![]() |
CITY OF LORAIN
|
2.h.
Board of Control
- Meeting Date:
- 05/06/2026
Subject:
The Black River WWTP requests approval for the repair of the rotating assembly for a Fairbanks Morse pump from Replica Engineering Inc. This pump is part of the headworks system leading into the Black River WWTP and is vital to facility operations. This repair constitutes a specialized service requiring full disassembly of the pump assembly in order to properly evaluate and quote the necessary work. Based on the vendor’s assessment, the rotating assembly requires a complete rebuild, including extensive machining. Due to the technical nature of the repair and the need for detailed inspection prior to providing an accurate estimate, this work is being performed as a specialty service. The total cost for parts and labor is $12,000. Funding for this purchase will be allocated from the facility improvement portion of the budget 6130.P613.6310.6700.1500.
Attachments
- BOC - BRWWTP - Repair Fairbanks Morse Pump - Replica Engineering
- Quote - BRWWTP - Repair Fairbanks Morse Pump - Replica Engineering
