|
CONSENT AGENDA HIDALGO COUNTY COMMISSIONERS COURT MEETING OCTOBER 29, 2024 10:00 A.M. |
|
NOTICE is hereby given in accordance with Chapter 551, Texas Government Code, that a SPECIAL MEETING of the Commissioners Court will be held in the Commissioners Courtroom of the Courthouse Annex III Building, 100 E. Cano, 1st floor, Edinburg, Hidalgo County, Texas. Discussion and possible action relating to the following business will be transacted:
NOTICE TO THE PUBLIC
CONSENT AGENDA
The following items are of a routine or administrative nature. The Commissioners Court has been furnished with background and support on each item, and/or it has been discussed at a previous meeting. All items will be acted upon by one vote without being discussed separately unless requested by a Commissioner, in which event the item or items will immediately be withdrawn for individual consideration in its normal sequence after the items not requiring separate discussion have been acted upon. The remaining items will be adopted by one vote.
2. Certificate of Water Service Availability under Texas Local Government Code Section 232.029 (c) (2)
a. Applicant: North Alamo Supply Corporation
Legal Description: 15.00 acres being all of Lot 9 and the north 5.00 acres of Lot 10 Texas Citrus Groves Unit 1; Proposed Grapefruit Acres Phase 4 Subdivision (Grapefruit Drive and Mile 5 ½ West Road) (Pct. 1)
Location of Pipeline or Utilities: Existing 8" waterline along the north side of Grapefruit Drive.
Proposed improvement within Right-of-Way: One 8" water line boring with a 16" PVC casing boring Grapefruit Drive.
b. Applicant: North Alamo Supply Corporation
Legal Description: Lot 2 Blk. 95 JC Engleman JR Subdivision and the east ½ section of 94 Texas Land & Irrigation Co. (F.M. 493 & Mile 19 North Road) (Pct. 1)
Location of Pipeline or Utilities: Existing 8" waterline along the north side of Mile 19 North Road.
Proposed improvement within Right-of-Way: One 3/4" water service line with a 2" PVC casing boring Mile 19 North Road.
c. Applicant: North Alamo Supply Corporation
Legal Description: Lot 8 & 9 Blk. 8 Santa Cruz Gardens Unit 3; Proposed Davis Groves at Villanueva Estates Subdivision (Doolittle Road & Davis Road) (Pct. 4)
Location of Pipeline or Utilities: Existing 12" waterline along the west side of Doolittle Road.
Proposed improvement within Right-of-Way: One 8" water line with a 16" PVC casing boring Ashley Avenue.
d. Applicant: North Alamo Supply Corporation
Legal Description: Lots 10-12 Blk. 29 Santa Cruz Gardens Unit 2 Subdivision (Tower Road & Ramseyer Road) (Pct. 4)
Location of Pipeline or Utilities: Existing 8" waterline along the east side of Tower Road.
Proposed improvement within Right-of-Way: One 3/4" water service line with a 2" PVC casing boring Tower Road.
e. Applicant: North Alamo Supply Corporation
Legal Description: Lot 1 of North Gate Manner (North Gate Avenue & F.M. 1426) (Pct. 1)
Location of Pipeline or Utilities: Existing 8" waterline along the south side of North Gate Avenue.
Proposed improvement within Right-of-Way: One 3/4" water service line with a 2" PVC casing boring North Gate Avenue .
f. Applicant: Spectrum (Project No. 4491682-SM39E
Proposed location of Power Supply Pole: Southwest of Circle 6 Street and Austen Street. (Pct. 3)
g. Applicant: Spectrum (Project No. 4491682-SM40E
Proposed location of Power Supply Pole: South of Austen Street approximately 240 feet east of Elva Street. (Pct. 3)
h. Applicant: Spectrum (Project No. 4787914-PA40E
Proposed location of Power Supply Pole: East of Jesus Flores Road approximately 520 feet south of Grapefruit Drive. (Pct. 1)
i. Applicant: Agua SUD
Legal Description: 7.50 Acres out of 10.00 of Lot 1 Nick Doffing Co. No. 5 (Doffing Road & Jessica Drive) (Pct. 3)
Location of Pipeline or Utilities: Existing 8" waterline along the west side of Doffing Road.
Proposed improvement within Right-of-Way: One 4" water service line with an 8" PVC casing boring Doffing Road.
j. Applicant: Agua SUD
Legal Description: All of Lot 10 of Koehn Subdivision (Brushline Road & Ariana Street) (Pct. 3)
Location of Pipeline or Utilities: Existing 8" waterline along the west side of Brushline Road.
Proposed improvement within Right-of-Way: One 1" water service line with a 2" PVC casing boring Brushline Road.
k. Applicant: Agua SUD
Legal Description: 6 acres out of Lot 30 Nick Doffing Co. No. 1 Subdivision (Brushline Road & Brushy Lane) (Pct. 3)
Location of Pipeline or Utilities: Existing 8" waterline along the west side of Brushline Road.
Proposed improvement within Right-of-Way: One 1" water service line with a 2" PVC casing boring Brushline Road.
l. Applicant: Agua SUD
Legal Description: 10.00 acres out of Lot 19 Blk. 10 Texan Gardens Subdivision (Western Road & Mile 6 Road) (Pct. 3)
Location of Pipeline or Utilities: Existing 8" waterline along the east side of Western Road.
Proposed improvement within Right-of-Way: One 1" water service line with a 2" PVC casing boring Western Road.
m. Applicant: Sharyland Water Supply Corporation
Legal Description: .04 acres northwest of a section being a private road .22 acres net out of John H. Shary Subdivision (Taylor Road & Mile 6 North Road) (Pct. 3)
Location of Pipeline or Utilities: Existing 2.5" waterline along the north side of Mile 6 North Road.
Proposed improvement within Right-of-Way: One 1" water service line with a 2" PVC casing boring Mile 6 North Road.
a. Oakview No. 1 Subdivision- Pct. 3 (Los Encinos Rental Properties, LLC.) (Mile 7 North Road & Texan Road)
No. of Lots: 1 Multi-Family
Flood Zone: X
Estimated Number of Streetlights: N/A
Filling Stations:1
Drainage: Yes, Drainage will be provided by onsite detention at the building permit stage.
ETJ: No, Rural Area.
Water: Yes, provided by Agua SUD
Sewer: Yes, OSSF
Paved: Yes, Mile 7 North Road is paved.
b. Oakview No. 2 Subdivision- Pct. 3 (Los Encinos Rental Properties, LLC.) (Texan Road & Mile 5 North Road)
No. of Lots: 1 Single-Family
Flood Zone: X
Estimated Number of Streetlights: N/A
Filling Stations:N/A
Drainage: Yes, Drainage will be provided by natural perculation and surface runoff will drain into Texan Avenue.
ETJ: Yes, City of Mission.
Water: Yes, provided by Agua SUD
Sewer: Yes, OSSF
Paved: Yes, Texan Road is paved.
c. DLG Subdivision- Pct. 4 (Julio Leonel De La Garza) (Monmack Road & Mile 17 ½ North Road)
No. of Lots: 3 Single-Family
Flood Zone: X
Estimated Number of Streetlights:1
Filling Stations:1
Drainage: Yes, Drainage will be provided by natural perculation and surface runoff will drain into Monmack Road.
ETJ: Has been removed from ETJ of Edinburg.
Water: Yes, provided by Sharyland Water Supply Corporation
Sewer: Yes, OSSF'S.
Paved: Yes, Monmack Road is paved and 1 internal street to be paved.
d. Sunset Acres Subdivision- Pct. 4 (Albino Trejo) (Tower Road & Mile 17 North Road)
No. of Lots: 3 Single-Family, 1 Commercial
Flood Zone: X
Estimated Number of Streetlights: N/A
Filling Stations: N/A
Drainage: Yes, Drainage will be provided by natural perculation and surface runoff will drain into Tower Road side ditch.
ETJ: Has been removed from ETJ of Edinburg.
Water: Yes, provided by North Alamo Water Supply Corporation
Sewer: Yes, OSSF'S.
Paved: Yes, Tower Road is paved.
e. Ranchettes at McColl Subdivision- Pct. 4 (Sauls Development, LLC.) (Rio Grande Care Road & Monte Cristo Road)
No. of Lots: 5 Single-Family
Flood Zone: AE
Estimated Number of Streetlights: N/A
Filling Stations: 2
Drainage: Yes, Drainage will be provided by natural perculation and surface runoff will drain into Rio Grande Care Road side ditch.
ETJ: Has been removed from ETJ of Edinburg.
Water: Yes, provided by Sharyland Water Supply Corporation
Sewer: Yes, OSSF'S.
Paved: Yes, Rio Grande Care Road is paved.
f. Gwin Ranches Subdivision- Pct. 1 (Garco, LTD.) (Benito Ramirez Road & Gwin Road)
No. of Lots: 13 Single-Family
Flood Zone: X
Estimated Number of Streetlights: N/A
Filling Stations:3
Drainage: Yes, Drainage will be provided by natural perculation and surface runoff will drain into Gwin Road and Benito Ramirez Road.
ETJ: Has been removed from ETJ of Edinburg.
Water: Yes, provided by North Alamo Water Supply Corporation
Sewer: Yes, OSSF'S.
Paved: Yes, Gwin Road and Benito Ramirez Road are paved.
g. Baseline Acres No. 2 Subdivision- Pct. 1 (1960 Inv., Co., LLC.) (Mile 11 ½ North Road & F.M. 491)
No. of Lots: 35 Single-Family
Flood Zone: X
Estimated Number of Streetlights: 5
Filling Stations: 2
Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by widening the existing drain ditch.
ETJ: No, Rural Area.
Water: Yes, provided by North Alamo Water Supply Corporation
Sewer: Yes, OSSF'S.
Paved: Yes, Mile 11 ½ North Road and 1 internal street are to be paved.
h. RBR No. 6 Subdivision- Pct. 4 (RBR Dev., & Inv.) (Benito Ramirez Road & Skinner Road)
No. of Lots: 36 Single-Family
Flood Zone: X
Estimated Number of Streetlights: 7
Filling Stations:3
Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by widening the existing drain ditch.
ETJ: Has been removed from ETJ of Edinburg.
Water: Yes, provided by North Alamo Water Supply Corporation
Sewer: Yes, OSSF'S.
Paved: Yes, Benito Ramirez is paved and 1 internal street to be paved.
i. Altamura Subdivision- Pct. 1 (RD Altamura, LLC.) (Mile 12 North Road & Mile 5 West Road)
No. of Lots: 65 Single-Family
Flood Zone: X
Estimated Number of Streetlights: 23
Filling Stations: 10
Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by widening the existing drain ditch.
ETJ: Yes, City of Weslaco.
Water: Yes, provided by North Alamo Water Supply Corporation
Sewer: Yes, OSSF'S.
Paved: Yes, F.M. 88 is paved and 6 internal streets are to be paved.
j. Las Gaviotas Subdivision- Pct. 1 (PDP Mile 4 LTD.) (Eldora Road & Valverde Road)
No. of Lots: 54 Single-Family
Flood Zone: C
Estimated Number of Streetlights: 9
Filling Stations: 5
Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by widening the existing drain ditch.
ETJ: Yes, City of Donna.
Water: Yes, provided by North Alamo Water Supply Corporation
Sewer: Yes, OSSF'S.
Paved: Yes, Valverde Road and Eldora Road are paved.Three internal streets are to be paved.
| 09/26/2024 - 10/09/2024 | $555,863.28 |
| 10/10/2024 - 10/16/2024 | $658,695.43 |
| Total | $1,214,558.71 |
2. Approval of wire transfer to cover claims paid.
Requesting approval of reimbursement of the Hidalgo County Workers' Comp. Claims paying account for claims paid by Tristar Risk Management for the period of 10/01/2024 - 10/15/2024 in the amount of $44,751.19 and requesting approval of wire transfer.
| NO | ACCOUNT NUMBER | PAYER | AMOUNT |
| 1. | H3471.00.000.0049.00 | LOANCARE | $4,073.83 |
| 2. | N1250.00.000.0015.00 | JUAN CORTEZ | $6,975.08 |
| 3. | P0600.99.001.0002.08 | CIRION TECHNOLOGIES SOLUTIONS LLC | $7,016.07 |
| 4. | S6805.00.000.0006.00 | NEU HAUS CONSTRUCTION & DEVELOPMENT LLC | $3,771.73 |
| NO | ACCOUNT NUMBER | PAYER | AMOUNT |
| 1. | H0850.00.003.0030.00 | ANGEL WEYER | $14,320.69 |
| 2. | H0850.00.003.0030.00 | ANGEL WEYER OR COMMERCIAL BANK | $27,309.71 |
| 3. | J5700.00.014.0008.00 | RIO FRESH | $5,128.50 |
| 4. | S6430.00.000.0080.00 | LAZARO TREVINO | $2,573.80 |
Requesting approval for requisition #504573 to the National Narcotic Detector Dog Association for Armando Pena and K9, Juan Moreno and K9, Juan Flores and K9, Jaime Garcia and K9, Isidro Perez and K9, Ruben Gallegos and K9, Edward Garza and K9 in the amount of $55.00 each for membership dues with authority for the County Treasurer to issue check after auditing procedures are completed by County Auditor.
Requesting approval to pay Intermediate Fire Inspector Certification application for Mentor Cantu (PIN 4373831) in the amount of $85.00 payable to the Texas Commission on Fire Protection with authorization for County Treasurer to issue payment once auditing procedures are completed by County Auditor.
Requesting approval to pay $335.00 to International Association of Arson Investigators for annual membership 10/02/2024 - 10/02/2025 for Homero Garza, Eric L. Sanchez, and Oscar Lopez with authorization for County Treasurer to issue payment once auditing procedures are completed by County Auditor.
Requesting approval to pay 2024-2025 membership dues to the Government Finance Officer's Association in the amount of $3,050.00 (REQ#00504101) for Ms. Leticia Chavez, County Auditor, Mr. Reynaldo Cantu III, First Asst. Auditor, Mrs. Merlen Munoz, Director of Accounting Division, Mr. Ray Morin, Finance Accounting Supervisor, Ms. Claudia Ortiz, Finance Accounting Supervisor, and Ms. Sandra Reyes, Accountant IV; with authority for the County Treasurer to issue check after review, audit, and processing procedures are completed by the County Auditor.
Approval of 2024 interfund transfer from Transfers In/Out (prog. 005, FY 5) to Transfers In/Out (prog. 020, FY 5) in the amount of $20,000.00 to properly allocate the cash match funds required for the FY 2025 interlocal agreement between Hidalgo County Constable Pct. 3, Hidalgo Co. Irrigation District No. 6, United Irrigation District, and Hidalgo Co. Irrigation District No. 16.
1. Approval of the following salary schedule changes in accordance with Hidalgo County Classification and Compensation Pay Plan effective as indicated and for calendar year 2025:
| FROM | TO | |||||||
| Action | Dept/Prg. | Slot | Position Title | G/S | Budgeted Salary | G/S | Proposed Salary | Effective Date |
| Budget Adjustment (Promotion) | 122-006 | 0107 | Equipment Operator II | 08/01 | $36,882.00 | 08/03 | $39,509.00 | 10/07/2024 |
2. Approval of the following salary schedule changes in accordance with the Hidalgo County Law Enforcement Pay Plan effective as indicated and for calendar year 2025:
| FROM | TO | |||||||
| Action | Dept/Prg. | Slot | Position Title | R/S | Budgeted Salary | R/S | Proposed Salary | Effective Date |
| Budget Adjustment (Lateral) | 294-001 | 0022 | Communications Officer | 02/02 | $39,460.00 | 02/03 | $40,841.00 | 10/21/2024 |
A. FOR ANY CONTRACTS(S) AWARDED AND APPROVED UNDER THIS AGENDA, EXECUTED COPIES OF THE CONTRACT(S) WILL BE AVAILABLE ON THE COUNTY INTRA-NET WEBSITE AND WILL BE FORWARDED VIA E-MAIL, FAX OR HAND DELIVERED TO HIDALGO COUNTY AUDITOR'S OFFICE.
B. ANY AND ALL REQUESTS FOR PAYMENT(S) APPROVED WILL BE SUBJECT TO COUNTY AUDITORS PROCESSING PROCEDURES INCLUDING AUTHORITY FOR COUNTY TREASURER TO ISSUE PAYMENT(S)/CHECK(S).
| Quantity | Year | Make | Model | Total Monthly Payment | Status |
| 1 | 2024 | Chevrolet | Traverse | 866.31 | In-Stock |
| 1 | 2024 | Ford | F-150 4X4 | 966.11 | In-Stock |
| Invoice No. | Invoice Date | PO No. | Total Amount |
| 30067 | 10-14-2024 | 872817 | $3,113.78 |
| 10128337 | 10-11-2024 | 862136 | $411.75 |
| Invoice No. | Date | Project Name | PO No. | Total Amount |
| 30064 | 10-8-2024 | Mile 3 N. Rd. | 823768 | $3,839.77 |
| Invoice Date | Project Name | Vendor Name | ARPA Project Number | P.O. Number | Invoice Number | Invoice Amount |
| 09/16/2024 | NMD III Phase I | The 5125 Company | 22-124-095 | 869057 | Final | $76,874.20 |
| 10/10/2024 | Tex-Mex Rd | Rene Guerra & Sons | 22-124-047 | 875786 | 5 | $70,423.50 |
| 10/14/2024 | Bentsen Rd SW | B2Z Engineering | 22-124-094 | 868482 | 40243 | $823.21 |
| 10/10/2024 | J-01 | Tedsi Engineering | 23-124-346 | 875089 | 203033 | $8,518.74 |
Requesting acceptance and approval of project invoices listed below;
| Invoice Date | Project Name | Vendor Name | Invoice Number | P.O. Number | Invoice Amount |
| 10/10/2024 | Trenton Roadway | Tedsi | 203037 | 859188 | $42,662.77 |
| 10/17/2024 | Linn San Manuel Canopy | RO Engineering | 1012401 | 878935 | $33,104.00 |
| Department | Adding Vehicle to Issue Card | Delete Vehicle to Delete Card | Add a Driver | Delete Driver | Replaced Fuel Card | |
| 1 | Constable P-1 | 2 | ||||
| 2 | Constable P-2 | 1 | ||||
| 3 | Constable P-3 | 3 | 13 | |||
| 4 | Constable P-4 | 3 | ||||
| 5 | Facilities Management | 15 | 1 | 10 | 3 | |
| 6 | Adult Probation | 1 | 3 | 11 | 8 | |
| 7 | Planning Department | 2 | 1 | |||
| 8 | Health & Human Services | 1 | 19 | |||
| 9 | Emergency Management | 4 | 1 | 1 | ||
| 10 | Tax Office | 1 | 1 | |||
| 11 | WIC Department | 2 | ||||
| 12 | Elections Department | 3 | 2 | |||
| 13 | Human Resource Department | 1 | 1 | |||
| 14 | Texas A&M AgriLife | 1 | ||||
| 15 | HeadStart Program | 3 | ||||
| 16 | Purchasing Department | 1 | 1 | |||
| 17 | Juvenile Department | 1 | 2 | 2 | ||
| 18 | Sheriff's Office | 2 | 2 | |||
| Totals | 32 | 10 | 61 | 26 | 0 |
B. Requesting approval to enter into a one (1) year subscription agreement for Asset Management Program with Grokability, Inc., in the total amount of $999.99
| Work Authorization # | PO # | Invoice # | Invoice Date | Amount |
| 2 | 872577 | 30066 | 10/14/2024 | $4,761.58 |
| PO # | Invoice # | Invoice Date | Amount |
| 873313 | 3311 | 10/22/2024 | $16,810.30 |
| PO # | Invoice # | Invoice Date | Amount |
| 853723 | 10128336 | 10/11/2024 | 362.34 |
