4 (Mario Cisneros) (Tex-Mex Road & Sharp Road)
No. of Lots: 2 Single-Family
Flood Zone: X
Estimated Number of Streetlights:N/A
Filling Stations:N/A
Drainage: Yes, Drainage will be provided by natural perculation and surface runoff will drain into Tex-Mex Road side ditch.
ETJ: Yes, City of Edinburg
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, OSSF’S
Paved: Yes, Tex-Mex Road is paved.

b. Posz Estates Subdivision- Pct. 2 (Rebecca A. Posz Tamez) (Eldora Road & Cesar Chavez Road)
No. of Lots: 3 Single-Family
Flood Zone: X
Estimated Number of Streetlights:N/A
Filling Stations:N/A
Drainage: Yes, Drainage will be provided by natural perculation and surface runoff will drain into Eldora Road side ditch discharging onto an existing grated inlet.
ETJ: Yes, City of Alamo
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, OSSF’S
Paved: Yes, Eldora Road is paved.

2. Final Approval with Financial Guarantee
a. San Lucio No. 5 Subdivision- Pct. 1 (Tres Mundos Investments, LLC.) (Trenton Road & Dillon Road)
No. of Lots: 81 Single-Family
Flood Zone: C
Number of Streetlights:15
Filling Stations:6
Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by widening the existing drain ditch.
ETJ: Yes, City of Donna
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, OSSF’s have been escrowed.
Paved: Yes, Trenton Road and 4 internal streets are paved.
* Final Approval with a cash deposit in the amount of $36,000.00 for (24 OSSF’S)

3. Final Approval
a. A. Peña Subdivision- Pct. 4 (Rodolfo Peña) (Citrus Drive & Michelle Drive)
No. of Lots: 2 Single-Family
Flood Zone: X
Number of Streetlights:N/A
Filling Stations:N/A
Drainage: Yes, Drainage will be provided by natural perculation and surface runoff will drain into Citrus Drive road side ditch.
ETJ: Yes, City of McAllen.
Water: Yes, provided by Sharyland Water Supply Corporation.
Sewer: Yes, OSSF’S have been installed.
Paved: Yes, Citrus Drive is paved.

b. La Reserva Subdivision Phase I-C - Pct. 4 (La Reserva Ph. I, LTD.) (Benito Ramirez Road & Uresti Road)
No. of Lots: 6 Single-Family
Flood Zone: X
Number of Streetlights:N/A
Filling Stations:1
Drainage: Yes, Drainage will be provided by an existing storm sewer system and detention will be provided by the existing drain ditch.
ETJ: Yes, City of Edinburg.
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, OSSF’S have been installed.
Paved: Yes, Benito Ramirez Road and Uresti Road are paved.

c. La Reserva Subdivision Phase I-D - Pct. 4 (La Reserva Ph. I, LTD.) (Mile 20 North Road & Uresti Road)
No. of Lots: 6 Single-Family
Flood Zone: X
Number of Streetlights:N/A
Filling Stations:1
Drainage: Yes, Drainage will be provided by an existing storm sewer system and detention will be provided by the existing drain ditch.
ETJ: Yes, City of Edinburg.
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, OSSF’S have been installed.
Paved: Yes, Mile 20 North Road, Uresti Road and San Miguel Street are paved.
 

BACKGROUND


Fiscal Impact

Attachments

Form Review

Inbox Reviewed By Date
Budget and Management Veronica Ortiz 09/23/2022 09:07 AM
Final Approval Monica Salinas 09/23/2022 05:38 PM
Form Started By:
Flor Castillo
Started On:
09/22/2022 04:26 PM
Final Approval Date:
09/23/2022